G - Engineering Code Assessment
Sediment Control (BPESC)
2008; and
d) temporary or permanent
downpipes are connected to the
stormwater system before
laying the roof; or
e) localised erosion is avoided
by directing flow from
downpipes over non-erosive
areas
PO2 S2.1 Work within waterways Not Applicable
must be undertaken in
Construction activities within accordance with Best Practice
watercourses are planned to Erosion and Sediment Control,
prevent erosion, construction Appendix I – Instream works,
failure and associated Sections 14 and 16
sedimentation. International Erosion Control
Association 2008.
S2.2 Temporary vehicular
crossings of waterways must be
designed and constructed to
convey flows for the 50%AEP
event and remain stable for all
rainfall events up to 10%AEP
event.