Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix C - Code Assessment

of 56

Page text shows just the words. Original shows the document exactly as it was published.

Reconfiguring a Lot Code




PO19                                                         AO19.1                                                         AO19.1 – AO19.3 – Not Applicable
Land provided for active recreation areas is of a physical   Active parkland is of a usable shape free of irregular         The proposed development is not required to provide
standard and condition suitable for the intended uses        boundaries.                                                    active parkland.
and is not subject to physical or other constraints
including contamination, environmental or biophysical        AO19.2
constraints or legislative protection that would encumber    Active parkland is located on land that is exclusive of—
its use.
                                                                 a)   flood inundation below the 20% AEP (1:5
                                                                      year ARI level);
                                                                 b)   land affected by stormwater or overland flow
                                                                      discharge from adjacent allotments;
                                                                 c)   drainage reserves and detention basins, which
                                                                      cannot be shown to safely and effectively
                                                                      contribute to the network of parks and open
                                                                      space areas;
                                                                 d)   land with a slope, or subject to cut or fill with a
                                                                      batter slope, that exceeds a slope of 15%;
                                                                 e)   areas of land less than 15 metres wide, such
                                                                      as access and service and utility easements;
                                                                 f)   land required to serve primarily as a buffer area
                                                                      to any existing development or major transport
                                                                      corridor; and
                                                                 g)   power easements.

                                                             AO19.3
                                                             At least 10% of the total open space provision for active
                                                             parkland is exclusive of flood inundation below the
                                                             1% AEP (1:100 year ARI level or the highest recorded
                                                             flood level), whichever is the greatest.
Log in to download the original file

Appendix C - Code Assessment.pdf · 649 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.