Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Appendix C - Code Assessment

of 56

Page text shows just the words. Original shows the document exactly as it was published.

Reconfiguring a Lot Code



                                                          construction of stormwater management infrastructure     regime.
    a)   maintains the natural flow regime;               are addressed in Part 9.4.9 Water Quality and Drainage
    b)   effectively manages stormwater quality and       code
         quantity; and
    c)   ensures no adverse impacts on receiving
         waters and surrounding land.




Conflicting land uses Table 9.5.1.3 Criteria for assessable development (part)


Performance outcomes                                      Acceptable outcomes                                      Assessment
Growth Management
Conflicting land uses

PO25                                                                                                               PO25 – Complies
New lots for residential development do not adjoin land   No acceptable outcome provided
located in the Medium impact industry zone or the Low                                                              The site does not adjoin industrial land.
impact industry zone.
Log in to download the original file

Appendix C - Code Assessment.pdf · 649 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.