Original source · versioned page text
G - Engineering Code Assessment
Performance Outcomes Acceptable Outcomes response
overland flow paths and located in private property; decided and issued by
associated structures. AND Unitywater
S2.2 The width of the
easement is the greater of 3m
or the width of the zone of
influence; AND
S2.3 The easement is centred
over the centreline of the
infrastructure
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.