Original source · versioned page text
Appendix C - Code Assessment
Reconfiguring a Lot Code
construction of stormwater management infrastructure regime.
a) maintains the natural flow regime; are addressed in Part 9.4.9 Water Quality and Drainage
b) effectively manages stormwater quality and code
quantity; and
c) ensures no adverse impacts on receiving
waters and surrounding land.
Conflicting land uses Table 9.5.1.3 Criteria for assessable development (part)
Performance outcomes Acceptable outcomes Assessment
Growth Management
Conflicting land uses
PO25 PO25 – Complies
New lots for residential development do not adjoin land No acceptable outcome provided
located in the Medium impact industry zone or the Low The site does not adjoin industrial land.
impact industry zone.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.