G - Engineering Code Assessment

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

‘ih

Property
Projects
Australia

Appendix G - Engineering Code Assessment

 

Prepared bu:
Barlow Shelley Consulting Engineers

 

Toowoomba Brisbane
216 Herries Street, Toowoomba 618 Brunswick Street, New Farm
Phone: 07 4632 0516 Phone: 07 3254 1566

30
Log in to download the original file

G - Engineering Code Assessment.pdf · 131 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 17 pages

Page 2

ENGINEERING CODE ASSESSMENT


               In Association with the
         Material Change of Use Application
 for the Proposed Duplex Residential Development
                       at

        11 Margit Crescent, Sunrise Beach

              Lot 135 on RP132135
                       for

       Primo Property Management Pty Ltd




                                  Ref: 2008-ECA-01_Version 1.0
                                                    April 2020

Page 3

DOCUMENT INFORMATION

 Document Title:                                Engineering Code Assessment


 Document Reference No.                         2008-ECA-01 – Version 1.0


 Commissioned By:                               Primo Property Management Pty Ltd


 Prepared By:                                   Barlow Shelley Consulting Engineers Pty Ltd


 Author:                                        Cameron Landreth (BEng, NER, RPEQ)


 Reviewed & Authorised By:                      Cameron Landreth (BEng, NER, RPEQ)


DOCUMENT CONTROL

        Version                        Date                       Author                      Reviewer


           1.0                   14 April, 2020             Cameron Landreth             Cameron Landreth


“©2020 Barlow Shelley Consulting Engineers Pty Ltd All Rights Reserved. Copyright in the whole and every part of this
document belongs to Barlow Shelley Consulting Engineers Pty Ltd and may not be used, sold, transferred, copied or
reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written of
Barlow Shelley Consulting Engineers Pty Ltd”

Page 4

SUMMARY

The proposed development requires assessment against the following Council codes as
part of a Development Application (codes found within Council’s Noosa Plan 2006
Planning Scheme):
   ·   Existing Services Code
   ·   Earthworks Code
   ·   Erosion and Sediment Control Code
   ·   Driveways and Car Parking Code




Consideration of the overall principles of the Transport, Roads and Drainage Code, Waste
Management Code, and Water Sensitive Design code is also included.


We consider that the responses given adequately address the requirements for the
development site at the time the assessment was undertaken. If the development
proposal changes, the responses provided should be reviewed and revised as necessary.


AUTHORED BY:



_________________________________________
CAMERON LANDRETH - Director
BEng, (Hons), NER, RPEQ (19358)
For and on behalf of:
BARLOW SHELLEY CONSULTING ENGINEERS

Page 5

CONTENTS


1.0   EXISTING SERVICES CODE ........................................................................................... 5

2.0   EARTHWORKS CODE .................................................................................................... 7

3.0   EROSION AND SEDIMENT CONTROL CODE .............................................................. 10

4.0   DRIVEWAYS AND CAR PARKING CODE..................................................................... 12

5.0   OTHER CODE REVIEWS............................................................................................... 17

Page 6

1.0 EXISTING SERVICES CODE


Performance Outcomes               Acceptable Outcomes                response

PO1                                S1.1 The footing of any            S1.1. Complies. Development
                                   structure or building is located   is generally within QDC
Development near a sewer,          clear of the zone of influence     property setbacks and ~4.5m
water main, stormwater drain,      but no closer than 1.5m            from sewer at rear of property.
overland flow path or              (measured horizontally) from
associated structure does          infrastructure including
not—                               sewers, water mains and
                                                                      S1.2, S1.3, S1.4, S1.5 and
                                   stormwater structures; AND
a) adversely affect the function                                      S1.6 – complies see above
of the service;                    S1.2 No building or structure
                                   overhangs the zone of
b) place an additional load on
                                   influence; AND
the service; and
                                   S1.3 Finished surface levels
c) unduly increase future
                                   maintain a minimum of 600mm
maintenance costs.
                                   of cover, but no greater than
                                   3m of cover to the
                                   underground infrastructure;
                                   AND

                                   S1.4 If the existing surface
                                   level is altered, surface level
                                   services including manholes
                                   and inspection points are
                                   altered to match the new
                                   surface level; AND

                                   S1.5 Alterations are
                                   constructed in accordance with
                                   Section 4 of PSP5 –
                                   Engineering Design Standards
                                   – Roads, Drainage and
                                   Earthworks and applicable
                                   water and sewerage design
                                   standards; OR

                                   S1.6 Existing services are
                                   relocated and the design and
                                   construction of the relocated
                                   services is in accordance with
                                   Section 4 of PSP5 –
                                   Engineering Design Standards
                                   – Roads, Drainage and
                                   Earthworks and applicable
                                   water and sewerage design
                                   standards.

PO2                                S2.1 For trunk infrastructure a    Complies
                                   registered easement in favour
Maintenance access is              of Council is created over all     Easement requirements shall
provided to all sewers, water      underground infrastructure         be in accordance with a future
mains, stormwater drains,                                             Connection Approval to be

Page 7

Performance Outcomes      Acceptable Outcomes             response

overland flow paths and   located in private property;    decided and issued by
associated structures.    AND                             Unitywater

                          S2.2 The width of the
                          easement is the greater of 3m
                          or the width of the zone of
                          influence; AND

                          S2.3 The easement is centred
                          over the centreline of the
                          infrastructure

Page 8

2.0 EARTHWORKS CODE

 Performance outcomes               Acceptable outcomes                    Assessment Outcomes

 PO1                                S1.1 The finished surface             The land generally slopes
                                    gradient of any filled or excavated   towards Margit Crescent
 Finished surface levels ensure     area is within the range 0.5% to      at 7%
 land is free draining.             1.5% and drains to Council’s
                                    stormwater infrastructure where
                                    available or where stormwater
                                    infrastructure is not available,
                                    toward the street.




 PO2                                No solution provided.                 Complies. The proposed
                                                                          development maintains
Any change to the level of the                                            the existing drainage
land does not have an adverse                                             regime and is of a scale
flooding impact on the flooding                                           consistent to the existing
and drainage characteristics off-                                         site land use.
site.


 PO3                                S3.1 Filling works are undertaken     Complies.
                                    in accordance with Section 2.8-       Site earthworks will be
 Earthworks do not result in        Filling of Site of Council’s PSP5 -   typically excavation and
 geotechnical instability on the    Engineering Design Standards-         removal. These works are
 premises or nearby premises.       Roads and Drainage &                  to be undertaken to
                                    Earthworks AND                        construct the garage and
                                                                          will form part of the
                                    S3.2 Where the filling is for         Building works
                                    residential commercial or             assessment with respect
                                    industrial purposes the works         to the structure required
                                    comply with Australian Standard -     to retain the excavation.
                                    Guidelines for earthworks on
                                    commercial & residential
                                    development.

 PO4                                S4.1 The following control            Complies.
                                    measures are implemented—
Earthworks do not cause
disturbance to the amenity of the   a) regular water spraying of          Nuisance control
                                                                          measures as described in
neighbouring land.                  exposed areas to suppress dust;
                                                                          S4.1 and S4.2 can be
                                    b) provision of dust stabilised or    implemented on site.
                                    sealed internal roads;

                                    c) protective covering of exposed
                                    areas that are left for more than 2
                                    weeks; and

                                    d) if there is no valid development

Page 9

 Performance outcomes                  Acceptable outcomes                      Assessment Outcomes

                                       permit for the site, disturbed
                                       areas are revegetated using
                                       species identified in PSP3 -
                                       Landscaping Plants and
                                       Guidelines; AND

                                       S4.2 Earthworks are undertaken
                                       only during the hours of 7am to
                                       6pm, Monday to Friday and 7am
                                       to 6pm on Saturday. No work is
                                       undertaken on Sunday or public
                                       holidays.

 PO5                                   S5.1 Cleared vegetation is              Complies
                                       transported off-site for disposal in    Vegetation removal
Vegetation cleared from a              an approved green waste                 during development
development site is disposed of        disposal facility; OR                   works can comply with
in an environmentally responsible
                                                                               S5.1 to S5.3
manner.                                S5.2 Cleared vegetation is
                                       mulched on-site and reused for
                                       landscaping of the finished
                                       development; OR

                                       S5.3 Cleared vegetation is
                                       disposed of for the purpose of
                                       firewood. (Note: Disposal of
                                       vegetative waste by burning off is
                                       not an acceptable method of
                                       disposal).

 PO6                                  S6.1 The fill material is solid clean    Not Applicable.
                                      earth, free of putrescible or refuse      Negligible filling
Materials used as fill are suitable   material, vegetation, acid sulfate       proposed or with site spoil
for development of the land and       soils, building or construction          only.
filling or excavation works do not    material or other material or
result in the contamination of land   contaminants; AND
                                      S6.2 The site is not on the
                                      contaminated land register.
 PO7                                   No solution provided                    The haulage route is to be
                                                                               determined by the
 Haulage of material to and from                                               contractor and supplied to
 a site ensures—                                                               Council at their request
                                                                               prior to commencement of
 a) minimal disturbance to
                                                                               works
 neighbouring properties and
 properties along the haulage
 route; and

 b) Council’s road infrastructure
 including pavements is not
 adversely affected.

 PO8                                   S8.1 All earthworks, including cut      Complies
                                       and fill batters, retaining walls etc
 Earthworks are contained within       are contained within the subject

Page 10

 Performance outcomes                  Acceptable outcomes                      Assessment Outcomes

 the subject property.                 site.

 PO9                                   S9.1 Cut or fill is less than 2m in     Excavation for the
                                       depth relative to the natural           garage/basements is
On sloping sites, excavation or        ground surface.                         estimated at 3.1m these
filling are designed to maximise                                               works are part of the
the use of natural slope and                                                   dwelling structure and
minimise the need for cut and fill.                                            shall be undertaken in
                                                                               accordance with a future
                                                                               geotechnical investigation
                                                                               for the subject site.
 PO10                                  No solution provided.                   Complies – no drainage
                                                                               lines, native veg etc. on
 Earthworks minimise any                                                       the subject site.
 adverse impact upon
 groundwater, watercourses,
 drainage lines, wetlands, and
 native vegetation.

 PO11                                 S11.1 Where the site is in the           Not Applicable
                                      Rural Zone—
 Dam location and construction
                                      a) the land has a slope of less than
 does not impact upon
                                      25% (1:4); and
 neighbouring properties in terms
 of—                                  b) the earthworks including cut and
                                      fill batters and retaining walls are
 a) hydrology;                        setback a minimum of 50m from
                                      the property boundary; and
 b) alteration of existing overland
                                      c) the size of the lot is greater than
 flowpaths and patterns;
                                      5 hectares; AND
 c) landslide or failure of dam       S11.2 Where the site is in the
 wall; and                            Rural Settlement Zone or the Rural
                                      Zone where the lot is less than 5
 d) effluent disposal areas.          hectares—
                                      a) the land has a slope of less than
                                      1:6; and
                                      b) the earthworks including cut and
                                      fill batters and retaining walls are
                                      setback a minimum of 20m from
                                      the property boundary; and
                                      c) involving less than 500m3 of
                                      material; AND
                                      S11.3 For all other zones— No
                                      solution provided.

Page 11

3.0 EROSION AND SEDIMENT CONTROL CODE

Performance outcomes                Acceptable outcomes                 response

PO1                                 S1.1 Construction works are        Complies
                                    designed, planned and
Development design, density,        executed with respect to the       Erosion and sediment control
layout, and staging provide for     principles of erosion reduction,   measures shall be
erosion control, drainage control   drainage management and            implemented on site in
and sediment capture and            sediment capture in accordance     accordance with Healthy
treatment during the                with Appendix 2, Table A of the    Waterways best practice
construction phase.                 Queensland State Planning          management of erosion and
                                                                       sediment control during
                                    Policy and International Erosion
                                                                       construction, and the
                                    Control Association Best
                                                                       requirements of the QLd
                                    Practice Erosion and Sediment
                                                                       SPP (2017) Appendix 2
                                    Control (BPESC) 2008; AND
                                                                       Table A.
                                    S1.2 Construction works are
                                    designed and managed to
                                    restrict the extent of clearing
                                    and soil exposure to that
                                    necessary for access, and safe
                                    construction; AND

                                    S1.3 Clean stormwater is
                                    diverted or managed around or
                                    through the site without
                                    increasing the concentration of
                                    total suspended solids or other
                                    contaminants in the flow and
                                    without causing erosion (onsite
                                    or offsite); AND

                                    S1.4 Cleared areas are
                                    effectively stabilised prior to
                                    rainfall if works are delayed or
                                    works are not intended to occur
                                    immediately; AND

                                    S1.5 For buildings,

                                    a) upstream runoff must be
                                    diverted around the construction
                                    site; and

                                    b) sediment barriers are
                                    provided downslope of
                                    disturbed areas to prevent
                                    sediment washing into gutters,
                                    drains and watercourses either
                                    on or off the site; and

                                    c) exposed soil and construction
                                    access must be managed in
                                    accordance with International
                                    Erosion Control Association
                                    Best Practice Erosion and

Page 12

                                 Sediment Control (BPESC)
                                 2008; and

                                 d) temporary or permanent
                                 downpipes are connected to the
                                 stormwater system before
                                 laying the roof; or

                                 e) localised erosion is avoided
                                 by directing flow from
                                 downpipes over non-erosive
                                 areas

PO2                              S2.1 Work within waterways        Not Applicable
                                 must be undertaken in
Construction activities within   accordance with Best Practice
watercourses are planned to      Erosion and Sediment Control,
prevent erosion, construction    Appendix I – Instream works,
failure and associated           Sections 14 and 16
sedimentation.                   International Erosion Control
                                 Association 2008.

                                 S2.2 Temporary vehicular
                                 crossings of waterways must be
                                 designed and constructed to
                                 convey flows for the 50%AEP
                                 event and remain stable for all
                                 rainfall events up to 10%AEP
                                 event.

Page 13

4.0 DRIVEWAYS AND CAR PARKING CODE

Performance Outcomes             Acceptable Outcomes             response

PO1                              S1.1 Vehicular access is        Complies
Vehicular access does not        located and designed in
adversely impact on              accordance with                 Vehicle access to the subject
safety, capacity and             AS/NZS2890.1:2004;              site shall be the same as the
operations of the existing or    AND                             exisitng use which is via the
planned road network, the        S1.2 Only one footpath          Margit Crescent frontage.
proposed driveway,               crossing is provided;
cycleways or pedestrian          AND                             An individual crossing is
pathway systems.                 S1.3 Driveways, have a          proposed for each lot/dwelling
                                 maximum grade in
                                 accordance with Council’s       Driveways shall be
                                 standard requirements.          constructed as per IPWEAQ-
                                                                 RS-049 and RS-050 standard
                                                                 drawings
PO2                              S2.1 Design of the driveway     Complies
                                 across the footpath is in
Driveways and crossovers—        accordance with Council’s       As above, the driveway
                                 Standard Drawing                crossover positions, shape
a) are suitable and safe for                                     and longitudinal grades are to
                                 requirements as appropriate
their intended use; and                                          comply with council standard
                                 for the particular type of
                                 development as annotated on     drawings IPWEAQ RS-049
b) match Council
                                 the drawings;                   and RS-050
infrastructure.
                                 AND

                                 S2.2 Driveways are designed
                                 and constructed in
                                 accordance with Council
                                 Standard Drawing
                                 requirements , as appropriate
                                 for the particular type of
                                 development as annotated on
                                 the drawings;
                                 AND

                                 S2.3 The change in grades in
                                 the driveways and ramps is in
                                 accordance with Council’s
                                 Standard Drawing
                                 requirements.
PO3                              S3.1 Design of multi-tenanted   Not Applicable
                                 developments in commercial
In commercial zoned areas,       zoned areas include shared
the number of driveways          driveways and parking areas;
across pedestrian footpaths is   AND
minimised.
                                 S3.2 Driveways are located so
                                 they abut existing driveways
                                 of adjoining development
                                 where practicable and
                                 reciprocal easements are
                                 created to reduce the sealed

Page 14

Performance Outcomes             Acceptable Outcomes                   response

                                 driveway width.

PO4                              S4.1 Footpath and kerb                Complies
                                 crossings are located clear of
Vehicular access does not        existing stormwater inlet             There are no water main
adversely impact on the          structures, water and                 valves and hydrants, sewer
capacity, operations and         sewerage infrastructure               manholes or stormwater pits
maintenance of the existing      fittings, any other exiting utility   in the site frontage where
infrastructure; AND              infrastructure, existing              driveways are proposed to be
                                 landscaping and vegetation.           located.

PO5                              S5.1 Vehicular access avoids          Complies
                                 disturbance to the tree
Vehicular access does not        protection zone of trees on           There are no street trees to
adversely impact on the health   public land.                          the site frontage that would be
and integrity of existing                                              affected by the proposed
landscaping or native                                                  driveway locations
vegetation, where possible.

PO6                              S6.1 For—                             Complies

Driveway run-off is filtered     a) Ancillary dwelling unit,           Driveways can be conditioned
prior to leaving the premises.   Multiple housing Type 2 if less       to have crossfall to the
                                 than 5 carparking spaces,             adjacent landscape areas
                                 Visitor accommodation Type 1          within the site to disconnect
                                 and Homebased business                the internal impervious areas
                                 Type 3—the driveway is                from the downstream
                                 formed to drain to landscaped         drainage infrastructure.
                                 areas; and

                                 b) for other uses—grease and
                                 oil arrestors or stormwater
                                 quality improvement devices
                                 are incorporated into the
                                 design to treat run-off prior to
                                 run-off exiting from the
                                 premises.

PO7                              S7.1 The number of parking            Complies
                                 and loading bays is not less
Sufficient carparking is         than the minimum number
provided to accommodate the      specified in Table 14-51
number and type of vehicles                                            Each site has two resident
                                 Vehicle Parking
likely to be generated by the                                          parks in the garage and one
                                 Requirements;
development having regard to                                           visitor space in the driveway
the specifics of the use                                               within the site boundaries
including—

a) the type and intensity of
land use;

b) any existing parking
available on the site;

c) hours of operation;

Page 15

Performance Outcomes                 Acceptable Outcomes               response

d) likely numbers of users;

e) the peak parking demand
periods of uses on the site;
and

f) the availability of alternative
carparking.

PO8                                  S8.1 Parking bays,                The on site parking and
                                     manoeuvring areas, queuing        manoeuvring areas are
The layout of the development        areas, loading, setdown and       sufficient for the proposed
provides adequate, clearly           pickup areas and driveways        development scale.
defined and easily                   are designed to the standards
accessible—                          set out in the Australian
                                     Standards for Off-street
a) on-site vehicle parking and
                                     Carparking and Off-street
manoeuvring areas; and
                                     Commercial Vehicles Parking.
b) loading and manoeuvring           AND
areas for delivery and service
                                     S8.2 The number of loading
vehicles.
                                     bays is not less than the
                                     minimum number specified in
                                     Table 14-51.

PO9                                  S9.1 Carparking areas are         Complies,
                                     accessed from rear laneways
Parking areas are located            where practicable.                Parking areas are located
where they will not unduly                                             within the development
conflict with pedestrians and                                          boundaries
will not dominate the
streetscape.

PO10                                 S10.1 Carparking spaces are       Not Applicable. Development
                                     provided for people with          does not trigger requirement
Provision is made for a              disabilities at the rate          for off-street PWD parking
reasonable number of on site         specified in the Australian       facility
carparking spaces identified         Standards for Off-street
and reserved for people with         Carparking
disabilities.

PO11                                 S11.1 Vehicle manoeuvring         Complies with PO11
                                     areas are provided in
Access and egress points do          accordance with Australian        Vehicle crossovers are
not impact on the safety and         Standards for Off-street          positioned on street frontage
operations of the road system.       Carparking so vehicles enter      consistent with adjacent
                                     and leave the site in a forward   dwellings. Due to the scale of
                                     gear.                             the development and low level
                                                                       of Margit Street in the regional
                                                                       road hierarchy, it is expected
                                                                       that vehicles are able to use a
                                                                       reverse manoeuvre when
                                                                       entering or existing the site.

PO12                                 S12.1 At locations where          Not Applicable. No formal
                                     pedestrian and vehicle            footpath to the development

Page 16

 Performance Outcomes               Acceptable Outcomes               response

 Parking areas are designed to      conflicts are likely to occur –   side of the road. Street
 - a) provide a progressive                                           setbacks enable the required
 reduction in speed between         a) sight distances of at least    site distances regardless
 the external road and internal     2.5 seconds of travel time at
 parking spaces;                    the designated speed are
                                    provided;
 b) ensure lower speeds near
 areas of high pedestrian           b) splayed corners on
 activity through the use of        structures are incorporated;
 appropriate road geometry or
                                    c) landscaping is designed to
 devices designed to limit
                                    allow clear views; and
 speed; and
                                    d) sign placement ensures
 c) maintain sight distances
                                    that sight distance
 which are appropriate for the
                                    requirements are not
 likely operating speeds in all
                                    impeded.
 areas of potential
 pedestrian/vehicle and
 vehicle/vehicle conflict.

PO13                                S13.1 In large open car parks     Not Applicable
                                    with greater than 200 car
 A clearly defined pedestrian
                                    parking spaces, a pedestrian
 network is provided that –
                                    path between parking spaces
 a) is located in areas where       is provided on every second
 people will choose to walk;        aisle.

 b) ensures that pedestrian
 movement through car parking
 areas or structures are along
 aisles rather than across
 them.

PO14                               S14.1 No probable solution         Not Applicable
                                   identified;
Provision is made for
pedestrian and vehicular
queues at conflict points.
PO15                               S15.1 Lighting is provided in      Not Applicable
                                   accordance with the Australian
Parking areas are lit to provide   Standard for Road Lighting -
security for night-time users.     Vehicular Traffic (Category V)
                                   Lighting - Performance
                                   Installation and Design
                                   Requirements
PO15                               S16.1 Resident carparking is       Not Applicable
                                   limited to one space per
In mixed use areas of Business     dwelling unit or accommodation
centres residents do not           unit;
compete with customers for         AND
carparking spaces.
                                   S16.2 Resident carparking is
                                   not located in the road reserve
                                   or between the residential or
                                   business building and the
                                   principal street frontage.
PO16                               No solution provided               Not Applicable

Page 17

 Performance Outcomes                 Acceptable Outcomes   response

Car parking areas are
landscaped to—
a) provide shade;
b) maximise infiltration of
stormwater run-off;
c) define parking areas;
d) reduce direct visibility of car
parking areas from external
viewpoints; and
e) soften views of hardstand
areas.
PO17                                 No solution provided   Not Applicable

Development with the potential
to generate significant traffic
and parking impacts gives
appropriate consideration to
transport and land use
issues27 .

Page 18

5.0 OTHER CODE REVIEWS

Transport, Roads, and Drainage Code

This development proposes two low density scale residences to an existing neighbourhood access
street. The access locations and type are to be consistent with Council’s standard driveway crossover
drawings IPWEAQ RS-049 and IPWEAQ RS-050. This is consistent with other properties surrounding
the development site.


Drainage will consist of discharge to the kerb and channel in Margit Crescent via kerb adaptor in the
same manner as the existing use of the site. The development is of similar size and site coverage to
the allowable design case for the land zoning so there will be sufficient capacity in the downstream
stormwater network to accept the post development stormwater discharge from the subject site.


Waste Management Code

This development proposes to include a general waste and co-mingled recyclables bin for each
dwelling consistent with the requirements for a dwelling house in the planning scheme. These are to
be 240L bins for each use and managed via kerbside collection, consistent with other dwelling on
Margit Crescent


Water Sensitive Design Code

The development scale is less than 2,500m2 as prescribed in the Qld SPP (2017) Appendix 2 Table
B, which is the trigger for a stormwater quality treatment train specifically modelled to manage the
post development water quality objectives for new developments in SEQ. The subject site is 635m2.
The subject site mitigates pollutant and runoff of suspended solids by compliance with the driveways
and car parking code in that internal paved driveway areas are to be sloped towards vegetated
garden beds to drain sediment and particulate bound nutrients into softscape areas and disconnect
them form the downstream drainage infrastructure in the street.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.