Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment D - Tree Management Plan

Attached to the e-mail Operational Works Application OPW19/0157 - Cover Letter - DA Form 1 - Sub Station Detail Sheet 1, 2 & 3 -Montage existing - Montage Proposed - Consultant Advice Notice - Tree Management Plan - The Esplanade Sunshine Beach.

of 6

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                              4




Trees 2-6 looking west




In summary it is only Trees 1, 2 and 3 whose TPZ will be impacted significantly. In the case of
Tree 1 it is possible that the final trench location may be able to avoid the TPZ.



Taylor Ecology                  Tree Management Plan – June 2019             Sunshine Beach SLSC
Log in to download the original file

Attachment D - Tree Management Plan.pdf · 649 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.