Original source · versioned page text
Attachment D - Tree Management Plan
Plans and drawings: the text below has words only, no drawings.
4 Trees 2-6 looking west In summary it is only Trees 1, 2 and 3 whose TPZ will be impacted significantly. In the case of Tree 1 it is possible that the final trench location may be able to avoid the TPZ. Taylor Ecology Tree Management Plan – June 2019 Sunshine Beach SLSC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original