Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2020-10-12 General Committee Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 12 October 2020

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2020-10-12 General Committee Agenda(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 83 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                       12 OCTOBER 2020


TABLE OF CONTENTS

ITEM                                                                                  PAGE

1      ATTENDANCE & APOLOGIES                                                            3

2      PRESENTATIONS                                                                     3

3      DEPUTATIONS                                                                       3

4      ITEMS REFERRED FROM COMMITTEES                                                    3

       1   MCU20/0027 & RAL20/0004 MATERIAL CHANGE OF USE COMMERCIAL
           BUSINESS TYPE 2 MEDICAL INVOLVING BUILDING WORK ASSOCIATED
           WITH RELOCATION OF A BUILDING IN A HERITAGE CHARACTER AREA &
           RECONFIGURING A LOT (4 LOTS INTO 2) AT 45 & 47A MAPLE ST & 9
           MYALL ST COOROY                                                               3

       2   2020-21 COMMUNITY GRANT PROGRAM FUNDING - COMMUNITY
           PROJECT GRANT - EQUIPMENT                                                     3

       3   GO NOOSA PEAK PERIOD TRAFFIC MANAGEMENT 2020-21                               3

       4   PARK ROAD TEMPORARY PATHWAY UPGRADE                                           3

5      REPORTS DIRECT TO GENERAL COMMITTEE                                               4

       5   1920T149 MOWING AND WEED CONTROL SERVICES – TENDER
           ACCEPTANCE                                                                    4

       6   51901.3614.01, 51901.3786.02, 51992.479.01, 51994.1249.01, 51994.1048.01
           & MCU13/0081.01 – MINOR CHANGE TO MULTIPLE DEVELOPMENT
           APPROVALS FOR 47 MULTIPLE DWELLINGS, ENTERTAINMENT & DINING
           - TYPE 1 FOOD & BEVERAGE AND RETAIL BUSINESS - TYPE 1 LOCAL
           AND TYPE 2 SHOP & SALON – 71 HASTINGS STREET, NOOSA HEADS                     8

       7   OUTCOMES OF COMMUNITY BUDGET CONSULTATION                                    44

       8   FINANCIAL PERFORMANCE REPORT – SEPTEMBER 2020                                64

       9   UPDATE ON SUNSHINE COAST AIRPORT FLIGHT PATH ISSUES                          77

6      CLOSED SESSION                                                             84




                                                                             Page 2 of 84

Section 3

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


1   ATTENDANCE & APOLOGIES




2   PRESENTATIONS

    Nil.


3   DEPUTATIONS

    Nil.


4   ITEMS REFERRED FROM COMMITTEES

    PLANNING & ENVIRONMENT COMMITTEE

    1      MCU20/0027 & RAL20/0004 MATERIAL CHANGE OF USE COMMERCIAL
           BUSINESS TYPE 2 MEDICAL INVOLVING BUILDING WORK ASSOCIATED WITH
           RELOCATION OF A BUILDING IN A HERITAGE CHARACTER AREA &
           RECONFIGURING A LOT (4 LOTS INTO 2) AT 45 & 47A MAPLE ST & 9 MYALL ST
           COOROY
           (Planning & Environment Committee Agenda, 6 October 2020, Item 2, Page 11)
           Reason for referral – Significance of the issue

    SERVICES & ORGANISATION COMMITTEE

    2      2020-21 COMMUNITY GRANT PROGRAM FUNDING - COMMUNITY PROJECT
           GRANT - EQUIPMENT
           Services & Organisation Committee Agenda, 6 October 2020, Item 5, Page 13)
           Reason for referral – No meeting quorum at S&O Committee due to conflict of
           interest declarations


    3      GO NOOSA PEAK PERIOD TRAFFIC MANAGEMENT 2020-21
           Services & Organisation Committee Agenda, 6 October 2020, Item 6, Page 16)
           Reason for referral – Significance of the issue


    4      PARK ROAD TEMPORARY PATHWAY UPGRADE
           Services & Organisation Committee Agenda, 6 October 2020, Item 7, Page 26)
           Reason for referral – Significance of the issue




                                                                                        Page 3 of 84

Section 4

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020


5   REPORTS DIRECT TO GENERAL COMMITTEE


    5    1920T149 MOWING AND WEED CONTROL SERVICES – TENDER ACCEPTANCE

    Author            Civil Operations Manager, Allan Hull
                      Infrastructure Services Department

    Index             ECM/ Project and Contract/ 1920T149

    Attachments       1.    1920T149 Evaluation Matrix – Separable Portions A & B


    EXECUTIVE SUMMARY
    Not applicable.

    RECOMMENDATION
    That Council note the report by the Civil Operations Manager to the General Committee
    Meeting dated 12 October 2020 and:
    A.   Award tender 1920T149 Separable Portion A Mowing Services to APG Group Pty
         Ltd;
    B.   Award tender 1920T149 Separable Portion B Weed Control Services to Nature Zone
         Landscaping & Property Maintenance Pty Ltd; and
    C.   Award the contracts for an initial term of two (2) years, with an option to extend for
         three (3) terms of up to twelve (12) months each. The options to extend will be at
         Council’s own discretion and subject to the contractor’s ability to meet the
         requirements under the contract.

    REPORT
    This report considers the provision of mowing and weed control services managed by the
    Parks & Gardens team. Contractors are used to perform all mowing on public land within the
    Noosa Shire, as well as weed control adjacent to major roads. The tender was split into two
    separable portions as follows:
        Separable Portion A - Mowing Services
        Separable Portion B - Weed Control Services
    These are lump sum contracts for an initial period of two (2) years. There will be the option
    extend for a further three (3) terms of up to twelve (12) months at Council’s discretion.
    Council received ten (10) conforming tender submissions. After evaluation, it is
    recommended that the contracts be awarded to:
        Separable Portion A – Mowing Services – APG Group Pty Ltd
        Separable Portion B – Weed Control Services – Nature Zone Landscaping & Property
         Maintenance Pty Ltd.

    1.   Tender Process
    The invitation of public tenders for 1920T149 Mowing and Weed Control Services was issued
    through VendorPanel Public Tenders on Thursday 23 July 2020 and advertised in both
    Noosa Today and online with NewsCorp Australia (Noosa News) on Thursday 23 July 2020.
    At tender close on Tuesday 18 August 2020, submissions were received from the following
    ten (10) conforming respondents listed in alphabetical order:

                                                                                   Page 4 of 84

Section 5

GENERAL COMMITTEE MEETING AGENDA                                           12 OCTOBER 2020


   1.    Amaroo Landscape Group Pty Ltd
   2.    APG Group Pty Ltd
   3.    Austspray Environmental Weed Control Pty Ltd
   4.    GLG Greenlife Group Pty Ltd
   5.    Mathiou Services Pty Ltd
   6.    Nature Zone Landscaping & Property Maintenance Pty Ltd
   7.    Palmwoods Revegetation
   8.    Prime Group Australia Pty Ltd
   9.    Southern Cross Facilities Services Pty Ltd
   10.   The Maintenance Company Pty Ltd

   These tenders were assessed and rated by members of the evaluation panel in accordance
   with the following procurement probity plan evaluation criteria:
        Capability & Resourcing
        Contract Experience & Capacity
        Methodology
        Health & Safety
        Contribution to Local Economy
        Price

   The evaluation methodology considered non-price elements (60% of the score) and a price
   component (40% of the score).
   For the non-price elements, APG Group Pty Ltd and Nature Zone Landscaping & Property
   Maintenance Pty Ltd received the highest scores respectively for each separable portion.
   Both companies are owned and operated in the Noosa Shire and contribute to the local
   economy and employment.
   For the price component, APG Group Pty Ltd and Nature Zone Landscaping & Property
   Maintenance Pty Ltd received the third highest scores respectively for each separable
   portion. However both pricing submissions were within the allocated 20-21 budgets for both
   mowing and weed control.
   In the overall evaluation, APG Group Pty Ltd and Nature Zone Landscaping & Property
   Maintenance Pty Ltd submissions scored highest for each separable portion due to their
   detailed and comprehensive responses to all the criteria and their competitive pricing. They
   are therefore recommended as the preferred contractors for each separable portion of
   1920T149 Mowing and Weed Control Services.

   Finance
   Following the finalisation of the evaluation, Council requested a Best and Final Offer (BAFO)
   from APG Group Pty Ltd for Separable Portion A. The BAFO process provided clear
   guidance including that the tenderer was not to change any aspect of their offer other than
   price. Subsequently APG Group Pty Ltd responded with a 2.5% price reduction which
   amounts to approximately $30,219 per annum. This BAFO request was undertaken due to it
   having no material impact on the outcome of the tender and did not involve any change to
   the specification which would oblige Council to provide the same opportunity to other
   tenderers.
   The Separable Portion B Weed Control Services replaces a previous contract for landscape
   maintenance of the major road areas. An assessment was made that horticultural activities
   such as pruning would be more effectively undertaken on an as-needs basis with contractors
   sourced for Council’s Landscaping Services panel. It is anticipated that this more targeted
   approach to the landscape maintenance will result in an overall saving of $40,000.




                                                                                  Page 5 of 84

Section 6

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


   Risks & Opportunities
   Both recommended contractors are incumbents with excellent track records of performance
   and safety in delivering the required services at the sites within the contract areas. Their
   existing knowledge of the contract sites and specific requirements presents minimal risk to
   Council for services in high profile areas which quickly attract complaints if not performed to
   high standards.
   There is an element of risk with having one supplier undertaking the entire mowing program,
   if they encounter financial strain which may happen if any portion of the program gets
   adjusted due to dry weather etc. Following evaluation, an independent ‘risk of failure’
   evaluation was undertaken on APG Group Pty Ltd through a third party (Illion Australia Pty
   Ltd). This evaluation concluded that APG Group Pty Ltd has a very low risk of failure in the
   next twelve months.
   In relation to Separable Portion B, Nature Zone Landscaping & Property Maintenance Pty
   Ltd have offered to undertake the weed control services at night, which is an approach they
   have previously undertaken. Undertaking these works at night is highly advantageous,
   minimising traffic congestion and complaints on these major roads as works will not occur
   during the busy daytime hours.

   Consultation
   External Consultation - Community & Stakeholder
   Nil.

   Internal Consultation
   Departments/Sections Consulted:

          Chief Executive Officer   Community Services                    X   Corporate Services
          Executive Officer         Director                                  Director
          Executive Support         Community Development                 X   Financial Services
                                    Community Facilities                      ICT
                                    Libraries & Galleries                 X   Procurement & Fleet
                                    Local Laws                                Property
                                    Waste & Environmental Health              Revenue Services

          Executive Services        Environment&Sustainable Development   X   Infrastructure Services
          Director                  Director                              X   Director
          Community Engagement      Building & Plumbing Services              Asset Management
          Customer Service          Development Assessment                    Buildings and Facilities
          Governance                Economic Development                  X   Civil Operations
          People and Culture        Environmental Services                    Disaster Management
                                    Strategic Land Use Planning               Infrastructure      Planning,
                                                                              Design and Delivery




                                                                                     Page 6 of 84

Section 7

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 7 of 84

GENERAL COMMITTEE MEETING AGENDA                                           12 OCTOBER 2020

                                                                                                                           ATTACHMENT 1
                           NOOSA SHIRE COUNCIL __ Weighted Attribute Evaluation Spreadsheet - Final Evaluation
                        a
                        a
                         INAME OF TENDERER               PRICE *
                          (Conforming Tenders Only)     {excl of GST)        SEPARABLE PORTION 1
                         2 Southers Cros: Faves Services Pry Ua az Sovtnern Cross | 352.605 MOWING SERVICES
                         2
                         3 [APGGroupPryled OO              S5,213,664
                         4                                                       * Price = Total Annual Cost
                         5
                         ze
                         7
                          PT
                         3 a
                        tT
                          NON-CONFORMING TENDERS

                                                           1         2         3         4        5         6        7
                                        _             GL6 Greenlife Group Southern Cross The Maintenance Prime Group Amaroo Landscape | Mathiou Service Pty
                           ae                        ff                 ff
                         fspabiny securing |    tmx |v | ro | os | exe | oes [ces | so | soo | so | so | oo | 2m | se | 500 |
                         fomctoncsemy      |    sm  | © | os | es|an|os[uo| = [us| s [es |» ||» |                       |
                         petty             |    me        | re |   | om | es | om | mo | sm | ms | ro | es | sm | 3 | 52 |
                         pemsestey          | mm | le | me i | ew | i | ew] os | ow | @ | om | as | oe |
                                 ns = | = | = | = | = | ae] sas! = |e] = || = |                                          |
                          See = | es Pie                                                         ee       es     le

                                                       OLG Greenla o southe: SS        Voi         5      o landsco Mathio ct
                            Fees (Pe)           40%      $900,054 $921,605   $1,213,664 $1,523,572 $2,379,825 $2,422,268 $7,351,522
                          Average Fees (Pav) $..._._.......-.- $2,387,501
                         Price Sere               Pe                me               ee Te
                           ormaced rie Score (Po      |    Te Teme |                                fw Ts
                          Weighted Price Score (Pw)

                           The Contract Administrator confirms the above scores and

                                                                                 Page 7 of 84

Section 8

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020



   6       51901.3614.01, 51901.3786.02, 51992.479.01, 51994.1249.01, 51994.1048.01 &
           MCU13/0081.01 – MINOR CHANGE TO MULTIPLE DEVELOPMENT APPROVALS
           FOR 47 MULTIPLE DWELLINGS, ENTERTAINMENT & DINING - TYPE 1 FOOD &
           BEVERAGE AND RETAIL BUSINESS - TYPE 1 LOCAL AND TYPE 2 SHOP &
           SALON – 71 HASTINGS STREET, NOOSA HEADS
   Author              Development Planner, Tara Norley
                       Environment and Sustainable Development Department

   Index               ECM / Application / 51901.3614.01
                            ECM / Application / 51901.3786.02
                            ECM / Application / 51992.479.01
                            ECM / Application / 51994.1249.01
                            ECM / Application / 51994.1048.01
                            ECM / Application / MCU13/0081.01

   Attachments         1.   Proposal Plans (provided separately to this agenda)
                       2.   Infrastructure Agreement (provided separately to this agenda)


    APPLICATION DETAILS

    Application No.             51901.3614.01, 51901.3786.02, 51992.479.01, 51994.1249.01,
                                51994.1048.01 & MCU13/0081.01

    Development Approval        47 Multiple dwellings, Entertainment & Dining - Type 1 Food &
                                Beverage and Retail Business - Type 1 Local and Type 2 Shop &
                                Salon
    Applicant                   Body Corporate for Netanya Noosa CTS 17658

    Request Received On         3 June 2020

    PROPERTY DETAILS

    Property Address            Netanya
                                71 Hastings Street, Noosa Heads Qld 4567
    RP Description              Lots 0-55 on BUP101500, Lot 7 and Lot 57 on SP266734, and Lot
                                56 on SP178320

    Land Area                   3,498m2
    Existing Use of Land        Mixed use - including retail and entertainment and dining on the
                                ground floor and 47 residential / visitor accommodation dwellings on
                                the upper levels.

    STATUTORY DETAILS

    SEQRP Designation           Urban Footprint

    Locality                    Noosa Heads

    Zone                        Visitor Mixed Use

    Overlays                    Natural Hazards (Acid Sulfate Soils, Flood Hazard)

    Assessment Type             Minor Change to Development Approval




                                                                                       Page 8 of 84

Section 9

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020


   RECOMMENDATION
   That Council note the report by the Development Planner to the General Committee Meeting
   dated 12 October 2020 regarding Application No. 51901.3614.01, 51901.3786.02,
   51992.479.01, 51994.1249.01, 51994.1048.01 & MCU13/0081.01 to make a minor change
   to existing approvals for a mixed use development commonly known as Netanya and situated
   at 71 Hastings Street, Noosa Heads and:
   A.   Approve the change.
   B.   Include the following additional conditions on 51901.3614.01, 51901.3786.02,
        51992.479.01, 51994.1249.01, 51994.1048.01 and MCU13/0081.01:
        Additional conditions – 15 October 2020
        Approved Plans
        1.    Development authorised by this approval must be undertaken generally in
              accordance with the Approved Plans. The approved plans are listed in the
              following table and may be amended by these conditions and annotations on the
              plans.
         Plan No.   Rev   Plan Name – Prepared by                                    Date
         19021      E     Cover Sheet, prepared by Sprout Architects                 5/08/2020
         SD00.00
         19021      E     Locality & Register, prepared by Sprout Architects         5/08/2020
         SD00.01
         19021      E     New Works - First Floor Site Plan, prepared by Sprout      5/08/2020
         SD10.01          Architects

         19021      E     New Works - Second Floor Site Plan, prepared by Sprout     5/08/2020
         SD10.02          Architects
         19021      E     New Works - Third Floor Site Plan, prepared by Sprout      5/08/2020
         SD10.03          Architects
         19021      E     New Works – Fourth Floor Site Plan, prepared by Sprout     5/08/2020
         SD10.04          Architects
         19021      I     New Works – Ground Floor, prepared by Sprout               6/10/2020
         SD20.00          Architects
         19021      E     New Works – First Floor, prepared by Sprout Architects     5/08/2020
         SD20.01
         19021      E     New Works – Second Floor, prepared by Sprout               5/08/2020
         SD20.02          Architects
         19021      E     New Works – Third Floor, prepared by Sprout Architects     5/08/2020
         SD20.03
         19021      E     New Works – Roof Terrace, prepared by Sprout Architects    5/08/2020
         SD20.04          As annotated by Council
         19021      E     New Works – Elevations, prepared by Sprout Architects      5/08/2020
         SD30.00
         19021      E     New Works – Elevations, prepared by Sprout Architects      5/08/2020
         SD30.01
         19021      E     New Works – Sections, prepared by Sprout Architects        5/08/2020
         SD30.02
         19021      D     New Works – Section, prepared by Sprout Architects         5/08/2020
         SD30.03
         19021      E     Detailed Area – South-west Tenancies / Refuse Area,        5/08/2020
                          prepared by Sprout Architects

                                                                                    Page 9 of 84

Section 10

GENERAL COMMITTEE MEETING AGENDA                                                12 OCTOBER 2020


        Plan No.    Rev   Plan Name – Prepared by                                       Date
        SD60.00
        19021       E     Detailed Area – Forecourt / Café, prepared by Sprout          5/08/2020
        SD60.01           Architects
        19021       E     Detailed Area – Forecourt / Café, prepared by Sprout          5/08/2020
        SD60.02           Architects
        19021       E     Detailed Area – Covered Seat / Unit Awning, prepared by       5/08/2020
        SD60.03           Sprout Architects
        19021       E     Detailed Area – Pool Terrace / Rear Entry, prepared by        5/08/2020
        SD60.04           Sprout Architects
        19021       E     Detailed Area – Pool Terrace / Rear Entry, prepared by        5/08/2020
        SD60.05           Sprout Architects
        19021       E     Detailed Area – Roof Terrace / Feature Awning, prepared       5/08/2020
        SD60.06           by Sprout Architects
                          As annotated by Council
        19021       E     Detailed Area – Stair / Lift Extensions, prepared by Sprout   5/08/2020
        SD60.07           Architects
        19021       E     Detailed Area – ‘Sails’ Entry / Park Road Frontage,           5/08/2020
        SD60.08           prepared by Sprout Architects
        19021       E     Detailed Area – ‘Sails’ Entry / Park Road Frontage,           5/08/2020
        SD60.09           prepared by Sprout Architects
        19021       E     Landscaping Areas – Existing Conditions, prepared by          5/08/2020
        SD80.00           Sprout Architects
        19021       E     Landscaping Areas – New Works, prepared by Sprout             5/08/2020
        SD80.01           Architects
        19021       E     Site Cover – Existing Conditions / New Works, prepared        5/08/2020
        SD80.02           by Sprout Architects
        19021       E     GFA Areas – Existing Conditions / New Works, prepared         5/08/2020
        SD80.03           by Sprout Architects

       Performance Bond
       2.   Security in the form of a cash bond or trading bank guarantee to the sum of
            $25,000 must be submitted to Council, to secure performance of all conditions of
            this approval, prior to the issue of a Development Permit for Building Works. The
            cash bond or trading bank guarantee will be returned on performance of the
            conditions of approval less any costs incurred by Council in respect of enforcing
            performance of this permit. Council reserves the right to call upon the bond or
            guaranteed sum to effect compliance with conditions.
       Nature and Extent of Approved Use
       3.   The roofed outdoor dining area associated with Lot 7 (The Providore) must
            remain unenclosed and is limited to a maximum of 56m2 use area.
       4.   No structures are approved or permitted within The Parade, on public land.
       Roof Terrace Pergolas
       5.   Pergolas on the roof terraces must be:
            a.     setback a minimum of 6m from the northern roof terrace edge /
                   balustrading;
            b.     a maximum of 9m2 in area; and
            c.     a maximum of 2.7m in height.

                                                                                    Page 10 of 84

Section 11

GENERAL COMMITTEE MEETING AGENDA                                           12 OCTOBER 2020


       Landscaping
       6.    The development site must be landscaped. The works must be undertaken in
             accordance with an Operational Works approval and the Noosa Plan for that
             specific area and must include in particular:
             a.    a minimum of one of the existing palm trees located on the western side of
                   the driveway is to be retained;
             b.    existing established trees located in the landscaped planter in the south
                   western corner of the site (in front of the Bellissima Boutique) must be
                   retained;
             c.    provision of one additional established tree, behind the curved timber seat
                   within the landscaped planter in the south western corner of the site (in
                   front of the Bellissima Boutique). Species is to be in accordance with the
                   Local Planning Scheme Policy Landscaping Plants & Guidelines, l;
             d.    paving proposed in the existing forecourt in the south east of the site must
                   blend with the existing surrounding surface finishes;
             e.    planting proposed on the timber trellis on the north eastern boundary is to
                   be in accordance with the Local Planning Scheme Policy.
       7.    Existing vegetation in the road reserve must be retained, unless written
             authorisation from Council is granted for the clearing.
       8.    Trees to be retained must be protected from clearing or construction activities by:
             a.    clearly marking vegetation to be retained with flagging tape
             b.    installing protective fencing around the drip line of the vegetation
             c.    restricting stockpiling, storage and vehicle parking to those areas which are
                   already cleared
             d.    using low impact construction techniques around vegetation.
       9.    All landscape works must be established and maintained in accordance with the
             approved design for the life of the development, and in a manner that ensures
             healthy, sustained and vigorous plant growth. All plant material must be allowed
             to grow to full form and be refurbished when its life expectancy is reached.
       10.   All landscape works must be maintained generally in accordance with the
             approved design for the life of the development.
       Damage to infrastructure
       11.   Any damage to footpaths, street plantings, natural vegetation/trees kerb and
             channel, bridges or roadways must be repaired or reinstated to at least pre-
             existing conditions.
       12.   Where damage occurs to any Council asset as a result of the landscaping works,
             the damage must be repaired immediately where it creates a hazard that
             presents risk to person or property. Non-hazardous damage must be repaired
             prior to completion of works.
       Car Parking
       13.   The applicant must comply with the requirements of any Infrastructure
             Agreement entered into with the Council with respect to the payment of car
             parking contributions in relation to the proposed development. In the event that
             the Infrastructure Agreement does not apply a minimum of 42car parking space
             must be provided and marked on the site and made available and accessible at
             all times while the use is open for business.


                                                                                  Page 11 of 84

Section 12

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020


        14.   A minimum of 39 car parking spaces must be provided on the site in accordance
              with approved plans; made available and accessible at all times while the use is
              open for business.
        15.   Onsite carparking must comply with AS/NZS2890.1:2004 Parking Facilities- Part
              1: Off-street car parking.
        16.   All car parking areas and access driveway must be maintained exclusively for
              vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
        17.   A certification by a suitably qualified person for the upgraded car parking area is
              required upon the completion of works and prior to issuing the Certificate of
              Classification to confirm compliance with the conditions of this permit.
   C.   Include the following Advisory Note on 51901.3614.01, 51901.3786.02, 51992.479.01,
        51994.1249.01, 51994.1048.01 and MCU13/0081.01:
        Infrastructure Charges
        1.    All developments and/or changes to existing developments may require payment
              of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
              Resolution” made pursuant to the planning legislation and regulations current at
              the time of issue.
        Advertising Devices
        2.    Any advertising devices proposed on the site must comply with the provisions of
              Council’s Advertising Devices Local Law.
   D.   Agree to enter into an Infrastructure Agreement with the applicant that provides for
        contributions in lieu of three on site car parking space.
   E.   Find the following matters relevant to the assessment and sufficient reason to approve
        the application:
        1.    The proposal complies with the Overall Outcomes of the Noosa Heads Locality
              Code as the development will provide for additional outdoor dining and amenities
              for entertainment and dining premises, providing interest for visitors and
              residents accommodated in the immediate area, and contributing to a vibrant
              pedestrian friendly streetscape;
        2.    The development is consistent with the bulk and scale of buildings within
              proximity to the subject site, presenting an improved, high quality built form and
              landscaping along both Hastings Street and The Parade.
   F.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
   G.   Note the application was lodged under the Noosa Plan 2006, which was superseded
        by the Noosa Plan 2020, which commenced on 31 July 2020. All references to the
        ‘Noosa Plan’ or ‘the planning scheme’ within the assessment report is in reference to
        the now superseded Noosa Plan 2006.
   H.   Advise the owner of Sails Restaurant that the structures within Beach Parade, on public
        land must be removed within 2 years of the date of this approval.


   REPORT
   1.   PROPOSAL
        The applicant is seeking to undertake a significant refurbishment of the existing
        Netanya development in order to refresh Netanya’s image and to rectify a number of
        the building compliance issues with respect to fire and evacuation codes, Disability
        Discrimination Act compliance and shade protection. The application is before Council
        due to the site’s prominent location and the requirement for an Infrastructure
                                                                                  Page 12 of 84

Section 13

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


        Agreement to be entered into to facilitate the payment of a contribution in lieu of a
        shortfall of three onsite car parking space.
        The application has been lodged under the Noosa Plan 2006 and seeks approval to
        change multiple existing development approvals, specifically:
   Ground Floor
       a new outdoor dining area for the Providore tenancy, totalling 56m2 of use area, and
        including a new roof structure over the outdoor dining area;
       a new awning over the Hastings Street and western side of the Bellissima tenancy,
        extending over the ‘service yard’ area on the western elevation of the building;
       a new roof over the foyer entry and car set down area adjoining the lobby;
       a new entry structure to the rear of the building, distinguishing the entry to the site from
        The Parade and Main Beach;
       new stairs and substation to the eastern side of the building / “Sails” entry and changes
        to the western façade;
       new shopfront and roof over 'Rumba Bar' as well as extension of Fire Stair 01;
       provision of one new onsite carpark located on the driveway.
   Level 1
       a new plunge pool to the west and new awning structure above the north facing (beach)
        side of Unit U205 terrace;
       new amenities and roof structure to the eastern side of the building / “Sails” entry and
        changes to the western façade;
   Level 3
       new cantilevered awnings above the north facing (beach side) balconies of Units U401
        to U416;
   Level 4 / Roof Terrace
       an extension of the existing fire exit stairs from Level 3 to Level 4 / Roof Terrace to
        meet fire and evacuation codes;
       an extension of the eastern lift from Level 3 to Level 4 / Roof Terrace to meet Disability
        Discrimination Act standards;
       new covered walkway links to the fire stairs on Level 4 / Roof Terrace;
       new pergolas located on Level 4 / Roof Terrace, including one on each of the roof
        terraces associated with Units U401 to U416.
   Whole development
   The proposal also includes ‘cosmetic’ changes to the entirety of the development, including:
       new render and paint finish to all external walls;
       new aluminium sliding doors to terraces / balconies;
       new aluminium windows;
       new frameless glass balustrade with aluminium uprights;
       updated landscaping (to be assessed through a separate Operational Works
        application); and
       new tiles to walkways, terraces and balconies.


                                                                                    Page 13 of 84

Section 14

GENERAL COMMITTEE MEETING AGENDA                   12 OCTOBER 2020




                            Figure 1: Locality




                          Figure 2: Subject Site




                                                       Page 14 of 84

Section 15

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020




               Figure 3: Hastings Street frontage (proposed and existing)




                                                                                Page 15 of 84

Section 16

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020




               Figure 4: Hastings Street frontage (proposed and existing)




                                                                                Page 16 of 84

Section 17

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020




               Figure 5: Hastings Street frontage (proposed and existing)




                                                                                Page 17 of 84

Section 18

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020




              Figure 6: The Parade (beach) frontage (proposed and existing)

                                                                                  Page 18 of 84

Section 19

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020




              Figure 7: The Parade (beach) frontage (proposed and existing)




                                                                                  Page 19 of 84

Section 20

GENERAL COMMITTEE MEETING AGENDA                                        12 OCTOBER 2020




                 Figure 8: Park Road frontage (proposed and existing)

                                                                            Page 20 of 84

Section 21

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020


   2.    BACKGROUND
   The subject site was originally two lots, with the western portion of the site developed first,
   with the two lots later amalgamated and the building extended across the eastern portion of
   the site to form the existing Netanya complex.
        In December 1979 development approval TPC1008 was issued for 29 Motel Units, 3
         Shops and 2 Restaurants (original approval for western portion of building);
        In August 1985 development approval TPC1737 for Multiple Dwelling 18 Units, 3
         Shops, Gymnasium and Meeting Room was approved under the 1985 Planning
         Scheme (original approval for eastern portion of building and amalgamation of the two
         lots);
        In October 1986 a change to development approval TPC1737 for Multiple Dwelling 18
         Units, 3 Shops, Gymnasium and Meeting Room was issued for a change to setbacks
         and the provision of pergolas on the roof top recreation areas
        In September 1987 a ‘substantially in accordance with existing approvals' for TPC1973
         was approved for an extension to the entry foyer;
        In February 1988 development approval TPC1994 for Changes of use affecting
         restaurant, shops and additional multiple dwelling unit and ancillary facilities was
         issued;
        In July 1993 development approval TPC2418 for an extension to an existing
         Restaurant (outdoor dining area) was issued (alterations to Sails Restaurant, including
         erection of a sail over the approved outdoor dining area);
        In May 1994 development approval TPC2639 for an extension to an existing
         Restaurant (outdoor dining area) was issued (refurbishment to the former Pavilions
         Restaurant);
        In May 1994 development approval TPC2678 for conversion of part of an existing
         restaurant into 3 shops was issued;
        On 6 October 1994 Building Unit Plan of Subdivision was approved creating separate
         titles for each unit within the building;
        In April 1995 development approval TPC2679 for an alterations to an existing
         restaurant and outdoor dining area was issued (alterations to Sails Restaurant);
        In June 1999 development approval 16987DA for modifications to extend and refurbish
         the existing reception area and to change the entry landscape treatment was issued;
        In October 2000 an amendment to development approval TPC1737 for the construction
         of a storage shed was issued;
        In February 2005 an amendment to development approval TPC1994 to convert a gym
         to a beauty salon was issued;
        In July 2013 development approval MCU13/0081 for a Material Change of Use for
         Entertainment & Dining Type 1 Food & Beverage & Retail Business Type 1 Local &
         Type 2 Shop & Salon was issued (Alterations to the existing ground floor Providore
         tenancy).

   3.    ASSESSMENT
   3.1. Statutory Process
         The applicant has requested to make a minor change to a development approval under
         s78 of the Planning Act 2016. An application for a minor change to a development
         approval can only be made in circumstances where a change would constitute a ‘minor
         change’.

                                                                                   Page 21 of 84

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                                      12 OCTOBER 2020


               The proposed change to the development approval requested by the applicant is
               determined to constitute a minor change on the grounds that:
              the development would not result in substantially different development as the
               proposed changes do not alter what the uses allowed under the original approval,
               whilst the built form changes are minor in terms of the overall scale and bulk of the
               existing development subject to the roof terrace pergolas being modified;
              the change does not include prohibited development;
              the change would not require the application to be referred to an additional referral
               agency or cause a referral agency to have regard to new matters prescribed by
               regulation;
              where the original application was code assessable, the change would not cause the
               application to become impact assessable.
       3.2. Instruments for Statutory Assessment
       Under the Planning Act 2016 the application must be assessed against each of the following
       statutory planning instruments to the extent they are relevant to the development:
              State Planning Policy;
              South East Queensland Regional Plan;
              Planning Regulation 2017;
              The Noosa Plan 2006.
       The following codes from the Noosa Plan 2006 are applicable to this development:
              Noosa Heads Locality Code;
              Business Uses Code;
              Residential Uses Code;
              Landscaping Code; and
              Engineering Works Codes.
       3.3. Statutory Instruments – Planning Scheme
       The proposed changes to Netanya raise a number of issues for consideration against the
       planning scheme, including setbacks, site cover, gross floor area, building height and roof
       form, and car parking. Each of these issues are addressed separately below.
       SETBACKS
       Probable Solution S8.1 of the Noosa Heads Locality Code requires buildings and other
            structures to be setback1:
       a)      2m, average of 4m from the front boundary to Hastings Street for the ground floor and
               2nd storey;
       b)      7m from the front boundary to Hastings Street above the 2nd storey; and
       c)      10m from the front boundary to The Parade (beach).




1setback means the minimum distance from any lot boundary to a building or structure, excluding eaves, roof overhangs and awnings
provided they encroach no more than 600mm into the setback distance.

                                                                                                             Page 22 of 84

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                  12 OCTOBER 2020


   Hasting Street Setback
   The proposal includes the following non-compliances with the setback requirements to the
   Hastings Street boundary:
       The proposed roofing of the outdoor dining area is setback 0.4m from the Hastings
        Street boundary, whilst the outdoor dining seating area under the roofing is setback
        1.7m from the boundary (refer to Figures 9 and 10).




        Figure 9: Outdoor dining (roof structure) within the Hastings Street boundary setback




                                                                                         Page 23 of 84

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                 12 OCTOBER 2020




       Figure 10: Outdoor dining (seating area) within the Hastings Street boundary setback



      Upgrades to the existing landscaped planters located on the Hastings Street boundary
       (refer to Figure 11).




                                                                                       Page 24 of 84

Section 25

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020




           Figure 11: Landscaped planters within the Hastings Street boundary setback

   The proposed setbacks to Hastings Street do not comply with Probable Solution S8.1 of
   the Noosa Heads Locality Code, and as such, are required to be assessed against Specific
   Outcome O8 of the Noosa Heads Locality Code.

                                                                                        Page 25 of 84

Section 26

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020


   Specific Outcome O8 of the Noosa Heads Locality Code requires that:
   Buildings and other structures are appropriately designed and sited to—
   a) provide amenity for users of the premises as well as preserve the visual and acoustic
      amenity of adjoining and nearby properties;
   b) provide adequate distance from adjoining land uses
   c) preserve any existing vegetation that will buffer the proposed building;
   d) allow for landscaping to be provided between buildings;
   e) maintain the visual continuity and pattern of buildings and landscape elements within the
      street;
   f) protect public safety and property within erosion prone areas by ensuring such areas are
      maintained largely free of development; and
   g) help protect the natural character and visual amenity of coastal areas and watercourses
   Whilst the proposal does not meet the minimum boundary setbacks to Hastings Street under
   Probable Solution S8.1, the development complies with Specific Outcome O8 and
   maintains the existing setback approved under TPC1008 (original approval for western
   portion of building).
   The new roofing over the Providore outdoor dining area improves the amenity of users of the
   dining area by providing weather protection, without detrimentally impacting on the visual
   and acoustic amenity of adjoining and nearby premises. In addition, the proposal includes
   changes to the on-site landscaping (to be assessed through a separate subsequent
   Operational Works application), including maintaining existing vegetation and providing
   improved planting within landscaped planters located on the Hastings Street boundary. The
   updated landscaping will preserve much of the existing vegetation on the site, with
   improvements to the landscaping ensuring visual continuity along Hastings Street in terms
   of landscape elements within the street.
   In addition, Overall Outcome m) of the Noosa Heads Locality Codes states:
   Hastings Street’s character of low rise buildings, vibrant pedestrian friendly streetscape, mix
   of indoor and outdoor activities, diverse dining opportunities, specialty Retail businesses and
   pedestrian links to Main Beach is maintained.
   As a result, Hastings Street has developed over the years as an area dominated by outdoor
   dining activities, with many sites located along Hastings Street offering outdoor dining located
   both within the front boundary setback and within the road reserve (approved through
   Outdoor Dining Permits issued by Council’s Property branch). Therefore the proposal to
   include outdoor dining within the front setback maintains the visual continuity and pattern of
   buildings within the street.
   It is also noted that an architectural Peer Review was carried out by NRA-CO-LAB (Noel
   Robinson) on behalf of Council. The Peer Review included the following comments:
        The alterations to the entry of the site have provided good street presence to the
         Providore tenancy.
        Site entry has been improved from the perspective of pedestrian experience.
   The Parade (beach) Setback
   The proposal includes the following non-compliances with the setback requirements to The
   Parade (beach) boundary and as such, are required to be assessed against Specific
   Outcome O8 of the Noosa Heads Locality Code:




                                                                                   Page 26 of 84

Section 27

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


        the proposed new entry structure to the rear of the building, distinguishing the entry to
         the site from The Parade and Main Beach, is to be setback 0.525m from The Parade
         boundary(refer to Figure 12);




               Figure 12: Landscaped planters within The Parade boundary setback


   the proposed new awning structure above the north facing (beach) side of the Unit U205
    terrace is to be setback 1.955m from The Parade boundary (refer to Figure 13);




                                                                                   Page 27 of 84

Section 28

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020




             Figure 13: Landscaped planters within The Parade boundary setback


      the proposed plunge pool to the west of Unit U205 terrace is to be setback 6.3m from
       The Parade boundary (refer to Figure 14).




                                                                                 Page 28 of 84

Section 29

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020




                   Figure 14: Plunge pool within The Parade boundary setback

   Specific Outcome O8 of the Noosa Heads Locality Code requires that:
   Buildings and other structures are appropriately designed and sited to—
   a)   provide amenity for users of the premises as well as preserve the visual and acoustic
        amenity of adjoining and nearby properties;
   b)   provide adequate distance from adjoining land uses
   c)   preserve any existing vegetation that will buffer the proposed building;
   d)   allow for landscaping to be provided between buildings;
   e)   maintain the visual continuity and pattern of buildings and landscape elements within
        the street;
   f)   protect public safety and property within erosion prone areas by ensuring such areas
        are maintained largely free of development; and
   g)   help protect the natural character and visual amenity of coastal areas and
        watercourses
   Whilst the proposal does not meet the minimum boundary setbacks to The Parade under
   Probable Solution S8.1, the development complies with Specific Outcome O8. The
   proposed new ‘rear entry structure’ is replacing an existing arbour with a lighter weight,
   modernised structure and is not increasing the existing encroachment into the setback, whilst
   the proposed plunge pool is located to the west of the existing building and will be screened
   from The Parade boundary by fencing and landscaping (to be assessed through a separate
   subsequent Operational Works application).
   It is noted that numerous developments fronting The Parade have structures including
   swimming pools, sunshades and stairways within the 10 metre setback, with several having
   structures adjacent to the boundary. In this instance, the modifications will maintain the
   existing setback for the ‘rear entry structure’, and the pattern of buildings and landscape
   elements within the location.
   The proposal includes a refurbishment of the entire development, revitalising the dated
   façade addressing The Parade and Main Beach, including the updated ‘rear entry structure’,
   and as such, the reduced setback is recommended to be supported.


                                                                                   Page 29 of 84

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                              12 OCTOBER 2020


       SITE COVER
       The 1985 approval for TPC1737 (approval for the eastern portion of the building and
       amalgamation of the two halves of the development) was assessed under the 1985 Town
       Plan, which allowed for a maximum of 45% site cover, whilst the draft Development Control
       Plan Scheme specific to the locality at the time had no specific limit for site cover. A provision
       in the 1985 scheme stated ‘not withstanding any of the provisions contained within this
       Division, the Council may dispense with or modify any or all of the requirements of clauses
       1 to 6 (including site cover) if it is considered that such dispensation or modification is
       necessitated having regard to
       1.     The unique size, shape, location or topography of the site or the adjoining area;
       2.     The existing development in the area;
       3.     The existing and proposed amenity of the area.
       It is unclear from Council’s records what the total site cover approved under TPC1737 is,
       however the total current site cover is 60.7%, and as such, site cover in excess of the
       provisions of the planning scheme were approved through multiple applications over the
       course of the development.
       Under the Noosa Plan2006, Noosa Heads Locality Code, Specific Outcome O10 states that
       site cover2 for the Visitor Mixed Use Zone does not exceed 45%. The minor change proposal
       would result in an increase in site cover from 60.7% to a total of 62.5% (refer to Figure 15).
       The areas of increased site cover relate to:
             the new roof over the outdoor dining area for the Providore tenancy;
             the new awning over the Bellissima tenancy and service yard;
             the new roof over the foyer entry and car set down area adjoining the lobby;
             new awning structure above the U205 terrace;
             new rear entry structure between the building and the beach;
             new roof over the ‘Rumba Bar’ tenancy; and
             new roof structure over the new stairs to the eastern side of the building / “Sails” entry.
       The proposed total site cover exceeds the allowable site cover under the Specific Outcome
       O10 of The Noosa Plan.




2site cover means the proportion of a site covered by all buildings and structures shown as a percentage. For enclosed

spaces this includes the area within the outside wall and for unenclosed spaces this includes the area measured along
a line 600mm in from the perimeter of the roof. Site cover includes garages and other roofed outbuildings, but does not
include landscape structures such as in-ground pools and decks.

                                                                                                     Page 30 of 84

Section 31

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020




                                 Figure 15: Site Cover additions


   Whilst the proposal exceeds the site cover provision of Specific Outcome 10, the proposed
   development meets Specific Outcome O9, which states:
   The site cover, gross floor area and plot ratio of buildings and other roofed structures –
   a) results in a building scale that is compatible with surrounding development;
   b) does not present an appearance of excessive bulk to adjacent properties, roads or other
       areas in the vicinity of the site;
   c) maximises the retention of existing vegetation and allows for soft landscaping between
       buildings;
   d) allows for adequate area at ground level for outdoor recreation, entertainment, clothes
       drying and other site facilities; and
   e) facilitates onsite stormwater management and vehicular access.
   The increase in site cover is largely at the ground level and is predominantly roofed,
   unenclosed additions, proposed to provide weather protection to pedestrian and visitors /
   patrons of Netanya. As such, the proposed changes to the development are minor in nature
   and result in a building scale that is compatible with surrounding development and do not
   present an appearance of bulk to adjacent properties or the beach. The proposed additions
   allow for adequate areas at ground level for outdoor recreation and entertainment, including
   increased amenity for patrons of the Providore.
   While exceedance of the site cover limit would not typically be recommended, the
   refurbishment of the Netanya development will result in a superior and updated built form
   outcome to what is currently existing and will result in greater comfort, activation and visual
   interest for pedestrians along Hastings Street, due to the increased weather protection and
   outdoor dining located along the frontage. In addition, the proposal maintains and enhances
   the existing area of landscaping. Therefore, the proposed site cover is acceptable and
   compatible in the context of the subject site, existing development, and historical
   development within Hastings Street.
   GROSS FLOOR AREA (GFA)
   The 1985 approval for TPC1737 (approval for the eastern portion of the building and
   amalgamation on the two halves of the development) was assessed under the 1985 Town
   Plan, which allowed for a maximum GFA of 4,757.28m2.


                                                                                  Page 31 of 84

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                                                 12 OCTOBER 2020


        Specific Outcome O13 of the Noosa Heads Locality Code requires that for the Visitor Mixed
        Use Zone the maximum a gross floor area3 is equivalent to the maximum allowable
        population in persons multiplied by 40m2, provided that gross floor area does not exceed a
        total of 13,600m2. This equates to a maximum GFA for the subject site of 3,917.76m2.
        The minor change proposal would result in a total GFA of 4,093.0m2, a total increase in GFA
        of 58.0m2, from an existing 4,035.0m2. The increase in GFA relates to:
                an additional 28.0m2 GFA to the ground level Providore tenancy for roofed outdoor
                 dining (refer to Figure 16);
                an additional 25.0m2 GFA to Level 1 via the addition of new amenities to be associated
                 with the existing Sails Restaurant tenancy (refer to Figure 17);
                an additional 5m2 (in total) to the refuse disposal areas over Level 1, Level 2 and Level
                 3 (refer to Figures 17 - 19).




                                         Figure 16: increase in GFA to the Ground level




                                               Figure 17: increase in GFA to Level 1


3
 gross floor area (or GFA) means the total floor area of a building measured from the outside of the external walls, plus for roofed unenclosed
areas, any portion of floor area beyond a distance of 3 metres from the external wall. It does not include:
a) the area of spaces used for the parking or manoeuvring of motor vehicles;
b) the area of lift shafts;
c) the area of stairwells on any level other than the ground floor; or
d) floor areas located in a basement.

                                                                                                                         Page 32 of 84

Section 33

GENERAL COMMITTEE MEETING AGENDA                                           12 OCTOBER 2020




                            Figure 18: increase in GFA to Level 2




                              Figure 19: increase in GFA to Level 3

   The proposed total GFA complies with the requirements of the 1985 Town Plan, however
   exceeds the allowable GFA under the provisions of The Noosa Plan 2006 by 175.24m2.
   Whilst the proposal exceeds the gross floor area provision of Specific Outcome 13, the
   proposed development meets Specific Outcome O9, which states:
   The site cover, gross floor area and plot ratio of buildings and other roofed structures –
   a)   results in a building scale that is compatible with surrounding development;
   b)   does not present an appearance of excessive bulk to adjacent properties, roads or
        other areas in the vicinity of the site;
   c)   maximises the retention of existing vegetation and allows for soft landscaping between
        buildings;
   d)   allows for adequate area at ground level for outdoor recreation, entertainment, clothes
        drying and other site facilities; and
   e)   facilitates onsite stormwater management and vehicular access.
   The 28.0m2 GFA increase to the ground level Providore tenancy is a roofed, unenclosed
   structure. As such, the roofed area will not present an appearance of bulk to adjacent
   properties or Hastings Street. The renovation of the Hastings Street elevation of the Netanya
   development will result in greater activation and visual interest from the perspective of the
   pedestrian experience along Hastings Street, with the architectural Peer Review carried out
   by NRA-CO-LAB (Noel Robinson) stating ‘the alterations to the entry of the site have
   provided good street presence to the Providore tenancy’. In addition, the proposal maintains
   and enhances the existing area of landscaping, whilst providing additional and improved
   landscaping within the subject site. Therefore, the proposed gross floor area is acceptable
   and compatible in the context of the subject site and historical development within Hastings
   Street.



                                                                                 Page 33 of 84

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                  12 OCTOBER 2020


   The increase in 25.0m2 GFA to Level 1 via the addition of new amenities for the Sails
   Restaurant tenancy. The new amenities are required in order for the development to comply
   with the Disability Discrimination Act, with the existing amenities poorly located and as such,
   the increase in GFA is recommended to be supported. The amenities are to be located on
   top of the existing substation and will be adequately screened from the Park Road street front
   (refer to Figures 20 - 21).




                                   Figure 20: Existing substation




       Figure 21: Proposed renovation and addition of amenities on top of existing substation


                                                                                        Page 34 of 84

Section 35

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020


   It is noted that an architectural Peer Review was carried out by NRA-CO-LAB (Noel
   Robinson) on the proposal plans. The Peer Review included a comment in regards to the
   Park Road elevation, that ‘the existing elevation is cluttered’ and ‘the proposal provides a lot
   of improvement’.
   The additional 5m2 (in total) to the refuse disposal areas over Level 1, Level 2 and Level 3
   are located internal to the building and will not be viewable from outside of the building, and
   as such do not add any additional bulk to the existing development.
   The proposed changes in GFA, equalling a 1.8% (58m2) increase, are minor in nature in the
   context of the overall development, and result in a building scale that remains compatible
   with surrounding development. The additional GFA does not result in the development
   presenting an appearance of excessive bulk to adjacent properties, roads or other areas in
   the vicinity of the site, with the Providore increase including an unenclosed roof area only,
   and the Park Road elevation resulting in an improvement on the existing design. In addition,
   the additional Providore GFA allows for additional areas for outdoor dining. As such, the
   additional GFA is recommended to be supported.
   HEIGHT AND ROOF FORM
   It is noted that the proposal complies with Probable Solution S7.1 of the Noosa Plan, Noosa
   Heads Locality Code in terms of building height in metres, however Specific Outcome O7
   of the Noosa Heads Locality Code states:
   Buildings and other structures—
   a)    present a building height consistent with structures on adjoining and surrounding land;
   b)    do not exceed a maximum building height of
         i)     For the Visitor Mixed Use Zone -
                A)    Northern side of Hastings Street -
                     within 7m of the Hastings St alignment – 2 storeys; or
                     balance area of site – 4 storeys with a 3 storey presentation to the
                      beach;
   c)    do not visually dominate the street or surrounding spaces;
   d)    preserve the amenity of surrounding land;
   e)    respect the scale of surrounding vegetation;
   f)    respond to the topography of the site by minimising cut and fill (eg. stepping down the
         site or using a suspended pole construction); and
   g)    maintain a mature vegetated skyline.
   The proposal includes a continuous line of pergolas across the entirety of the roof, with each
   pergola proposed to be 10m2 in size, 2.7m in height and setback 1m from the roof edge (refer
   to Figure 22).




                                                                                   Page 35 of 84

Section 36

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020




                     Figure 22: Pergolas proposed on existing roof terraces

   The proposal does not comply with Specific Outcome O7 of the Noosa Heads Locality Code
   as the proposal presents as 4 storeys to the beach, with the pergolas being visually dominate
   from The Parade, which is not consistent with roof terraces along the northern side of
   Hastings Street.
   Probable Solution S15.2 of the Noosa Heads Locality Code states buildings and structures
   do not include roof top terraces.
   Specific Outcome O15 of the Noosa Heads Locality Code states:
   Roof forms:
   a) contribute positively to the local skyline;
   b) complement the character of the locality;
   c) use soft and articulated, pitched, skillion or curved roof forms;
   d) avoid low pitched (eg. less than 5 degrees) or box profiles/parapets; and
   e) do not create opportunities for residents to overlook the private open space areas of
      neighbouring properties.
   The proposal does not comply with Specific Outcome O15 of the Noosa Heads Locality
   Code as while the building already includes roof terraces, the pergolas are not considered to
   contribute positively to the skyline, as they will create the appearance of four storeys and
   visually dominate from The Parade. The pergolas are further not consistent with other
   development along the northern side of Hastings Street and do not respect the character of
   the area.
   It is acknowledged that a number of developments along the northern side of Hastings Street
   include pergolas/roof structures on roof terraces that are viewable from The Parade,
   including 5, 23, 37 and 55 Hastings Street. These structures are much smaller in scale and
   are setback from the northern edge of the buildings, reducing their prominence and as such,
   do not dominate the skyline (refer to Figure 23).




                                                                                  Page 36 of 84

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                    12 OCTOBER 2020




              5 Hastings Street                                       55 Hastings Street




              23 Hastings Street                                      37 Hastings Street
          Figure 23: Existing roof terrace structures on the northern side of Hastings Street

   It is noted that in October 1986, an approval was issued for the eastern portion of the building
   (including Units U411 to U416) to allow for the provision of pergolas on the roof terrace areas,
   setback 6m from the northern roof terrace edge.
   The proposed pergolas are therefore not supported in their current form, and it is
   recommended the following condition be included:
   Roof Terrace Pergolas
   Pergolas on the roof terraces of Units U405 to U416 must be:
   a. setback a minimum of 6m from the northern roof terrace edge / balustrading;
   b. a maximum of 9m2 in area; and
   c. a maximum of 2.7m in height.
   These requirements are reflective of former planning scheme requirements (prior to the
   Noosa Plan 2006) that permitted limited roof terraces but sought to ensure any structures
   located on the terrace were not visually prominent and integrated with the roof line.
   CARPARKING
   The 1985 approval for TPC1737 (approval for the eastern portion of the building and
   amalgamation on the two halves of the development) conditioned the provision of 38 onsite
   carparks and the payment of a contribution of $65,000.00 for 13 additional carparks that
                                                                                           Page 37 of 84

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                                             12 OCTOBER 2020


        could not be provided onsite. Subsequent approvals for new uses and/or additional use area
        have also required payment of contributions in lieu of providing carparking on-site.
        Carparking requirements for Entertainment and Dining Business - Type 1 Food & Beverages
        under The Noosa Plan 2006 and Food and Drink Outlet under Noosa Plan 2020 are both
        calculated based on use area4, which excludes kitchen and food storage areas. In terms of
        carparking calculations, the proposed change triggers additional carparking for the 56.0m2
        increase in use area to the ground level Providore tenancy (refer to Figure 24) and 25.0m 2
        increase in use area to Level 1 via the addition of new amenities to be associated with the
        existing Sails Restaurant tenancy (refer to Figure 25).




                                   Figure 24: Additional 56m2 use area for The Providore




4
 use area means the sum of the area of the premises (exclusive of all walls and columns), including all storeys, used or intended for
use for a particular purpose. The term excludes—
a) the areas (inclusive of all walls and columns) of any lift rooms, motor rooms, air conditioning or other mechanical or electrical plant
     or equipment rooms located at any topmost storey;
b) The areas of any staircases or liftwells;
c) The areas of any common foyer or arcade;
d) The areas of any public toilets; and
e) The areas used for the access, parking and associated manoeuvring of motor vehicles

                                                                                                                     Page 38 of 84

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                  12 OCTOBER 2020




                      Figure 25: Additional 25m2 use area for Sails (amenities)



   Carparking requirements are as follows:
    Noosa Plan 2006                                       Noosa Plan 2020
    Entertainment and Dining Business -                   Food and Drink Outlet at 1 space per 20m 2 of
    Type 1 Food & Beverages at 1 space per                use area = 4.05 spaces
    10m2 of use area = 8.1 spaces
   As such, the development is required to provide four additional carparks on site. The proposal
   includes only one additional carpark to be located on site, on the existing driveway (refer to
   Figure 26). It is acknowledged that due to existing development on site, the subject site is
   significantly constrained in terms of limited remaining vacant site area. In addition, it is
   considered the locality would benefit from improved public transport, pedestrian or cycle
   facilities in conjunction with the provision of an additional car park on site. The applicant has
   advised that they are agreeable to enter into an Infrastructure Agreement to make
   contributions in lieu of the three car parking spaces that cannot be provided onsite. It is
   therefore recommended Council enter into an Infrastructure Agreement for three carparking
   spaces, at a rate of $24,000 per space (subject to indexation), as per the Contributions in
   Lieu of the Provision of Onsite Car Parking Council policy.




                                                                                        Page 39 of 84

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                   12 OCTOBER 2020




               Figure 26: Additional onsite carpark (located on the existing driveway)



   UNAPPROVED WORKS ON COUNCIL LAND
   Sails Restaurant
   Throughout the assessment of the minor change application, it has been established that the
   existing structures associated with the Sails Restaurant are located on public land (refer to
   Figure 27).




                                                                                         Page 40 of 84

Section 41

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020




                       Figure 27: Unapproved structure within Council land

   Sails Restaurant received an outdoor dining permit (Permit 56) from Council in 2002 for the
   use of a paved 28m2 area of Council land for outdoor dining purposes, which has been
   renewed annually since this time. The original dining permit allowed for 5 umbrellas to be
   used within the approved area. In 2003, a subsequent approval was issued to install pavers
   and stairs within the road reserve for outdoor dining.
   In 2003 (estimated), a retractable awning approximately 40m2 in area was erected within
   Council land, attached to the existing Sails restaurant. There are no records on Council’s
   files granting approval for the installation of the awning. In 2016, Council consented to a ‘like
   for like’ replacement of the awning as part of a refurbishment of the sail over the entire
   restaurant. At the time of this consent, it was not recognised by Council officers that the
   existing structure within Council land was unapproved.
   In addition, aerial photography indicates that between 2015 and 2016, an additional
   approximately 9m2 ‘storage area’ was added to the east of the existing unapproved structure
   within Council land. No approval was granted by Council for the erection of this additional
   structure. It has also been noted that from time to time, the grassed area of Council land to
   the west of the awning is also used for events.
   It is also noted that the current annual outdoor dining permit issued to Sails is calculated
   based on a use area of 28m2 only.
   These structures encroach onto public land and given the significant refurbishments to
   Netanya which involve increased gross floor area and site cover, it is appropriate that this be
   addressed at this time.
   It is recommended that the owner of Sails Restaurant be advised that the structures within
   Council land are unapproved and in excess of the approved outdoor dining area. Due to the
                                                                                    Page 41 of 84

Section 42

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020


   current economic climate and impacts of Covid, it is recommended that the Sails Restaurant
   be given 2 years to address these encroachments on to public land.
   Council’s Property Branch have provided the following comments in regards to the above:
   The land is road reserve and Council is the road Manager. Roads are managed under the
   Land Act 1994 and operational use under Section 66 of The Transport Operations (Road
   Use manager) Act 1995. Approvals for use of a road are issued under Local Law No.1
   (Subordinate Local Law No.1). Footpath dining is a consistent use on road and Council may
   authorise temporary structures over road or portable improvements on a road area in
   connection with a business being conducted on adjoining land for restaurant (e.g. footpath
   dining) retail or similar.
   Outdoor dining permits allow for dining only with the use of dining furniture and umbrellas
   within the approved area brought out and removed daily. Fixed structures on road reserve
   must be approved through a separate process. Applications are assessed on a case by case
   basis and can only be for temporary or portable improvements i.e. easily removed/relocated
   in connection with a business being conducted on adjoining land for restaurant (footpath
   dining) retail or similar purposes.
   The outdoor dining area for Sails restaurant has the ability to be completely enclosed when
   the awning is fully out with blinds that can be rolled down. The infrastructure installed would
   not lend itself to be classified as temporary or portable and appears to be an extension of the
   restaurant rather than outdoor dining space on public land.
   BBQ Area
   During an upgrade of the boardwalk along The Parade it was also identified that a BBQ and
   section of fence constructed by Netanya was on Council land. In 2018 Council agreed to not
   have the BBQ removed, however a Property Note was to be added to the property in
   Council’s record system stating ‘the BBQ owned and maintained by Netanya in the grassed
   area at the beach side of the property is partially located on the adjacent Council reserve,
   whilst Council are not instructing the Body Corporate to remove the BBQ, we reserve the
   right to do so if required’. Advice provided to Netayna Body Corporate at the time was that
   should the BBQ be replaced/upgraded at any stage, the BBQ is to be relocated wholly within
   the site, and is not permitted to be replaced on Council reserve. It is considered that the
   proposed total refurbishment of the site is an appropriate time to require the removal of the
   BBQ and fencing from Council land.




                             Figure 28: BBQ located on Council land


                                                                                  Page 42 of 84

Section 43

GENERAL COMMITTEE MEETING AGENDA                                                 12 OCTOBER 2020


   4.    NOOSA PLAN 2020
   The Noosa Plan 2020, which commenced on 31 July 2020, zones the subject site as Tourist
   Accommodation. This zone reflects the intent of the Visitor Mixed Use zone under the Noosa
   Plan 2006. The new scheme provisions for site cover and gross floor area accord with the
   Noosa Plan 2006. It is considered that no changes to the assessment or recommendation
   would result under the Noosa Plan 2020.
   5.    CONSULTATION
   5.1. Referral Agencies
   Not applicable
   5.2. Other Referrals
   The application was forwarded to the following internal Council specialists:
        NRA-CO-LAB – Architectural Peer Review by Noel Robinson
   5.3. Internal Council Referrals
   The application was forwarded to the following internal Council specialists:
       Ecologist, Development Assessment
       Coordinator Engineering, Development Assessment
       Property Officer, Property
   6.    CONCLUSION & REASONS FOR DECISION
   The proposed development seeks a minor change to a Development Permit for 47 Multiple
   dwellings, Entertainment & Dining - Type 1 Food & Beverage and Retail Business - Type 1
   Local and Type 2 Shop & Salon situated at Netanya, 71 Hastings Street, Noosa Heads. The
   proposed alterations are to the entire development, and included additional GFA to an
   existing café (The Providore) and restaurant (Sails), which are consistent uses within the
   Visitor Mixed Use zone.
   Despite not complying with Specific Outcomes O10 and O13 in respect to maximum site
   cover and gross floor area under The Noosa Plan, Noosa Heads Locality Code, the proposal
   complies with Specific Outcome O9 of the Locality Code. The development provides for
   additional use area for entertainment and dining businesses in an appropriate location,
   improving the amenity of patrons by providing additional weather protection and amenities.
   The development is consistent with the bulk and scale of buildings within the locality,
   maintaining the visual continuity and pattern of buildings along Hastings Street and The
   Parade. The proposal will refurbish the entire Netanya development, revitalising the dated
   façade and presenting a high quality and interesting streetscape via an improvement in the
   existing built form of the building. Although additional onsite carparking cannot be provided
   due to site constraints, the applicant has advised they are agreeable to enter into an
   Infrastructure Agreement to make contributions in lieu of car parking. The application is
   therefore recommended for approval subject to reasonable and relevant conditions.
   Departments/Sections Consulted:
         Chief Executive Officer         Community Services                      X   Corporate Services
         Executive Officer               Community Development                       Financial Services
         Executive Support               Community Facilities                        ICT
                                         Libraries & Galleries                       Procurement & Fleet
                                         Local Laws                              X   Property
                                         Waste & Environmental Health                Revenue Services

         Executive Services          X   Environment & Sustainable Development   x   Infrastructure Services
         Community Engagement            Building & Plumbing Services                Asset Management
         Customer Service            X   Development Assessment                      Buildings and Facilities
         Governance                      Economic Development                        Civil Operations
         People and Culture              Environmental Services                      Disaster Management
                                         Strategic Land Use Planning             x   Infrastructure Planning,
                                                                                     Design and Delivery



                                                                                      Page 43 of 84

Section 44

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020


   7    OUTCOMES OF COMMUNITY BUDGET CONSULTATION

   Author            Director Corporate Services, Michael Shave
                     Corporate Services Department

   Index             ECM/ Subject/ 2020-21 Budget

   Attachments       1.   Survey responses


   EXECUTIVE SUMMARY
   Not applicable.

   RECOMMENDATION
   That Council note the report by the Director Corporate Services to the General Committee
        Meeting dated 12 October 2020 and:
   A.   Note the outcomes of the community budget consultation undertaken between 7–27
        September 2020, provided as Attachment 1 to the report;
   B.   Note that Council will consider the priorities identified in the feedback when undertaking
        future 2020-21 budget reviews; and
   C.   Note the community’s preference for online community budget engagement process
        for future budgets and request staff to report back to a future Council meeting with
        options.


   REPORT
   At the Ordinary meeting on 18 June 2020, Council resolved to undertake an engagement
   process with the community on:
   1.   How the allocation of any additional funding should be prioritised if it becomes available
        through the financial year;
   2.   Where services/expenditure should be reduced if further budget reductions are
        required;
   3.   The preferred public consultation model for the 2021/22 budget process.
   This consultation was undertaken via YourSay Noosa between 7–27 September 2020. 156
   responses were received. The outcomes of the consultation are provided as Attachment 1.

   Question 1 - If Council has additional funds available, how should they be spent?
   Rank the following in order of preference, 1 being the most preferred.

   The graph below provides the average rank of scores for question 1. The ranking indicated
   that respondents on average want any additional funding available invested in infrastructure
   such as roads, bridges and parks. Respondents on average did not want to see any
   additional funds retained and the operating budget deficit reduced.




                                                                                  Page 44 of 84

Section 45

GENERAL COMMITTEE MEETING AGENDA                                         12 OCTOBER 2020




   Question 2 - If Council has less funds available, what services should be reduced?
   Rank the following in order of preference, with 1 being the most preferred service to
   reduce and 5 being the least preferred.

   The graph below provides the average rank of scores for question 2. The ranking indicated
   that respondents on average wanted delays in non-urgent capital works if Council’s budget
   position worsened. Respondents on average had the least preference for maintaining current
   service levels via increasing general rates in the February rates issue.




   It is recommended that Council consider the priorities identified by the community via
   questions 1-2 when undertaking Budget Review 2 (December 2020) and Budget Review 3
   (April 2021).

   Question 3 - How do you think the community should be involved in the preparation
   of future Council budgets? Rate the options in preferred order.

   The graph below provides the average rank of scores for question 3. The ranking indicated
   that respondents on average preferred to see an online engagement tool used for community

                                                                              Page 45 of 84

Section 46

GENERAL COMMITTEE MEETING AGENDA                                            12 OCTOBER 2020


   involvement in future Council budgets. Respondents on average had the least preference for
   no community involvement and leaving Councillors to continue to make budget decisions as
   elected community representatives.




   Given there are a number of available online budget engagement tools available, it is
   recommended that staff review options and report back to a future Council meeting.

   Previous Council Consideration
   Ordinary Meeting Minutes, 18 June 2020, Item 6, Page 10
   That Council note the report by the Director Corporate Services to the Services &
   Organisation Committee Meeting dated 9 June 2020 and:
   A.      Following Council’s adoption of the 2020/21 Budget, agree to engage with the
           community via Your Say Noosa on:
           1.   How the allocation of any additional funding should be prioritised if it becomes
                available through the financial year; and
           2.   Where services/expenditure should be reduced if further budget reductions are
                required.
   B.      Agree to engage with the community on their preferred public consultation model for
           the 2021/22 budget process; and
   C.      Request the Chief Executive Officer to provide a report to Council on the outcomes of
           both public consultation processes for Council’s consideration before it meets to
           consider its scheduled Budget Review 2 in November 2020.
   Finance
   The likely upfront and ongoing cost of software and staff resources required to deliver an
   online budget engagement tool and process will be reported back to Council - provided
   Council resolves to request staff to report back to a future Council meeting with options.

   Risks & Opportunities
   Risks
   Reputational – Council has progressed down the path towards consultation on future Council
   budgets. Community trust will likely be eroded should this process not result in an outcome
   whereby a consultation process is not established and implemented.

                                                                                 Page 46 of 84

Section 47

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020


   Financial – The costs of delivering a budget consultation process are not yet known, and will
   need to be considered and funded through a future budget review if a budget engagement
   process is implemented for the 2021/22 budget process.

   Priorities – Engagement processes with the community can achieve sub optimal outcomes
   and priority misalignment should wide engagement not occur as intended.

   Opportunities

   A budget consultation process is an opportunity to understand the spending priorities of our
   community and ensures that effective engagement continues to retain community confidence
   in Council processes and decision making.

   Consultation
   External Consultation - Community & Stakeholder
   The community was engaged via the Your Say Noosa link on Council’s website.

   Internal Consultation
   Chief Executive Officer
   Communications and Community Engagement Manager

   Departments/Sections Consulted:

   X    Chief Executive Officer      Community Services                      X   Corporate Services
        Executive Officer            Director                                X   Director
        Executive Support            Community Development                   X   Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

   X    Executive Services           Environment & Sustainable Development       Infrastructure Services
        Director                     Director                                    Director
   X    Community Engagement         Building & Plumbing Services                Asset Management
        Customer Service             Development Assessment                      Buildings and Facilities
        Governance                   Economic Development                        Civil Operations
        People and Culture           Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                   Page 47 of 84

Section 48

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020


                                       Attachment 1




                                       Page 48 of 84

GENERAL COMMITTEE MEETING AGENDA                                                                12 OCTOBER 2020

                                                                                                       Attachment 1

          Community input on Council Budget 20/21

                  if Council has additional funds available, how should they be spent?Rank the
                                   following in order of preference, 1 being the ...

                         OPTIONS                                                 AVG. RANK
                          Roads, Bridges and Road Maintenance                           3.56
                          Parks & Pathways                                              4.04
                          Fire breaks & controlled burns                                4.19
                          Environmental and sustainability projects                     4.24
                          Resurne waste kerbside collection                             5.02
                         Community support grants                                       5.46
                         Provide a one-off subsidy in the February rates notice         6.10
                          Business support grants                                       6.10
                         Retain the funds and reduce council's current $1.8 million deficit for 6.29
                         this budget

            Mandatory Question (156 response(s))

                                                                                                       Page 1

                                                                                                       Page 48 of 84

Section 49

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 49 of 84

GENERAL COMMITTEE MEETING AGENDA                                                         12 OCTOBER 2020

                If Council has less funds available, what services should be reduced?Rank the
              following in order of preference, with 1 being the most preferred service to reduce
                                       and 5 being the least preferred.

                       OPTIONS                                            AVG. RANK
                      Consider delaying non-urgent capital works or upgrades     2.05
                      Reduce the operating hours at facilities such as libraries, NAC, Art 2.85
                       Gallery
                      Reduce funds to the environmental grants program           2.90
                       Temporarily reduce roadworks, mowing and street sweeping  3.41
                      Maintain all service levels and increase general rates in the next rate 3.76
                      levy (February 2021)

           Optional question (156 response(s), 0 skipped)
           Question type: Ranking Question

                                                                                              Page 2

                                                                                               Page 49 of 84

Section 50

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 50 of 84

GENERAL COMMITTEE MEETING AGENDA                                                       12 OCTOBER 2020

              How do you think the community should be involved in the preparation of future
                        Council budgets?Rate the options below in preferred order.

                      OPTIONS                                            AVG. RANK
                     Conduct an online engagement process, seeking feedback on a 1.70
                      range of budget areas and key projects
                     Conduct a series of community workshops across the shire  254
                      Establish a Community Reference Group via an expression of 2.69
                      interest process
                      Councillors should continue to make budget decisions as elected 3.08
                     community representatives

           Mandatory Question (156 response(s)

                                                                                            Page 3

                                                                                             Page 50 of 84

Section 51

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 51 of 84

GENERAL COMMITTEE MEETING AGENDA                                                      12 OCTOBER 2020

            What is one area you would like to see Council focus spending on in future budgets?

                     vehicles. no plastic etc. Putting the region on the ap for its sustainab a

           5/09/2020 | That would be to address the most urgent crisis facing the survival of our planet and all of its
                     inhabitants.... Climate Change! Therefore measures put in place to reduce our carbon
                    emissions in any way we can including the introduction of electric buses and charging points for
                    electric cars and provision for safer laneways for electric bikes and scooters.
           5/09/2020 | Appreciation of the countless hours & expertise of bushcare groups who save council
                    thousands of dollars in skilled smart volunteer work. Eg PBCA, NPA. Vegetation management
                     expertise.
                    Council needs to review departments like planning(what do they do, there are no developments
                    or social housing projects going on, what do they do?) and library (times have changed)
                    Nature is Noosa’s advantage, look after it & show gratitude to all the free workforce taking care
                    of it.
                    Get on with the basics, review the workforce to ensure it is sleek & relevant.

                     residents, Council run ferry on the river?
           7/09/2020 | A balanced approach to Toursm and locals. Tounsm ts a great income generator for local
        a business, but it does impact the livability of the area during peak time. Unsure what the answer
                     is.
                    roads have no infrastructure for a mega quarry.
           7/09/2020 | We need all parts of Noosa Shire to be included in your mowing and road maintenance.
                    Pioneer Road is suppose to be done every three months and yet again, another year it has
                    been done once in 9 months. Excuse every time.. Kids walk on this road and elderly people.
                    You need to fix the road that these quary trucks are using!!! Over 60 a day. You need to control
                    the time they are starting.. Pretty sure 5.00am is against noise correct? bus stops for the
                    children would be nice as well on Pioneer Road.. Footpaths for safe walking into town. Pomona
                    gets left out all the time for upgrades because your focus is always hasting... Please we are
                    also paying rates out here and fall under noosa shore last time | checked.
           7/09/2020 | Upgrading the area between the RSL park, council chambers and the marina. | think the
                    historical town of Tewantin and the home of the council itself needs to have a beautiful and
                    more user   end  green co        Dace
           7/09/2020 | Allocate money to the Hinterland communities of Kin Kin, Pomona and Cooran to.....
                     1. Either buy Kin Kin Quarry or demand complete rebuild of the Pomona Kin Kin Road from
                    Sheppersons Lane (where the quarry is located) to the Old Bruce Highway. The Road has
                    completely degraded and is not fit for heavy vehicle use.
                    have not been upgraded fir so long. Provide new interest, more skill opportunities etc

                    The council generally has it ight. Perhaps some more infrastructure and repair spending in the
                      orgotten" areas like Cooroibah.
           7/09/2020 | repairing and enhancing the steps from Hastings to Upper Hastings St. this should be a prionty
                    because (a) the current steps are dangerous and somebody will suffer an injury, (b) improving
                    this access will allow more residents / quests to walk to Hastings St and thereby reduce vehicle
                    traffic and increase spending on Hastings St, (c) it will align with the recent improvements to the
                    Park Rd walk way and related steps. thanks
           7/09/2020 | It ts important that we continue to fund projects that enhance Noosa’s environmental integrity.
                    This is the point of difference which attracts people to the area and we also need to ensure the
                    flora and fauna of the area protected, even if, paradoxically to the first statement in this
                     sentence, that means less people. No funding should be going to business at all. Business is
                    private enterprise which rewards risk taking and quality product. Local government has no role
                     in this.

                                                                                          Page +

                                                                                            Page 51 of 84

Section 52

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 52 of 84

GENERAL COMMITTEE MEETING AGENDA                                                     12 OCTOBER 2020

          7/09/2020 | 1. Cooroy or Pomona dumps open longer weekend hours (at least one)
                    2. Curb side rubbish collection
                    3. Free green dumping
                    4. More bike paths
          8/09/2020 | CUT DOWN LARGE DANGEROUS GUMTREES & LARGE NORFOLK PINES THESE
                   TREES ARE NOT MEANT TO BE IN TEWANTIN SUBURBAN AREAS & LARGE
                    GUMTREES SHOULD BE CUT DOWN OPPOSITE POWER TRANSFORMERS FOR
                    SAFETY REASONS WOULD YOU LIKE A GUMTREE FALLING A ND PUSHING A POWER
                    TRANSFORMER INTO YOUR HOME
          8/09/2020 | *Dealing with the Noosa Catchment and River health.
        = *Monitoring closely the treated water being released from the Kin Kin Quarry. Sheppersons
                   Lane Kin Kin.
                    Install Solar powered lighting Noosa Springs Drive walking pathways from intersection at from
                    Leslie drive roundabout to Eenie creek rd overpass
                   Fenced off dog park. Rego fees are extravagant & we get nothing but a couple of poo bags, |
                   supply my own. Over 10,000 Registered dog, we need a fenced dog park
          —_       beyond Pomona, but we do love a good revenue raiserof fining owners, don't we? Let alone
          8/09/2020 | More off leash dog parks. Use Buderim Dog Park as a model. Total lack of off leash areas
                   Noosa's dog registration fees on comparison to Gympie and Sunshine Coast Councils. Not all
                    residents live by the beach. Consider your Hinterland Co ity too.
          9/09/2020 | Road and park , beach access maintenance, environment, committed to supporting police with
                   heavy fines for wrongful acts be it animals, public nuisances like perverts at beaches and
                   schools ... signs up warning offenders.
                     Stop taking pay rises and not delivering what co ity asks for.
          9/09/2020 | councillors wages need to be reacessed and reduced. the funds for these salleries arrive from
                   people having to go to work. the jobs the people have for a big percetage of the population, will
                   never equal what councillors get. how can councillors equate this, i have never seen a
                   councillor darken my door step in the time i have live in this shire. people have to strugle to
                   work, find work, where their sallaries are decided for them. yet we have no choice what
                    exhorbitant rates you get as councillors. it really amazes me that a few golden people in our
                    society, ones whom claim they work for us, are able to select their own salary. and councillors
                    think that is ok. yet when we make a point it is completely ignored. we have three levels of
                   government in this country, all have their heads in the trough. we have no choice of how much
                     Day and conditions councilors get. that is repulsive.
                    CHARGING US THE TOURISM LEVY
                    Environment levy for adaptation against climate change and to mitigate the impacts of climate
                    change in the shire

         11/09/2020 | The time has arived where local inhabitants make the decision whether fish are taken out of
                   the ocean and river systems for unrestrained, unself-regulated, unsustainable, recreational
                   fishing practices. Research could be funded to see what fish species are left in our waters and
                    the relationship these species have on the health of the entire ecosystem and other species
                   dependent on their survival - for example; dolphins, sea eagles, brahmin kites, albatrosses and
                   migrating terns. In the endless drive for Tourism numbers this beautiful region will increasingly
                   be overrun by day-tnipping fishermen, and spear-fishermen, from the extended Brisbane region,
                   and cashed-up amateurs utilising local fishing charter operations. In combination, all viable
                   species of sea-life are being decimated from local waters, reefs and river systems. Solid
                   environmental research would undoubtably propose that all of Noosa's Oceanic, Reef and
                   River systems be classified as No-Take Zones, allowing the aquatic ecosystem to recover its
                    integrity and function . Articles have indicated that the Noosa River's underwater landscape is
                   an environmental nightmare of snagged fishing lines and tackle. You may counter that its the

                                                                                         Page 5

                                                                                            Page 52 of 84

Section 53

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 53 of 84

GENERAL COMMITTEE MEETING AGENDA                                                       12 OCTOBER 2020

                    right of anyone to cast a line, kill a wild sea animal and leave a tangle of nylon line and strewn
                    bait bags when they decamp. However | believe that all recreational activities do not have to
                    be covered in drawing tourist demographics to the region. In fact declaring a Manne Sanctuary
                    may have a distinct advantage in the class and wealth of people drawn to the region. Many
                    locals, and holiday-makers love to take a stroll on the beach, watch the sea birds scouting for
                    dinner, catch some dolphins at play, watch the sunset, take a surf, take an extreme fitness
                    angle (which is the growth area) not take out sea life for their own short-term satiation. The
                    local dolphin family which still ply our waters and the pair of sea eagles at North Sunshine
                    Beach, and the nesting pair of Brahmin kites at Little Cove do not have the capacity to shimmy
                    up to the Junction of an afternoon to pick up dinner from Coles. A Marine Sanctuary would
                    align very nicely with the whole ethos surrounding a world Surfing Reserve and the Noosa
                     Biosphere projects.

       | 11/09/2020 |Community
                    residents chose to live in the Shire. Retain our regional status and not look to become yet
                    another big ci

                    contacted council about foxes and was told (basically) to suck it up +

            —_       e. g. build green bridges for koalas,©) as opposed to so-called sustainable
5	1	1	4	1	14	1786	1660	136	44	96	projects that
          12/09/2020 | Environmental projects that make sense and that are genuinely beneficial to nature and wildlife,
                     interfere with nature and are only beneficial to a few humans., €.g. the Noosa trail masterplan at
                     Pomona/KinKin®
                    station and NO toilets !!!! The traffic on North Shore is like the Bruce Highway. A big must is for
                    more toilets ASAP
                    Retaining our natural environment by purchasing bush land for protection from development.
                     Invest in social housing for the homeless.
          13/09/2020 | Economic and environmental sustainability. Community resilience in these uncertain times is
                    absolutely vital to building and maintaining happy, healthy communities. To do this we need to
                    work together to maintain the balance between protecting our environment and lifestyle and
                    ensuring we have business and economic diversification to support our population. Education,
                     innovation and collaboration is key.
          13/09/2020 | Sustainability- projects and spend that have an environmental, social AND economic return, ie
                    upgrades (such as conversion to solar) that result in a facility having lower operational and
                    natives results in much lower maint. Costs if it doesn't have to be constantly mowed, weed
                     sprayed etc
                    Road duplication and widening to ease traffic issues. Especially travelling north to south ie.
                     Beckman’s Road duplication. Think about a plan for Hastings St traffic and parking.
                     CO     i  pene ando Joing emo    C4  oppor  ities. |.e. build g capacity.
          13/09/2020 | | would prefer that the kerbside collections be abandoned and a subsidy paid to ratepayers to
                    hire a contractor to remove their rubbish to the tip. There are details that need to be considered
                    but | understand that only a small fraction of residents of the Noosa Shire put out rubbish at the
                    annual kerbside clean up. It could possibly save council money.

                                                                                           Page 6

                                                                                             Page 53 of 84

Section 54

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 54 of 84

GENERAL COMMITTEE MEETING AGENDA                                                     12 OCTOBER 2020

          SS
         13/09/2020 | Road maintenance with relevant training. Residident in Cooroy are two international experts in
                    course programs viz Centre for Pavement Education
         13/09/2020 | On george steet in tewantin children & adults walk on both sides of the footpaths i would like to
                    see all the huge gumtrees cut down have seen many branches fall & nearly miss people &
                    children walking to school & home & cars they are a death trap i love trees but gumtrees
                    should never be in suburbia
         13/09/2020 | Review existing Council programs to align them in support of Noosa’s unique positioning on the
                    Coast . | have observed things going downhill with the green natural assets that have attracted
                    people to Noosa as a high value niche location for generations. Eg street greenery being
                   removed and not replaced or road plantings pruned to 1/4 of its size so the bushes never really
                    recover? Destruction of mangrove fish nursenes. Wail to wall houses under the guise of
                    retirement estates with no green space. Simple things that change the look and feel of the
                    place. We'll not do well becoming like the Gold Coast overrun with inappropriate development
                    either.  Support small business and keep big corporate influences out of Council
         13/09/2020 | Parking. It is rediculous that there are so many spaces in and around Noosa/Hasting St that
                    cars could readily park - but can't as they would get a fine. As a long term Noosa local. Do not
                   tell me to catch a bus to enjoy my back yard. Provide priority parking for locals? Local sticker?
                    Lots of options. Lots of spaces in the surrounding areas that for some bizarre reason Council
                     Says No parking. Council envoys the revenue of parking tickets. Very sad.
         14/09/2020 | equal spending on ALL parks.....why is all the money spent on areas in Hastings St and
                    Gympie Tce which are seen by non-rate paying tourists.....yet very little spent on parks that
                    local ratepayers spend their time (other than just general maintenance, mowing, etc). general
                      pgrade should be done as is in the tourist areas.
                   Roads and the environment and safety of the animal population of the shire.
         14/09/2020 | If the Tourism and Economic Levy were utilised to cover the maintenance costs of all ceremony
                    sites in the Noosa Shire, and the permit fees for ceremonies in Noosa were brought in line with
                    the Sunshine Coast, or less, this will bring great economic benefit to my business, and to all the
                   wedding industry and tourism businesses in Noosa.
                    Undercover options/Multipurpose / wedding chapel — A large and beautiful undercover area at
                   Noosa Woods, Chaplin Park, and the Noosa Botanic Gardens would bring quality weddings to
                    the Noosa Region
                    Funding to Tourism Noosa to SUPPORT the wedding and honeymoon industry.
         14/09/2020 | SUPPORT FOR LOCAL BUSINESSES
                   As a small business owner with a wedding industry business, Noosa WEDDING PERMIT FEES
                   ARE OUTRAGEOUS. These huge fees are discouraging couples from booking and staying in
                    Noosa. As a provider of Small and intimate weddings, to pay $567 is just a 'No Way’, to stand
                   on a piece of grass, which is not exclusive - they may have to share with picnicers who pay
                    nothing to be there. | would like to see the Tourism and Economic Levy utilised towards
                   maintenance of the x4 Groves, and ALL other ceremony sites. | would like to see FREE
                    permits on beaches, where no maintenance is required, and a fee to cover the cost of admin, in
                    the range of $75 for my 6 people to stand for half an hour.
                   So - TOURISM AND ECONOMIC LEVY towards maintenance of the Groves (3 of which are not
                    properly maintained anyway)
                    FUNDING TO TOURISM NOOSA for promotion of weddings (happy if these are biosphere
                    wedding and honeymoon options)
                    MULTIPURPOSE BUILDINGS SUITABLE AS A CHAPEL - Noosa Woods, Chaplin Park and
                    Botanic Gardens would be ideal.
                    | am receiving more inquiries than ever for elopement and small weddings - Queensland
                    couples want to come to Noosa for their wedding and honeymoon, and all the money they have
                    saved up for the destination wedding overseas, will now be spent on themselves. This is an
                   amazing opportunity to encourage couples to come to Noosa and enjoy our biosphere, and
                   mary in the most beautiful location in the world. | NEED JUST A LITTLE BIT OF HELP -
                    REDUCED WEDDING PERMIT FEES
                    situations, low paid workers.
                   Supporting Local Business, especially the Wedding Industry that brings a great impact on the
                    Noosa econo

                                                                                         Page 7

                                                                                            Page 54 of 84

Section 55

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 55 of 84

GENERAL COMMITTEE MEETING AGENDA                                                     12 OCTOBER 2020

         14/09/2020 | SUPPORTING LOCAL BUSINESS by...
                    * If the Tourism and Economic Levy were utilised to cover the maintenance costs of all
                   ceremony sites in the Noosa Shire, and the permit fees for ceremonies in Noosa were brought
                    in line with the Sunshine Coast, or less, this will bring great economic benefit to my business,
                    and to all the wedding industry and tourism businesses in Noosa.
                    * Undercover options/Multipurpose / wedding chapel — A large and beautiful undercover area at
                   Noosa Woods, Chaplin Park, and the Noosa Botanic Gardens would bring quality weddings to
                   the Noosa Region
                    * Funding to Tourism Noosa or the Noosa Wedding Organisation to SUPPORT the wedding
                   and honeymoon industry.
         14/09/2020 | SMALL BUSINESS SUPPORT.
                    | am a young person in my 20's, just starting out in business offering a photography and
                   wedding elopement service in Noosa. | grew up in Noosa and went to school here, and would
                   like to stay working in the area.
                    | have a lot of inquiries for elopement weddings, with just the couple and a few witnesses, and
                    they want to get marmied on Casuarina Gardens, but it costs them $567, so they don't book and
                    they go elsewhere. They would be happy to pay around $75 for the 20 minutes we need to
                    stand on the grass.
                   Please spend some of the Tourism and Economic money on covering some of the costs of the
                    ceremony sites in Noosa.
                   Money to Wedding Tourism would be good, too
                    Chapels and wet weather options would be great
                   southerm areas environmental protection and waste recovery jobs that have been on lists for 10
                     ears or more
                    environmental sustainability, climate change adaptation, which include support of objectives of
                    Noosa Biosphere Reserve
                   Weddings spots on Hastings Street, The Grove etc should be reduced immediately. Council
                   and Tourism Noosa should be supporting Noosa Wedding Industry not supporting vendors and
                   small businesses to go broke.

         16/09/2020 | Supporting the wedding industry and the associated tourism.
                    Building a chapel as a wt weather and alternative option to the groves along Hastings Street
                    beachfront
         17/09/2020 | Maintaining existing facilities and not let Noosa, Tewantin especially loose its charm - A big
                    saving to council would be no kerb side rubbish collect and giving ratepayers a pass with rate
                    notice for a tip drop it will also solve many problems
         17/09/2020 | An after hours/weekend hotline and action group to monitor and attend party houses in Noosa
                    that are greatly impacting rate paying residents and their quality of life. Council allows them,
                   council should be responsible for policing them and minimising the impact they have on
                     permanent Noosa residents

                    and visited but also to keep it local and sustainable for the community.
         18/09/2020 | | know the bicycle is very important both revenue and tourist wise but our roads still are not
                   geared for it - | believe Cooroy-Noosa Road is classified main road but Lake MacDonald Rd
                   needs widening - believe me, I'm not anti bike but anti accident so the roads have to be
                   addressed - the people of Lake MacDonald were promised a new road by Council when
                   Collwood Rd was closed due water treatment plant but somehow we are always forgotten- it
                    would ease traffic in Cooroy and encourage tourism to the Botanical Gardens

                                                                                         Page 8

                                                                                            Page 55 of 84

Section 56

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 56 of 84

GENERAL COMMITTEE MEETING AGENDA                                                      12 OCTOBER 2020

                    who will do the work?  Backpackers?
         18/09/2020 | Maintaining roads, mowing, street sweeping, parks and so forth should remain the same,
                    reducing these services has a knock on effect on community pride and lowers the esteem of
                    the area in general. Libraries too are important community resources for those that need them.
                   Without these basic amenities, overall community morale suffers. I've seen this happen with
                    local council austerity measures in England, and it costs more long term.

                    vandals ... | wonder if there’s some sort of frame that can be put around the lovely sapling-sized
                    trees that council plants to protect them from idiots who break them off. Also litter is pretty bad
                    between the junction and Hastings st especially after long weekends.

         19/09/2020 | Well it shid be NOW. Not in the Future. The Noosa Council working in with the Police to reduce
                    the FERAL SPEEDING and DRIVING BEHAVIOUR . The toxic fumes and speeding Sun Buses
                    especially in Goodchap Street. It is vv DANGEROUS and OUT OF CONTROL and the Noosa
                    Council had done NOTHING to address the situation for the last THREE YEAR'S.
         19/09/2020 | Please support and encourage, not discourage, local wedding businesses and the wedding
                    (1) by reducing the permit fees for outdoor wedding ceremonies. | would also like to see a
                    special discounted permit fee during the Covid pandemic to encourage outdoor weddings at
                    Noosa Council venue sites.
                    (2) provide undercover options to provide shade in the hot summer months and cover when it
                    rains. | am a local wedding celebrant and it is truly heartbreaking for couples (and their quests)
                   when months (sometimes years) of planning for their Big
5	1	1	5	3	10	1510	1443	67	41	79	Day’
5	1	1	5	3	11	1576	1443	110	41	95	results
5	1	1	5	3	12	1685	1443	36	41	96	in
5	1	1	5	3	13	1730	1453	19	21	96	a
5	1	1	5	3	14	1757	1443	127	41	96	scramble
5	1	1	5	3	15	1887	1443	42	41	96	to
5	1	1	5	3	16	1928	1443	72	41	96	find
5	1	1	5	3	17	1999	1443	46	41	96	an
4	1	1	5	4	0	646	1485	467	26	-1	
5	1	1	5	4	1	646	1485	467	26	90	altemative
5	1	1	5	4	2	806	1481	96	41	95	venue
5	1	1	5	4	3	905	1481	76	41	94	when
5	1	1	5	4	4	987	1481	31	41	94	it
5	1	1	5	4	5	1024	1481	93	41	95	rains.
3	1	1	6	0	0	644	1525	1433	105	-1	
4	1	1	6	1	0	644	1525	1433	33	-1	
5	1	1	6	1	1	629	1521	70	41	96	The
5	1	1	6	1	2	698	1521	89	41	95	large
5	1	1	6	1	3	798	1521	126	41	94	majority
5	1	1	6	1	4	925	1521	43	41	96	of
5	1	1	6	1	5	971	1521	42	41	96	my
5	1	1	6	1	6	1015	1521	141	41	96	weddings
5	1	1	6	1	7	1159	1521	76	41	95	have
5	1	1	6	1	8	1237	1521	162	41	95	interstate
5	1	1	6	1	9	1401	1521	63	41	95	and
5	1	1	6	1	10	1463	1521	138	41	96	overseas
5	1	1	6	1	11	1603	1521	189	41	96	participants
5	1	1	6	1	12	1794	1521	63	41	96	who
5	1	1	6	1	13	1856	1521	76	41	96	stay
5	1	1	6	1	14	1934	1521	35	41	96	in
5	1	1	6	1	15	1979	1521	100	41	96	Noosa
4	1	1	6	2	0	644	1563	1364	32	-1	
5	1	1	6	2	1	630	1559	61	40	96	for
5	1	1	6	2	2	696	1569	20	20	96	a
5	1	1	6	2	3	723	1563	242	32	96	number
5	1	1	6	2	4	836	1559	48	40	96	of
5	1	1	6	2	5	886	1559	95	40	95	days.
5	1	1	6	2	6	980	1559	87	40	95	Many
5	1	1	6	2	7	1066	1559	111	40	95	guests
5	1	1	6	2	8	1180	1559	57	40	96	who
5	1	1	6	2	9	1240	1559	57	40	96	are
5	1	1	6	2	10	1296	1559	145	40	95	first-time
5	1	1	6	2	11	1443	1559	124	40	95	visitors
5	1	1	6	2	12	1570	1559	41	40	96	to
5	1	1	6	2	13	1610	1559	94	40	96	Noosa
5	1	1	6	2	14	1706	1559	81	40	96	then
5	1	1	6	2	15	1786	1559	84	40	96	come
5	1	1	6	2	16	1870	1559	77	40	96	back
5	1	1	6	2	17	1950	1559	57	40	96	for
4	1	1	6	3	0	645	1604	250	26	-1	
5	1	1	6	3	1	634	1600	100	41	95	future
5	1	1	6	3	2	736	1600	159	41	93	vacations.
3	1	1	7	0	0	420	1680	1619	74	-1	
4	1	1	7	1	0	646	1685	1393	32	-1	
5	1	1	7	1	1	634	1677	173	45	96	Continuing
5	1	1	7	1	2	810	1677	215	45	96	environmental
5	1	1	7	1	3	1028	1677	121	45	96	projects
5	1	1	7	1	4	1152	1677	68	45	94	like
5	1	1	7	1	5	1219	1677	87	45	96	bring
5	1	1	7	1	6	1305	1677	76	45	96	back
5	1	1	7	1	7	1380	1677	57	45	96	the
5	1	1	7	1	8	1437	1677	68	45	95	fish
5	1	1	7	1	9	1508	1677	64	45	95	and
5	1	1	7	1	10	1572	1677	165	45	96	supporting
5	1	1	7	1	11	1740	1677	54	45	96	the
5	1	1	7	1	12	1797	1677	150	45	96	Biosphere
5	1	1	7	1	13	1947	1677	94	45	96	raise
4	1	1	7	2	0	646	1722	409	27	-1	
5	1	1	7	2	1	631	1718	53	42	94	all
5	1	1	7	2	2	684	1718	144	42	96	residents
5	1	1	7	2	3	827	1718	134	42	96	standard
5	1	1	7	2	4	960	1718	43	42	93	of
5	1	1	7	2	5	1047	1722	38	22	69	livinc
3	1	1	8	0	0	440	1804	1540	109	-1	
4	1	1	8	1	0	440	1804	1493	32	-1	
5	1	1	8	1	1	440	1804	170	26	96	22/09/2020
5	1	1	8	1	2	609	1800	28	40	96	|
5	1	1	8	1	3	645	1800	195	40	96	Traineeships
5	1	1	8	1	4	846	1800	150	40	95	supported
5	1	1	8	1	5	999	1800	47	40	96	by
5	1	1	8	1	6	1046	1800	117	40	96	council
5	1	1	8	1	7	1162	1800	58	40	96	for
5	1	1	8	1	8	1219	1800	91	40	96	under
5	1	1	8	1	9	1317	1804	81	26	96	17-21
5	1	1	8	1	10	1402	1800	74	40	96	year
5	1	1	8	1	11	1476	1800	81	40	94	olds,
5	1	1	8	1	12	1562	1800	101	40	96	grants
5	1	1	8	1	13	1666	1800	57	40	96	for
5	1	1	8	1	14	1722	1800	61	40	96	RTO
5	1	1	8	1	15	1786	1800	57	40	96	for
5	1	1	8	1	16	1846	1800	91	40	96	youth
4	1	1	8	2	0	646	1844	1334	33	-1	
5	1	1	8	2	1	628	1840	196	41	96	employment
5	1	1	8	2	2	826	1840	42	41	96	or
5	1	1	8	2	3	870	1840	100	41	96	grants
5	1	1	8	2	4	970	1840	55	41	96	for
5	1	1	8	2	5	1024	1840	83	41	95	local
5	1	1	8	2	6	1110	1840	130	41	96	business
5	1	1	8	2	7	1243	1840	41	41	96	to
5	1	1	8	2	8	1287	1840	70	41	96	take
5	1	1	8	2	9	1359	1840	42	41	95	on
5	1	1	8	2	10	1403	1840	87	41	96	youth
5	1	1	8	2	11	1492	1840	56	41	93	for
5	1	1	8	2	12	1547	1840	182	41	89	traneeships
5	1	1	8	2	13	1731	1840	155	41	96	especially
5	1	1	8	2	14	1896	1844	27	27	96	in
5	1	1	8	2	15	1923	1840	55	41	96	the
4	1	1	8	3	0	647	1882	823	31	-1	
5	1	1	8	3	1	630	1878	111	39	96	Noosa
5	1	1	8	3	2	740	1882	554	26	76	Hinterland
5	1	1	8	3	3	912	1878	92	39	96	where
5	1	1	8	3	4	1003	1878	86	39	96	there
5	1	1	8	3	5	1088	1878	40	39	96	is
5	1	1	8	3	6	1130	1878	27	39	94	a
5	1	1	8	3	7	1156	1878	76	39	94	lack
5	1	1	8	3	8	1234	1878	40	39	94	of
5	1	1	8	3	9	1330	1891	140	22	94	employment.
3	1	1	9	0	0	420	1917	1576	77	-1	
4	1	1	9	1	0	647	1922	1349	33	-1	
5	1	1	9	1	1	631	1913	239	46	93	Environmental
5	1	1	9	1	2	869	1913	146	46	91	concems,
5	1	1	9	1	3	1018	1913	120	46	96	helping
5	1	1	9	1	4	1137	1913	62	46	97	the
5	1	1	9	1	5	1198	1913	89	46	96	aging
5	1	1	9	1	6	1294	1913	193	46	96	demographic
5	1	1	9	1	7	1490	1913	66	46	90	feel
5	1	1	9	1	8	1559	1913	66	46	97	part
5	1	1	9	1	9	1628	1913	35	46	97	of
5	1	1	9	1	10	1666	1913	62	46	96	the
5	1	1	9	1	11	1727	1913	170	46	96	community
5	1	1	9	1	12	1900	1913	100	46	96	(move
4	1	1	9	2	0	646	1963	449	26	-1	
5	1	1	9	2	1	646	1963	449	26	95	services
5	1	1	9	2	2	771	1959	73	41	96	back
5	1	1	9	2	3	843	1959	52	41	87	off
5	1	1	9	2	4	894	1959	66	41	87	line
5	1	1	9	2	5	959	1959	56	41	96	for
5	1	1	9	2	6	1017	1959	76	41	96	them
3	1	1	10	0	0	440	2004	1632	220	-1	
4	1	1	10	1	0	440	2004	1616	32	-1	
5	1	1	10	1	1	440	2004	170	26	94	23/09/2020
5	1	1	10	1	2	606	2000	27	40	96	|
5	1	1	10	1	3	647	2004	7	26	91	|
5	1	1	10	1	4	662	2000	84	40	96	would
5	1	1	10	1	5	746	2000	67	40	96	like
5	1	1	10	1	6	816	2000	36	40	96	to
5	1	1	10	1	7	859	2000	114	40	96	request
5	1	1	10	1	8	984	2010	19	20	95	a
5	1	1	10	1	9	1002	2000	138	40	95	footpath
5	1	1	10	1	10	1144	2000	46	40	93	on
5	1	1	10	1	11	1189	2000	184	40	91	Shorehaven
5	1	1	10	1	12	1376	2000	90	40	84	Drive
5	1	1	10	1	13	1466	2000	134	40	95	between
5	1	1	10	1	14	1609	2004	39	26	91	37
5	1	1	10	1	15	1656	2000	181	40	90	Shorehaven
5	1	1	10	1	16	1836	2000	91	40	95	Drive
5	1	1	10	1	17	1932	2000	62	40	95	and
5	1	1	10	1	18	2005	2004	51	26	96	101
4	1	1	10	2	0	646	2041	1395	33	-1	
5	1	1	10	2	1	628	2037	199	41	91	Shorehaven
5	1	1	10	2	2	826	2037	100	41	92	Drive.
5	1	1	10	2	3	935	2037	172	41	91	Shorehaven
5	1	1	10	2	4	1110	2037	42	41	96	is
5	1	1	10	2	5	1163	2047	19	21	94	a
5	1	1	10	2	6	1185	2037	72	41	96	busy
5	1	1	10	2	7	1260	2037	114	41	96	street,
5	1	1	10	2	8	1373	2037	66	41	96	with
5	1	1	10	2	9	1441	2037	73	41	96	cars
5	1	1	10	2	10	1513	2037	110	41	96	always
5	1	1	10	2	11	1622	2037	110	41	96	parked
5	1	1	10	2	12	1735	2037	42	41	96	on
5	1	1	10	2	13	1779	2037	56	41	96	the
5	1	1	10	2	14	1848	2037	62	41	96	kerb
5	1	1	10	2	15	1909	2037	59	41	95	and
5	1	1	10	2	16	1967	2037	74	41	77	itis
4	1	1	10	3	0	646	2079	1378	32	-1	
5	1	1	10	3	1	638	2075	118	40	95	difficult
5	1	1	10	3	2	755	2075	54	40	96	for
5	1	1	10	3	3	812	2075	41	40	96	my
5	1	1	10	3	4	855	2075	124	40	95	children
5	1	1	10	3	5	982	2075	40	40	95	to
5	1	1	10	3	6	1022	2075	101	40	96	safely
5	1	1	10	3	7	1128	2075	54	40	89	ride
5	1	1	10	3	8	1182	2075	84	40	96	their
5	1	1	10	3	9	1265	2075	81	40	93	bikes
5	1	1	10	3	10	1356	2079	13	26	93	/
5	1	1	10	3	11	1375	2075	131	40	96	scooters
5	1	1	10	3	12	1508	2075	105	40	96	around
5	1	1	10	3	13	1615	2075	67	40	96	this
5	1	1	10	3	14	1685	2075	74	40	96	area
5	1	1	10	3	15	1762	2075	114	40	96	without
5	1	1	10	3	16	1875	2075	108	40	96	having
5	1	1	10	3	17	1982	2075	41	40	96	to
4	1	1	10	4	0	646	2119	440	33	-1	
5	1	1	10	4	1	635	2115	89	41	96	cross
5	1	1	10	4	2	727	2115	56	41	96	the
5	1	1	10	4	3	785	2115	76	41	95	road
5	1	1	10	4	4	860	2119	226	33	95	multiple
5	1	1	10	4	5	983	2115	104	41	96	times.
4	1	1	10	5	0	647	2157	1425	26	-1	
5	1	1	10	5	1	647	2157	7	26	90	|
5	1	1	10	5	2	660	2153	89	41	96	would
5	1	1	10	5	3	748	2153	70	41	96	also
5	1	1	10	5	4	817	2153	69	41	96	like
5	1	1	10	5	5	889	2153	35	41	96	to
5	1	1	10	5	6	930	2153	59	41	96	see
5	1	1	10	5	7	991	2153	56	41	96	the
5	1	1	10	5	8	1049	2153	121	41	96	Council
5	1	1	10	5	9	1169	2153	59	41	95	tum
5	1	1	10	5	10	1230	2153	42	41	95	on
5	1	1	10	5	11	1275	2153	59	41	96	the
5	1	1	10	5	12	1340	2153	89	41	96	water
5	1	1	10	5	13	1428	2153	117	41	96	feature
5	1	1	10	5	14	1555	2153	35	41	96	in
5	1	1	10	5	15	1592	2153	100	41	96	Noosa
5	1	1	10	5	16	1697	2153	112	41	96	Waters
5	1	1	10	5	17	1816	2153	37	41	96	at
5	1	1	10	5	18	1859	2153	124	41	96	Mermaid
5	1	1	10	5	19	1985	2153	87	41	96	Park.
4	1	1	10	6	0	645	2197	894	27	-1	
5	1	1	10	6	1	630	2193	67	42	96	The
5	1	1	10	6	2	697	2193	109	42	96	estate
5	1	1	10	6	3	805	2193	92	42	96	looks
5	1	1	10	6	4	896	2193	60	42	96	run
5	1	1	10	6	5	959	2193	81	42	95	down
5	1	1	10	6	6	1040	2193	74	42	96	with
5	1	1	10	6	7	1113	2193	57	42	96	the
5	1	1	10	6	8	1173	2193	88	42	96	water
5	1	1	10	6	9	1260	2193	116	42	96	feature
5	1	1	10	6	10	1376	2193	98	42	96	turned
5	1	1	10	6	11	1474	2193	63	42	95	off.
3	1	1	11	0	0	420	2233	1677	36	-1	
4	1	1	11	1	0	420	2233	1677	36	-1	
5	1	1	11	1	1	411	2229	28	53	55	|
5	1	1	11	1	2	438	2229	177	53	54	2309/2020
5	1	1	11	1	3	614	2229	28	53	55	|
5	1	1	11	1	4	641	2229	49	53	24	Ni
3	1	1	12	0	0	440	2401	1616	148	-1	
4	1	1	12	1	0	440	2401	1496	32	-1	
5	1	1	12	1	1	440	2401	170	26	73	2309/2020
5	1	1	12	1	2	606	2397	27	40	93	|
5	1	1	12	1	3	646	2407	11	11	32	*
5	1	1	12	1	4	656	2397	33	40	65	if
5	1	1	12	1	5	696	2397	54	40	96	the
5	1	1	12	1	6	751	2397	126	40	96	Tourism
5	1	1	12	1	7	876	2397	71	40	95	and
5	1	1	12	1	8	946	2397	154	40	95	Economic
5	1	1	12	1	9	1099	2397	81	40	96	Levy
5	1	1	12	1	10	1179	2397	74	40	96	were
5	1	1	12	1	11	1256	2397	121	40	95	utilised
5	1	1	12	1	12	1379	2397	38	40	96	to
5	1	1	12	1	13	1422	2397	88	40	96	cover
5	1	1	12	1	14	1512	2397	54	40	96	the
5	1	1	12	1	15	1569	2397	194	40	96	maintenance
5	1	1	12	1	16	1762	2397	88	40	96	costs
5	1	1	12	1	17	1849	2397	41	40	96	of
5	1	1	12	1	18	1892	2397	44	40	96	all
4	1	1	12	2	0	646	2441	1410	33	-1	
5	1	1	12	2	1	631	2437	155	41	96	ceremony
5	1	1	12	2	2	788	2437	83	41	96	sites
5	1	1	12	2	3	870	2437	40	41	96	in
5	1	1	12	2	4	915	2437	55	41	96	the
5	1	1	12	2	5	973	2437	100	41	95	Noosa
5	1	1	12	2	6	1072	2437	98	41	96	Shire,
5	1	1	12	2	7	1178	2437	59	41	96	and
5	1	1	12	2	8	1239	2437	56	41	96	the
5	1	1	12	2	9	1298	2437	100	41	93	permit
5	1	1	12	2	10	1397	2437	72	41	95	fees
5	1	1	12	2	11	1472	2437	59	41	95	for
5	1	1	12	2	12	1530	2437	172	41	95	ceremonies
5	1	1	12	2	13	1715	2437	34	41	95	in
5	1	1	12	2	14	1749	2437	100	41	95	Noosa
5	1	1	12	2	15	1848	2437	83	41	96	were
5	1	1	12	2	16	1930	2437	130	41	95	brought
4	1	1	12	3	0	646	2479	1391	32	-1	
5	1	1	12	3	1	646	2479	20	26	96	in
5	1	1	12	3	2	672	2475	64	40	96	line
5	1	1	12	3	3	735	2475	71	40	96	with
5	1	1	12	3	4	808	2475	61	40	96	the
5	1	1	12	3	5	868	2475	145	40	95	Sunshine
5	1	1	12	3	6	1012	2475	107	40	95	Coast,
5	1	1	12	3	7	1118	2475	38	40	96	or
5	1	1	12	3	8	1155	2475	81	40	96	less,
5	1	1	12	3	9	1235	2475	68	40	96	this
5	1	1	12	3	10	1302	2475	64	40	96	will
5	1	1	12	3	11	1365	2475	81	40	95	bring
5	1	1	12	3	12	1448	2475	91	40	96	great
5	1	1	12	3	13	1538	2475	144	40	95	economic
5	1	1	12	3	14	1682	2475	117	40	96	benefit
5	1	1	12	3	15	1802	2475	40	40	95	to
5	1	1	12	3	16	1842	2475	44	40	97	my
5	1	1	12	3	17	1888	2475	149	40	95	business,
4	1	1	12	4	0	646	2516	975	33	-1	
5	1	1	12	4	1	635	2512	59	41	96	and
5	1	1	12	4	2	693	2512	42	41	96	to
5	1	1	12	4	3	734	2512	55	41	88	all
5	1	1	12	4	4	788	2512	56	41	96	the
5	1	1	12	4	5	847	2512	120	41	96	wedding
5	1	1	12	4	6	973	2512	134	41	95	industry
5	1	1	12	4	7	1110	2512	59	41	96	and
5	1	1	12	4	8	1168	2512	124	41	96	tourism
5	1	1	12	4	9	1291	2512	171	41	96	businesses
5	1	1	12	4	10	1465	2512	40	41	95	in
5	1	1	12	4	11	1513	2512	107	41	96	Noosa.
3	1	1	13	0	0	644	2557	1599	802	-1	
4	1	1	13	1	0	646	2557	1427	33	-1	
5	1	1	13	1	1	646	2563	12	11	91	*
5	1	1	13	1	2	665	2553	172	41	93	Undercover
5	1	1	13	1	3	843	2553	315	41	87	options/Multipurpose
5	1	1	13	1	4	1173	2557	13	26	87	/
5	1	1	13	1	5	1188	2553	128	41	96	wedding
5	1	1	13	1	6	1318	2553	110	41	93	chapel
5	1	1	13	1	7	1437	2573	19	4	90	—
5	1	1	13	1	8	1466	2557	17	26	95	A
5	1	1	13	1	9	1485	2553	90	41	95	large
5	1	1	13	1	10	1578	2553	62	41	96	and
5	1	1	13	1	11	1639	2553	139	41	96	beautiful
5	1	1	13	1	12	1786	2553	168	41	96	undercover
5	1	1	13	1	13	1957	2553	73	41	95	area
5	1	1	13	1	14	2032	2553	41	41	95	at
4	1	1	13	2	0	647	2595	1407	32	-1	
5	1	1	13	2	1	629	2591	115	40	95	Noosa
5	1	1	13	2	2	753	2591	115	40	95	Woods,
5	1	1	13	2	3	869	2591	124	40	95	Chaplin
5	1	1	13	2	4	996	2591	86	40	95	Park,
5	1	1	13	2	5	1089	2591	61	40	96	and
5	1	1	13	2	6	1153	2591	60	40	96	the
5	1	1	13	2	7	1213	2591	101	40	96	Noosa
5	1	1	13	2	8	1313	2591	123	40	96	Botanic
5	1	1	13	2	9	1443	2591	127	40	96	Gardens
5	1	1	13	2	10	1573	2591	94	40	96	would
5	1	1	13	2	11	1669	2591	84	40	96	bring
5	1	1	13	2	12	1756	2591	114	40	96	quality
5	1	1	13	2	13	1873	2591	137	40	96	weddings
5	1	1	13	2	14	2013	2591	41	40	96	to
4	1	1	13	3	0	644	2635	273	33	-1	
5	1	1	13	3	1	633	2631	61	42	95	the
5	1	1	13	3	2	696	2631	105	42	96	Noosa
5	1	1	13	3	3	801	2631	119	42	96	Region
4	1	1	13	4	0	646	2673	1212	26	-1	
5	1	1	13	4	1	646	2679	12	11	92	*
5	1	1	13	4	2	668	2673	84	26	96	Funding
5	1	1	13	4	3	789	2674	40	25	96	to
5	1	1	13	4	4	835	2668	122	42	95	Tourism
5	1	1	13	4	5	964	2668	105	42	96	Noosa
5	1	1	13	4	6	1075	2668	47	42	95	to
5	1	1	13	4	7	1114	2673	221	26	96	SUPPORT
5	1	1	13	4	8	1265	2668	70	42	96	the
5	1	1	13	4	9	1375	2683	43	11	96	wedding
5	1	1	13	4	10	1457	2673	79	26	96	and
5	1	1	13	4	11	1571	2683	126	11	95	honeymoon
5	1	1	13	4	12	1732	2673	126	26	95	industry.
4	1	1	13	5	0	1914	2873	87	29	-1	
5	1	1	13	5	1	1914	2873	87	29	89	Page
5	1	1	13	5	2	1977	2869	20	37	88	9
4	1	1	13	6	0	1954	3315	289	44	-1	
5	1	1	13	6	1	1954	3315	105	44	95	Page
5	1	1	13	6	2	2074	3316	49	34	95	56
5	1	1	13	6	3	2114	3311	66	52	95	of
5	1	1	13	6	4	2194	3316	49	34	96	84

Section 57

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 57 of 84

GENERAL COMMITTEE MEETING AGENDA                                                      12 OCTOBER 2020

                    Parks, roads, and the wedding industry needs support in Noosa.
                    Weddings bring in a substantial income to businesses here.
                    More public transport not big buses ,more efficient small one.more andicap parking . payment
                    for car pe

                    Long term planning to facilitate the growing population e.g. more public transport/biking
                    facilitation to reduce car traffic while also protecting the environment
         24/09/2020 | Increasing Council's environmental health services with a pro-active program to continue keep
                    Noosa Covid -19 safe as people in retail shops, restaurants, cafes and public spaces are
                    getting slack in social distancing and hygiene, including proactively asssisting eatenes, and
                     establishments with knowedge. We could be the best Council in this!

                    touches   many residents and delivers benefits in so many ways; social & economic.

         25/09/2020 | buy more land for preservation
                    Street lighting
                    more footpath
                    All bike lanes linked
                    Clean up boats on the River
                    More colorful plants and trees on Council land and Roundabouts and bndges. More Colour,
                    More powerful BBQ's on Gympie Tce
                     Parking
                     Free Fun Busses or Tuk Tuks
                     Buskers
                    Musik in the Parks - Covid safe
                    Tra Spo to the SCU  ospita
         26/09/2020 | If council is serious about recycling the dump fees should be reduced or all residents whether
                    they be owners or rentals, given dump vouchers. Kerbside clean up should be a must. Plus the
                     Recycle bins should be emptied weekly not fortnightly, especially around Christmas time.

                    let's weed like lantana and tobacco flourish. Disgrace for an ecologically minded council.
         26/09/2020 | * Reduce the wedding permit fees
                     * Direct dollars from Tourism and Economic Levy to cover any costs not recovered from
                    minimal wedding permit fees, for the maintenance of all ceremony sites in the Noosa Shire. If
                    permit fees for ceremonies in Noosa were brought in line (or less than) with other Shires across
                    Queensiand this will bring great economic benefit to our small businesses, and to all the
                    wedding industry and tourism businesses in Noosa.
                     * STOP permit fees on our open beaches — no maintenance is required on the beaches.
                    Maximum number of guests can be a part of the permit. Free beach permits for Sunshine
                    Beach to Peregian Beach — this would encourage couples to marry outside of the Hastings
                    Street Precinct, yet keep the dollars supporting our economy.
                     * Develop and Build Undercover options/Multipurpose / wedding chapel — A large and beautiful
                    undercover area at Noosa Woods, Chaplin Park, and the Noosa Botanic Gardens would bring
                    quality weddings to the Noosa Region. These would soon pay for themselves.
                     * Funding to Tourism Noosa to SUPPORT the wedding and honeymoon industry.
                     * CONSULTATION with the Noosa Wedding Organisation when decisions impacting the
                    Wedding Industry in Noosa are being made.
                     IN SUPPORT
                    PRE COVID: 1 x wedding to the Noosa region brings an AVERAGE spend of $96,000 to our
                    Noosa Economy, shared across a number of businesses.
                     * The average cost of a wedding in Australia today is $36,000
                     * The average number of guests at a wedding is 60
                     * As a Destination Wedding location, guests spend a minimum of 1 night in Noosa, and up to a
                   week. Conservative     spend per quest $1000 pp

                                                                                        Page 10

                                                                                            Page 57 of 84

Section 58

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 58 of 84

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020

                   * $36,000 + quest spend $60,000 = $96,000
                   HOW GUESTS AND COUPLES ENJOY THEIR DESTINATION WEDDING WEEK:
                   PRE-WEDDING: ACCOMMODATION; RESTAURANTS, CAFE'S, SPAS, GOLF, TOURS AND
                   ADVENTURES
                   WEDDING DAY: FLORISTS; STYLISTS; CELEBRANTS; HAIRDRESSERS; MAKEUP
                   ARTISTS; PHOTOGRAPHERS, VIDEOGRAPHERS; CAKE MAKERS; CATERERS, MOBILE
                   BARS; DRESS MAKERS; VENUES; TRANSPORT BY ROAD; TRANSPORT BY WATER;
                  POST WEDDING: GOLF CLUBS; FISHING CHARTERS; TOURS & ADVENTURES &
                   BOUTIQUES.
                  Weddings to Noosa have been in steady decline since the fee increases for Wedding permits
                  began back in 2014, and funding to Tourism Noosa in support of the Wedding Industry was
                   redirected to other areas.
                  Weddings fill the gaps, mid-week, between festivals, and out of school holiday timeframes.
                  By reducing the fees, we increase the number of weddings — including our many mid-week
                  destination weddings, and our businesses and economy thrive.
                   COUNCIL FIGURES SHOW
                  Wedding Permits issued by council in 2016 436
                  Wedding Permits issued by council in 2019 353
                   436 — 353 = 83 Less Pernits Issued
                   STATISTICS FROM THE QUEENSLAND REGISTRY OF BIRTHS DEATHS AND
                  MARRIAGES SUBURB BY SUBURB —
                  show that in 2014 there were 826 weddings across the Noosa Shire, 2016 there were 714
                  weddings across the Noosa Shire, and in 2019 there were 640 weddings across the Noosa
                   Shire. These statistics are available by public search.
                  This amounts to 186 LESS weddings =
                   186 x $96000 = $17,865,000 per year, less to our economy.
                   COVID IMPACT
                  Wedding bookings for 2020 and through 2021 are showing a reduced number of wedding
                   guests. Our economy and small businesses would be greatly assisted by a reduction of all
                  wedding permit fees. The non- refundable aspect of wedding permit fees should it rain/ be
                  windy etc., is extremely off-putting to couples with a small wedding budget — which many now
                   have.
                   THIS SUBMISSION IS SUPPORTED BY THE 71 MEMBERSHIP INDIVIDUALS OF THE
                   NOOSA WEDDING ORGANISATION:
                  Leah Cohen
                  Business Owner at Leah Cohen Photography & Super Simple Noosa Elopements
                  Jacqueline Gray
                   Owner-operator Noosa Heads Celebrant
                  Jo-Jo Oechs!
                   Owner-operator at Naturelle Floral Design
                  Debbie White
                   Owner-operator Beauty on the Move Hair and Makeup for brides
                  Lindy Yewen
                   Photographer at Lindy Photography
                  Ange Purchase
                   Entrepreneur at Photo Finish Makeup
                   Carly Doran
                   Owner-operator at Noosa Hairdressers
                   Lyndy Lou
                   Owner-operator Classic Cars Sunshine Coast

                                                                                  Page 11

                                                                                     Page 58 of 84

Section 59

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 59 of 84

GENERAL COMMITTEE MEETING AGENDA                                                12 OCTOBER 2020

                   Jaya Mc Intyre
                  Business Owner and Photographer at Empire Art Photography
                  Alan Hughes
                   Owner-operator at Alan Hughes Photography
                   Vicki Nelis
                   Owner-operator Silk Hair and Makeup
                   Kath Tilly
                  Wedding Celebrant at Kath Tilly Wedding Celebrant
                  Marion Jonkers
                   Photographer at Marion Jonkers Photography
                  Rachel Cutler
                   Owner/Photographer/Multimedia. at Tawny Photography and Film
                  Deb Court
                   Functions Manager at Sunshine Beach Surf Club
                   Francesca Ellul
                  Owner - Operator Heart 2 Soul Ceremonies
                  Lee Burgess
                   Owner/Photographer at Life and Love Photography
                  Rachelle Manian
                  Owner — operator Simply Style Co.
                   Dave Gleeson
                   Owner/Photographer at SurfShots Noosa Photography
                  Philippa Holness
                   Civil Mariage Celebrant
                  Melanie McNiven
                   Owner-operator at Melanie McNiven Portraits
                  Patrick Herron
                   Owner-Operator ‘Birti The Bentley’
                   Tahlia Spencer
                   Marketing at Bella Casa Noosa
                   Glenda McCallum
                  Owner at Noosa VIP Limousines
                  Mia Daskalu-Johnson
                  Business Owner at Spoon fed Catering
                  Lucia Santiago
                   Founder at The Four Elements
                  Shannara Goddard
                  Marketing Communications Manager at Miss Moneypenny’s Noosa
                  Karen Buckle
                   Owner-operator Karen Buckle Photography
                  Chris Lee
                   Owner-Operator at Noosa Photo Booths

                                                                                   Page 12

                                                                                      Page 59 of 84

Section 60

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 60 of 84

GENERAL COMMITTEE MEETING AGENDA                                                   12 OCTOBER 2020

                   Marie Hayes
                   Pastoral Care / Marriage Celebrant

                    June Copeman
                   Marriage Celebrant
                    Lyn Bayfield
                   Owner-Operator Eumundi Roses
                   Alison Mills
                   Marriage Celebrant
                    Fran Fox Marriage Celebrant
                   Marriage Celebrant
                   Michelle Lucas
                    Owner-operator Noosa Wedding & Events
                   Danni Martin
                   Owner-operator Wedding Planner Elopements Noosa
                   Nicole Hopkins
                   Owner-Operator Splash Events — Wedding & Event stylists
                   Rianna Schuh
                   Owner-operator Rhianna Schuh Makeup
                   Abbey Feutnill
                    Employee — Accom Noosa
                   Jeanie Hunter
                   Owner-operator Lipstick Lane (Rene St., Noosaville)
                   Jackie Hellwig
                    Functions Manager Noosa Springs Golf & Spa Resort
                    Cassie McDonald
                    Functions Manager — Noosa Waterfront Restaurant
                    Charles Nowak
                   Owner-Operator Nowak Migration
                   Melinda Gannon
                    Owner-operator First Class Functions
                   Nicole Laufer
                   Owner-operator Nicole Laufer Photography
                    Trudy Croad
                   Owner-operator Lovebird Weddings (Stylists & Planners)
                   Sharen Hynd
                    Owner-operator Noosa North Shore Weddings
                    Benjamin Freudenmann
                    Owner-operator AOV Films, Noosa.
                   Jodie Modric
                   Owner-operator Jodie Modric Photography

                                                                                      Page 13

                                                                                         Page 60 of 84

Section 61

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 61 of 84

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020

                  David Clark
                  Owner -operator In The Booth (Photobooth)
                   Cooper Brady
                   Owner-operator Cooper Brady Photography
                  Shannara Goddard
                  Marketing Manager Miss Moneypennys Noosa
                  Jacinta Owens
                  Owner Operator Jacfit (Fitness)
                  Ashlee Jensen
                   Owner-operator Jensen & Young film
                  Brooke Duley
                  Owner-operator Sandpiper Photography
                  Sally Dolman
                   Marketing Manager — Spoon Fed Catering
                  Jay Flood
                   Owner-operator Noosa Style Ceremonies
                  Graeme Passmore
                   Owner-Operator Graeme Passmore Photography
                   Kym Sweet
                  Owner-operator Glamacamp Noosa
                  Zoe Worth
                   Owner-operator Worth Photography
                  Ellie Sparks
                   Owner-operator Sunshine Weddings (Stylist)
                  Adam Johnson
                   Owner-operator Marry Me Adam (Celebrant)
                  Susanne Wood
                  On site Manager Sunset Cove Resort Noosaville
                  Erin Clare
                   Owner/operator/designer Enn Clare Bridal, Noosa
                  Katey Thew-Thin
                  Owner! cake designer and creator - Buttercups Cup Cakes, Cooroy
                  Mary-Ellen Odijk
                   Owner-Operator With Style Weddings & Events
                  Greg Doney
                  Greg Doney Music
                  David Stielow
                  Noosa Ferry & Cruise Company
                  Glenda McCallum
                   Noosa VIP Limousines
                  Jennifer Tumer
                  Deluxe Kombi Service

                                                                                  Page 14

                                                                                     Page 61 of 84

Section 62

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 62 of 84

GENERAL COMMITTEE MEETING AGENDA                                                      12 OCTOBER 2020

                    Tracey & Roger
                    FJ Indulgence Wedding Cars

         27/09/2020 | Introduce more user
5	1	1	2	1	6	962	577	90	41	81	pays to support the budget revenue. E.g. Apart from paid visitor parking
                    with a ticket issued at boom gate on entry to car parks - first three hours free with a stamp from
                    a local business on heir ticket - also introduce he need for paid Parking permits for permanent
                    residents. Any ongoing kerbside parking is queried. All properties need to provide on site
                    vehicle parking. If not all vehicles can be accommodated within the property, a 3/6/9/12 month
                    permit is bought from Council and placed on windscreen. This will increase NSC revenue and
                    assist in reducing congestion in narrow streets such as on Noosa Hill - see Attunga Heights -
                    and will also reduce the use of enclosed garages being used as habitable space. It won't be
                    popular with all; however, with a diminishing rate base, all should contribute.
         27/09/2020 | council needs to recognise our economy has to diversify. as such ratepayers who are not
                    related to toursim directly should have the option to direct the levy for tourism directly to
                   economic development. its nght the ratepayer decides how they best meet their social
                    obligation to invest in this economy rather than council. Economic development desperately
                    needs    funding.
         27/09/2020 | Toilets- abysmal toilet facilities for a supposed tourist hot
5	1	1	4	1	12	1509	1124	89	41	88	spot. Toilets are old, poorly
                    maintained & seldom cleaned. Also not enough toilets. Mt. Cooroora attracts many, inc. King Of
                    Mt. No toilets- bush is full of waste. Plumbing is there- water/sewage line. Just needs Council to
                    act.
         27/09/2020 | For the foreseeable future, until there is more clarity about impacts of Covid 19, Council say
                    thanks, but no thanks to any State Govemment grants or gifts (eg. from developers) that mean
                    the need for on going expenditure from Council budget to maintain the infrastructure. An
                    example, is the State Govememnt grant for the kids playground in Cooroy. Graciously, decline
                    it. The world has changed since NSC was given this grant. Unfortunate timing as in today's
                   world, ratepayers/Council do not need further maintenance expenses coming from installing
                   this playground at this time. The Qid state government most likely would welcome the return of
                   the money for better use elsewhere. During the GFC many developers across the greater
                    Sunshine Coast region were gifting parks, lakes, retaining walls to SCRC. They shifted the on
                    going maintenance burden from themselves to Council. From now, NSC needs to say no to
                    everything that potentially means further unnecassary expenditure. Let's work at maintaining
                    infrastructure we already have before taken on more expenses. Thanks.
         27/09/2020 | Support for the wedding industry , who provide over $65,000,000 of revenue annually to the
                   Noosa area.
                   Reducing wedding site fees to be inline with other shires wedding sites. To spend on
                    maintaining those sites. To build an all weather wedding chapel in Noosa woods. To spend on
                    Promotion to grow the wedding industry to be the premier wedding destination in Australia. To
                    make the Noosa Wedding Organisation a stake holder in decisions affecting the wedding
                    industry .
         27/09/2020 | Better equipped playgrounds and parks that refiect age group for that area.Noosa Heads and
                   Noosa Junction prime examples These areas too expensive for very young families and yet
                    swings and slides have been upgraded as in A.W.Dan Admiral from a safety view as
                    over20years old but a drive along Leslie Drive on school moming will see every secondary
                    school represented! These kids want half basketball courts and skate parks ,not swings and
                    slides!No more sharing playgrounds with dogs off leash.Too dangerous and stop kids doing
                      eait outdoor p S its.
         27/09/2020 | The Hinterland.
                   The hinteriand is being impacted by large scale development and population increase. Prepare
                    for the impact before the problems arse. The hinterland roads are inadequate for the increase
                    in traffic flow especially the dirt roads. | could go on but | wont bore you.

         27/09/2020 | Creating some outdoor pavilions that the community can use on a pay per use basis. They
                    could be used for weddings, jazz festivals, art exhibitions. Suggested locations Noosa Woods,
                   Noosa Botanical gardens.
                    Also like Council to ensure maintenance on the wedding Groves. They are not well maintained
                     despite the high fees paid by couples to use them for wedding ceremonies.

                                                                                         Page 15

                                                                                             Page 62 of 84

Section 63

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020




                                       Page 63 of 84

GENERAL COMMITTEE MEETING AGENDA                                                      12 OCTOBER 2020

         28/09/2020 | Improvements to the Noosa Foreshore. Substantial improvements are needed to bring this
                   area up to the standard the community and visitors deserve. The Noosaville Foreshore Land
                    Use Master Plan developed in 2017-18 was a good start and identified some improvements
                   desired by the community, but there is so much more that could be done. This could be a worid
                    class area if it was made a focus of Council over the next few years. As well as making it more
                    attractive for locals and the community, it would also attract some visitor attention away from
                   Hastings Street, easing some of the traffic and parking issues there. In the short term, areas of
                   the lawns and grass need replacing, new and better facilities are required (toilets, BBQ shelters
                    etc), and better lighting needs to be installed.
                    eee                                  eee
         28/09/2020 | Environmental and ecosystem protection so that future locals and tourists keep enjoying the
                    natural attributes of the area. Free public transport including possible ‘fun’ transport ideas in
                   that tows tounsts from one end of Hastings St to the spit etc. adding an element of toursty fun
                   as well as lowering     congestion.

                                                                                        Page 16

                                                                                            Page 63 of 84

Section 64

GENERAL COMMITTEE MEETING AGENDA                                                  12 OCTOBER 2020


   8         FINANCIAL PERFORMANCE REPORT – SEPTEMBER 2020

   Author             Manager Financial Services, Trent Grauf
                      Corporate Services Department

   Index              ECM/ Subject/ 22.09 – Monthly Financial Performance Report

   Attachments        1.       Statement of Income and Expenditure (Profit & Loss and
                               Capital)
                      2.       Statement of Financial Position
                      3.       Statement of Cash Flows
                      4.       Summary of Materials and Services Expenditure

   EXECUTIVE SUMMARY
   Year to date (YTD) operating performance against current budget as at 30 September 2020
   is positive, with operating revenues performing above forecast due to Council facilities sales
   revenue outperforming COVID-19 budget assumptions.

    YTD Financial Performance Summary
                                   Budget     Actual      Variance          Variance        Status
                                      $m         $m            $m                 %
    Operating Revenue               $39.8      $41.6              $1.8         4.5%        On Track
    Operating Expense               $24.1      $23.7              $0.4         1.6%        On Track
    Operating Position              $15.7      $17.9              $2.2        14.0%
    Capital Revenue                  $3.2       $3.3              $0.0         1.0%        On Track
    Capital Expenditure              $9.2       $7.9              $1.3        14.1%      Below Budget

   Financial statements including Statement of Income & Expenditure, Statement of Financial
   Position (balance sheet), and Statement of Cash Flows are included as attachments for
   information for Council.

   Figure 1: Actual Performance Compared to Budget

       $45
                                      $41.6    YTD Budget ($m)
                           $39.8
       $40                                     YTD Actual ($m)
       $35
       $30
                                                                    $24.1      $23.7
       $25
       $20
       $15

       $10

       $5
        $-
                      Operating Revenue                          Operating Expenditure

   Council’s performance against key measures of financial sustainability have been calculated
   as at September 2020. These indicators enable the reader to assess Council’s success in

                                                                                          Page 64 of 84

Section 65

GENERAL COMMITTEE MEETING AGENDA                                                       12 OCTOBER 2020


   managing its budget, cash and debt as well as undertaking sustainable asset management.
   The table below contains a snapshot of a number of key measures, with full detail included
   in the report.

    YTD Measures of Financial Sustainability
                                         Target          Current     Actual YTD
                                                         Budget
    Operating Surplus Ratio            0-10%             -2.3%          43.1%           On Track
    Net Financial Liabilities Ratio     <60%             -6.3%         -48.7%           On Track
    Cash Cover Ratio                  3 months     6.6 months        11.1 months        On Track
    Asset Sustainability Ratio         > 90%         101.5%             28.5%           On Track


   RECOMMENDATION
   That Council note the report by the Manager Financial Services to the General Committee
   Meeting dated 12 October 2020 outlining September 2020 year to date financial performance
   against budget, including performance against key financial sustainability indicators.

   REPORT
   Operating Revenue (YTD Benchmark 25.0%)
   Council has received 43% ($41.6 million) of its operating revenue budget ($96.6 million).
   Commentary on each revenue category is provided below.

      Category               Summary                             Comments
      Rates and              $34.5 million (50%) of the         Waste utility charges $376k above YTD
      Levies                 annual budget of $68.4              budget (53% or $6.5 million of $12.3 million
                             million has been earned             budget earned), due to recovery of
                                                                 commercial collection services previously
                                                                 impacted by the COVID-19 pandemic
      Fees and               $2.1 million (31%) of the          Plumbing application fees $65k above YTD
      Charges                $6.6 million annual budget          budget (33% or $332k of $1.0 million
                             has been earned                     budget earned)
                                                                Building application fees $56k above YTD
                                                                 budget (32% or $214k of $667k budget
                                                                 earned)
      Sale of Goods          $2.5 million (34%) of the          Holiday Park sales $481k above YTD
      and Services           $7.3 million budget has             budget (54% or $892k of $1.6 million
                             been received                       budget earned) –Parks have reopened
                                                                 earlier than forecast following COVID-19
                                                                 pandemic closures. Positive revenue
                                                                 variances will be partially offset by
                                                                 additional variable operating costs
                                                                Community Facilities (NAC, NLC and The
                                                                 J) $447k above YTD budget (31% or $457k
                                                                 of $1.5 million budget earned) – Facilities
                                                                 have reopened earlier than forecast
                                                                 following COVID-19 pandemic closures.
                                                                 Positive revenue variances will also be
                                                                 partially offset by additional variable
                                                                 operating costs
                                                                Waste management sale of recoverable
                                                                 materials $30k below YTD budget (27% or
                                                                 $1.1 million of $4.0 million budget earned)


                                                                                             Page 65 of 84

Section 66

GENERAL COMMITTEE MEETING AGENDA                                                                         12 OCTOBER 2020


      Category           Summary                                          Comments
      Interest           $196k (23%) of the $870k                        Interest revenues on cash invested will
      Received           annual budget has been                           need ongoing monitoring given potential
                         earned                                           further interest rate cuts and impacts on
                                                                          term deposit / cash fund rates
      Unitywater         On track                                         Nil
      Dividend and
      Tax
      Other Revenue      $513k (26%) of the $2.0                         Recoupment of Unitywater charges from
                         million budget has been                          lessees $26k above YTD budget - offset by
                         earned                                           additional utility charge expenses
      Operating          $1.6 million (27%) of the                       Disaster resilience and recovery grant of
      Grants,            $5.8 million budget has                          $152k received for 2019 fire events (not
      Subsidies          been received                                    budged)
                                                                         50% ($1.2 million) of the financial
                                                                          assistance grant was prepaid in May 2020
                                                                          and may impact on Council’s 2020/21 final
                                                                          operating position if the prepayment
                                                                          approach is discontinued by the Australian
                                                                          government
                                                                         All operating grants are in line with budget
                                                                          expectations at this stage
      Unitywater         On track                                        Unitywater distributions are fixed each year
      Distributions                                                       so there is little budget variance risk
                                                                         Unitywater have advised that distributions
                                                                          will not change due to any COVID-19
                                                                          impacts on its financial position

   Figure 2: Operating Revenue Position by Type (Excluding Rates)

     $3.0
                                                    $2.5
     $2.5                                                                          YTD Budget ($m)
            $2.0 $2.1
                                                                                   YTD Actual ($m)
     $2.0
                                             $1.5                                                     $1.6
     $1.5                                                                                  $1.3


     $1.0

     $0.5                             $0.2                 $0.3 $0.3                                         $0.3 $0.3
                        $0.2                                                        $0.2
                                                                           $0.1
     $0.0
                                                                                  Other
              Charges




                                                            Income




                                                                                             Grants
                                              Goods &




                                                                                                               Unitywater
                                              Services
                                              Sales of




                                                             Rental
                           Interest
              Fees &




                                                                                                                Share of




   Operating Expenditure (YTD Benchmark 25.0%)

   Actual operating expenditure is currently 24% ($23.7 million) of full year budget ($98.8
   million). Detailed commentary for each expenditure category is provided below.




                                                                                                                Page 66 of 84

Section 67

GENERAL COMMITTEE MEETING AGENDA                                                                   12 OCTOBER 2020


   Category       Summary                        Comments
   Employee       $7.6 million (22%) of the                         Under expenditure for permanent staff salaries
   Costs          annual budget of $34.8                             and wages ($757k) partially offset by additional
                  million has been expended                          spend on casual staff and external labour hire
                                                                     ($257k)
   Materials      $10.9 million (25%) of the                        Fleet operations $103k below YTD budget (23%
   and            $43.3 million annual budget                        or $311k of $1.4 million budget spent) – fuel
   Services       has been expended.                                 costs and timing of plant / vehicle servicing and
                                                                     reactive maintenance
                                                                    Commercial properties $75k below YTD budget
                                                                     (22% or $54k of $245k budget spent) – timing
                                                                     of maintenance works
                                                                    Works operations $87k above YTD budget
                                                                     (18% or $585k of $3.3 million budget spent) –
                                                                     sealed and gravel road maintenance works
                                                                    Holiday parks $102k above YTD budget (36%
                                                                     or $306k of $861k budget spent) – operating
                                                                     costs from parks reopening earlier than
                                                                     budgeted following COVID-19 pandemic related
                                                                     closures - offset by additional revenues.
   Finance        On track                       Nil
   Costs
   Depreciation   On track                       Nil
   Other          On track                       Nil
   Expenses

   Figure 3: Operating Expenditure Position by Type

    $12.0                     $11.1 $10.9

    $10.0                                                              YTD Budget ($m)
               $7.9 $7.6                                               YTD Actual ($m)
     $8.0

     $6.0
                                                                                 $4.7 $4.7

     $4.0

     $2.0
                                                $0.3 $0.4                                           $0.1 $0.1
     $0.0
                                                     Finance Costs
                                  Materials




                                                                                    Depreciation
                  Employees




                                                                                                       Other




   Capital Revenue
   YTD capital revenue of $3.3 million received comprises cash contributions from developers
   ($249k) and capital grants ($3.0 million). Note that the timing of capital grant receipts are
   generally dependent on the timing of grant conditions and also capital delivery performance,
   and that the timing of the receipt of developer contributions (both cash and contributed) is
   unpredictable.




                                                                                                       Page 67 of 84

Section 68

GENERAL COMMITTEE MEETING AGENDA                                                           12 OCTOBER 2020


   Figure 4: Capital Revenue by Type

     $3.5
                                                $3.0               $3.0
     $3.0
                                                                          YTD Budget ($m)
     $2.5                                                                 YTD Actual ($m)

     $2.0

     $1.5

     $1.0

     $0.5         $0.2                   $0.2
                                                                               $-                   $-
     $0.0
                         Contributions




                                                       Subsidies




                                                                                     Contributed
                                                        Grants /




                                                                                       Assets
                            Cash




   Capital Program
   Actual capital expenditure (excluding commitments) is $7.9 million (YTD budget $9.2 million).
   Detailed discussion of progress in the delivery of the capital works program is provided
   through a separate report by the Asset Planning Manager.

   Figure 5: Capital Program Delivery Performance

    $8.0

    $7.0          $6.7
                                                   YTD Budget ($m)
    $6.0                                 $5.5      YTD Actual ($m)

    $5.0

    $4.0

    $3.0
                                                                              $1.9                 $1.9
    $2.0

    $1.0                                        $0.6               $0.5

    $0.0
                 Capital works                  Other capital                Loan redemption




   Cash Management and Investment Performance
   Total cash on hand at the end of September was $72 million. Included in this balance are
   funds held in trust and for restricted purposes (e.g. unexpended levy and grant funds),
   prepaid grants including the financial assistance grant and other capital works grants, the
   July rates payments as well as any other monies committed for funding capital projects which
   are underway and will continue during the financial year.

   The following pie charts present the mix of cash held at September 2020 by agency (graph
   on the left) and by credit risk rating (graph on the right). All funds have been invested in
   accordance with the Investment Policy and in consideration of the principles of ethical
   investment, preservation of capital, return on investment and counterparty thresholds.

                                                                                                          Page 68 of 84

Section 69

GENERAL COMMITTEE MEETING AGENDA                                                                       12 OCTOBER 2020



   Figure 6: Closing Cash Held by Agency and Credit Rating



                                                                                         A1 +
                          CBA
                                                                                     (CBA + NAB +
                          6%
                                                                                       Wpac)…




                                                                                                A1 +
                                QTC                                                            (QTC)
                                94%                                                             94%




   The following chart monitors the year-to-date trend on total cash and the agencies invested.
   The bi-annual issue of rates and levies which occurred in July has increased cash balances
   up to the end of September due to the extended 60-day payment terms adopted for the
   2020/21 budget.

   Figure 7: 12 Month Trend of Cash Invested by Agency
     90,000,000


     80,000,000


     70,000,000


     60,000,000


     50,000,000


     40,000,000


     30,000,000


     20,000,000


     10,000,000


             -
                 Oct-19    Nov-19   Dec-19   Jan-20   Feb-20   Mar-20   Apr-20   May-20   Jun-20   Jul-20   Aug-20     Sep-20


                  Bendigo TD          Westpac TD        NAB TD          Suncorp TD        CBA TD       QTC           CBA Operating




                                                                                                              Page 69 of 84

Section 70

GENERAL COMMITTEE MEETING AGENDA                                               12 OCTOBER 2020


   Borrowings
   Following the announcement by the State Government that councils have the option to
   refinance its debt to take advantage of a low interest rate environment a debt restructure
   review has been commissioned with the Queensland Treasury Corporation. Once the review
   has been completed a report will be provided to a future Council meeting outlining the
   findings and potentially recommending any actions that provides a positive net benefit to
   ratepayers.
   Measures of Financial Sustainability
   The following table incorporates a set of financial sustainability indicators to further assist in
   managing Council financial performance. There are no current emerging risks regarding
   performance noting the financial year has only just commenced.

    Category                                                              Comments
    Operating Surplus Ratio                                              Intent: Identifies the extent
                                                                          to which revenues cover
                                                                          operational expenses, to
                                                                          ensure community equity is
                                                                          not degraded
                                                                         Target: 0 – 10%
                                                                         Result: 43.1%
                                                                         Comment: The high ratio
                                                                          reflects the levying of rates
                                                                          in July, which is degrading
                                                                          as expenditure occurs on
                                                                          operations through to the
                                                                          next rate run in January
                                                                          2021


    Cash Expense Cover                                                   Intent: Indicates how long
                                                                          Council can continue paying
                                                                          its day-to-day expenses
                                                                          from cash at bank without
                                                                          needing additional cash
                                                                          flows
                                                                         Target: > 3 months
                                                                         Result: 11.1 months
                                                                         Comment: Whilst current
                                                                          cash cover remains above
                                                                          target, business as usual
                                                                          expenditure and any other
                                                                          unforseen financial impacts
                                                                          through to 30 June 2021 will
                                                                          degrade Council’s cash
                                                                          holdings.




                                                                                     Page 70 of 84

Section 71

GENERAL COMMITTEE MEETING AGENDA               12 OCTOBER 2020


    Category                              Comments
    Asset Sustainability Ratio           Intent: Measures the extent
                                          to which assets are being
                                          replaced as their condition
                                          degrades to ensure service
                                          potential is maintained
                                         Target: 90% of depreciation
                                          budget spent on renewals
                                          annually
                                         Result: In line with budget
                                         Comment: The ratio will
                                          progressively increase each
                                          month as expenditure on
                                          renewals occurs.

    Net Financial Liabilities Ratio      Intent: Outlines the level
                                          that net Council debt can be
                                          serviced     by     operating
                                          revenues. A ratio below
                                          zero implies that liabilities
                                          are less than cash (and
                                          other current assets) and
                                          there is adequate borrowing
                                          capacity available if needed.
                                         Target: less than 60%
                                         Result: -48.7%
                                         Comment: Council has low
                                          debt levels and strong cash
                                          holdings. The July rates
                                          revenue and prepayment of
                                          the financial assistance
                                          grant also inflates the YTD
                                          actual outcome
    Investment Return                    Intent: Ensure appropriate
                                          return on investment yield
                                          for cash at bank.
                                         Target:      0.25%      above
                                          current           Bloomberg
                                          commonwealth 10 year
                                          bond rate yield (0.11%)
                                         Result: 0.65%
                                         Comment: Regardless of
                                          the current levels of low long
                                          term bond and interest rates
                                          (due to current economic
                                          conditions),        Council’s
                                          investment      return     still
                                          remains above target




                                                       Page 71 of 84

Section 72

GENERAL COMMITTEE MEETING AGENDA                                                12 OCTOBER 2020


    Category                                                               Comments
    Rates in Arrears                                                      Intent: Ensuring that the
                                                                           amount of unpaid rates
                                                                           remains sustainable and
                                                                           does not negatively impact
                                                                           cash flows
                                                                          Target:     5%      industry
                                                                           benchmark
                                                                          Result: 9.6%
                                                                          Comment: Arrears are at
                                                                           the high point in the cycle
                                                                           with July rates becoming
                                                                           due in September under the
                                                                           extended 60-day payment
                                                                           terms. Reminder notices are
                                                                           being issued in October.
                                                                           The economic impacts on
                                                                           arrears from the COVID-19
                                                                           pandemic ratio will clearer
                                                                           once reminder notices are
                                                                           actioned.

   Previous Council Consideration
   Nil.
   Finance
   As above.
   Risks & Opportunities
   Council’s risk register includes a number of risks that could impact on ongoing financial
   sustainability. Effective budget management and reporting is an important risk mitigation tool.
   Consultation
   External Consultation - Community & Stakeholder
   Nil.
   Internal Consultation
   All areas of Council are consulted as part of the regular monitoring of budget performance.
   Departments/Sections Consulted:

    X     Chief Executive Officer   X   Community Services                      X   Corporate Services
          Executive Officer             Director                                X   Director
          Executive Support             Community Development                   X   Financial Services
                                        Community Facilities                        ICT
                                        Libraries & Galleries                       Procurement & Fleet
                                        Local Laws                                  Property
                                        Waste & Environmental Health                Revenue Services

    X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
          Director                      Director                                    Director
          Community Engagement          Building & Plumbing Services                Asset Management
          Customer Service              Development Assessment                      Buildings and Facilities
          Governance                    Economic Development                        Civil Operations
          People and Culture            Environmental Services                      Disaster Management
                                        Strategic Land Use Planning                 Infrastructure Planning,
                                                                                    Design and Delivery




                                                                                       Page 72 of 84

Section 73

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020


                                       Attachment 1




                                       Page 73 of 84

GENERAL COMMITTEE MEETING AGENDA                                                             12 OCTOBER 2020

                                                                                                    Attachment 1

  Profit and Loss Statement
  Revenue
     Recurrent Revenue
     Rates, levies and charges                      68,388        34,170         #31            361        50%
    Fees and charges                                 6.640          1,980        2,065           75        31%
    Interest received                                 870            153           196            43       23%
     Sale of Goods and major services                7.281          1,500        2.488           968       w%
    Sale of contract and recoverable works              23             -             0             0        1%
     Rental & lease income                            1.197         290            24             14       25%
    Other income                                       ral            a8          209             112      27%
     Grants, subsidies, contributions and donations  5757           1,330         1,562         232        27%
    Unitywater Distributions                         5,650          253           253               -      4%
                                                    96,575        39,782        41,588          1,806      43%
  Expenses
     Recurrent Expenses
    Employee benefits                                4.806         7,906         7.610          206        22%
    Materials and services                          43233          11,083       10.871          223        25%
    Finance costs                                     1538          275           378           (103)      25%
    Depreciation                                     18,963         4.741         4741              -      25%
     Other expenses                                    189           50            72           (29)       42%
                                                    98,789        24,065        23,678           387       24%
Operating Result                                   RYT                          TSS
  Summary of Capital Revenue and Expenditure
  Capital Funding
     Capital cash contributions and infrastructure charges 1,521    240            249              -      16%
     Contributed assets                              2.000             -             -              -      o%
     Capital grants and subsidies                    11.340        2,982         3.015            3        27%
     Cash / revenue                                  19,001        5,054          4621         (1,334)     24%
    New loan borrowings                              3.420             -             -              -      0%
    Other capital revenue                                -             -             -              -      o%
Total CapitalRevenue RAE TBS
  Capital Expenditure
     Contributed assets                              2,000             -             -              -      o%
     Capital works - constructed assets             31,106          6,737         5,483        (1,253)     18%
     Capital works - other capital                    1,762         568           525           (43)       wes
     Loan redemption                                 2414           1,881         1,881            0       78%
    a Copal Ex odie                                      -             -            :             a        0%

                                                                                                    Page 73 of 84

Section 74

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020


                                       Attachment 2




                                       Page 74 of 84

GENERAL COMMITTEE MEETING AGENDA                                                               12 OCTOBER 2020

                                                                                                      Attachment 2

 Current Assets
      Cash and cash equivalents                                   43,016                72,276                  57,023
      Trade and other receivables                                  9.085                  8,792                  5,440
      Inventories                                                    198                    183                    181
      Contract Assets                                                  -                     27                     27
      Other current assets                                         2,466                  3,680                  4,732
                                                                 54,765                 84,958                  67,403
      Non Current Assets held for sale                                 -                      -                       -
 Total Current Assets                                            54,765                 84,958                  67,403
 Non Current Assets
      Trade and other receivables                                 49.718                 49,593                 49,593
      Other non current Assets                                         -                      -                       -
      Investments                                                 83,342                88,040                  88,040
      Investment property                                          3,300                  3,000                  3,000
      Property, plant and equipment                             948.640                 930,437                929,355
      Right of Use Assets                                              -                    161                    161
      Intangible assets                                            7,773                  7,809                  7,635
 Total Non Current Assets                                      1,092,773              1,079,038               1,077,783
 Total Assets                                                  1,147,538              1,163,996               1,145,186
 Current Liabilities
      Trade and other payables                                     6,419                 11,920                 10,642
      Contract Liabilities                                             -                  1,568                  1,568
     Borrowings                                                    3,116                  1,431                  3,023
      Lease Liablities                                                 -                    54                      54
      Provisions                                                   4,630                  2,315                  4,630
     Other                                                         2,778                  1,821                  1,561
 Total Current Liabilities                                        16,942                 19,109                 21,478
 Non Current Liabilities
     Borrowings                                                   19.637                 18,493                 18,493
      Lease Liabilities                                                -                    110                    110
      Provisions                                                  12,054                 15,307                 15,307
 Total Non Current Liabilities                                    31,691                33,910                  33,910
 Total Liabilities                                               48,633                 53,019                  55,388
 Net Community Assets                                         1,098,905              1,110,978               1,089,798
 Community Equity
      Asset Revaluation Surplus                                   85,293                86,525                  86,525
      Retained Surplus / (Defeciency)                                  -                      -                       -
      Shire Capital                                            1,013,612               996.982                 992,284
      Current Year Net Eamings                                         -                27,471                  10,989
 Total Community Equity                                       1,098,905              1,110,978               1,089,798

                                                                                                      Page 74 of 84

Section 75

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020


                                       Attachment 3




                                       Page 75 of 84

GENERAL COMMITTEE MEETING AGENDA                                                                  12 OCTOBER 2020

                                                                                                         Attachment 3

 Cash flows from operating activities
      Cash Flows from Operating Activities
     Receipts from Customers                                               83,309             38,970              91,168
      Payments to Suppliers and Employees                                   (77,358)          (21,512)            (82,671)
                                                                             5,951             17,458               8,498
      Receipts:
      Investment and Interest Revenue Received                               3,470                196               3,937
      Rental Income                                                           1,199              304                1,003
      Non Capital Grants and Contributions                                   5,752              1,562              5,315
      Income Tax Equivalent Received                                          1,200              253                1,857
      Income from Equity Investments                                          1,850                 -               1,396
      Payments:
      Borrowing Costs                                                             -                 -                   -
      Interest Expense                                                       (1,126)              (38)              (143)
     ‘Net Cash Inflowi(Outflow) from Operating Activities ===              18.296             19,735              21861

      Proceeds of Sale of Property, Plant and Equipment                           -                 -                284
      Grants, Subsidies, Contributions and Donations                        12,861              3.264              8.640
      Payments:
      Payments of Property, Plant and Equipment                             (31,419)           (5,624)            (24,208)
      Payments for Intangible Assets                                         (1,448)            (367)              (1,710)
      Net Movement in Loans and Advances                                          -               125                125
     ‘Net Cash Inflowi(Outflow) from Investing Activities =»)             (20,007)             (2.602)          (16,869)
 Cash Flows from Financing Activities

     Proceeds from Borrowings                                                3,420                  -                   -
      Payments:
     Repayment of Borrowings                                                (2,636)             (1,881)            (3,950)
     ‘Net Cash Inflowi{Outfiow) from Financing Activities ==                   784@               8B)             (8.950)
     ‘Net Increase/(Decrease) in Cash and Cash Equivalentsheld =             (927)            15.253               1,042
      Cash and Cash Equivalents at the beginning of the reporting period   43,942              57,023             55,981

                                                                                                         Page 75 of 84

Section 76

GENERAL COMMITTEE MEETING AGENDA   12 OCTOBER 2020


                                       Attachment 4




                                       Page 76 of 84

GENERAL COMMITTEE MEETING AGENDA                                                                      12 OCTOBER 2020

                                                                                                              Attachment 4

     Materials and services
     Advertising and Marketing                               187             39               25            (14)       13%
     Administration Supplies and Consumables                683              172             146            (26)       21%
     Audit Expenditure                                       160               2               -            (2)         0%
     Communications and IT                                   678             168             147            (21)       22%
     Commission Paid                                        605              152             257             105       43%
     Consultancy Services                                   928              180             160            (20)       17%
     Contract Services                                   20,798            4,592           4,566            (27)       22%
     Contributions, Donations, Sponsorship and Prizes      3,387           1,521           1,476            (44)       44%
    Electricity                                            1,639            406             445              39        27%
     Intemal Fleet Costs and External Plant Hire           1,615            463             482               19       30%
     Grants Paid to Community Organisations                1,547             511            520                9       34%
     Insurance                                              625             594             573             (20)       92%
     Legal Expenses                                        1,105            264              316              52       29%
     Operating Leases and Rentals                           256              56               62              6        24%
     Software and Maintenance                              2,003            487             444             (43)       22%
     Subscriptions and Registrations                        263              157             181             24        69%
     Waste Levy Payments                                   1,185            269             300               31       25%
     Water and Sewerage Charges                            1,091            263              194            (69)       18%
     All Other Materials and Services                      4,538            800             578            (222)       13%
                                                         43,293           11,093          10,871            223        25%

                                                                                                              Page 76 of 84

Section 77

GENERAL COMMITTEE MEETING AGENDA                                             12 OCTOBER 2020


   9    UPDATE ON SUNSHINE COAST AIRPORT FLIGHT PATH ISSUES

   Author            Chief Executive Officer, Brett de Chastel
                     CEO’s Office

   Index             ECM/ Project/ Sunshine Coast Airport

   Attachments       1.   Aircraft Noise Ombudsman Report - “Investigation into
                          Complaints about the Introduction of New Flight Paths in
                          Sunshine Coast” – April 2020 (Note: Attachment has been provided
                          separately to this report)



   EXECUTIVE SUMMARY
   Not applicable.

   RECOMMENDATION
   That Council note the report by the Chief Executive Officer to the General Committee Meeting
        dated 12 October 2020 and
   A.   Note the update by the Chief Executive Officer in relation to the flight path issue for the
        Sunshine Coast airport;
   B.   Authorise the CEO to make representations to Airservices Australia regarding the
        terms of reference for the proposed post-implementation review to ensure that the
        process is fair, robust and allows genuine opportunities for the community to influence
        the outcome of the post implementation review; and
   C.   Provide funding of $5,000 to the Flight Path Forum Inc community organisation to
        support the commissioning of an independent study to identify alternative flight paths
        that can be considered as part of the post-implementation review.


   REPORT
   This report will cover three key aspects of the Sunshine Coast Airport flight path issue,
   namely:
        Providing Council with background information on the Sunshine Coast airport flight
         path issue;
        Providing details about the outcome of the review undertaken by the Aircraft Noise
         Ombudsman (ANO); and
        Outlining actions that are being taken as a result of the Aircraft Noise Ombudsman
         review, together with suggested next steps for our Council.

   1.       Background on the Sunshine Coast airport flight path issue

   As Council would be aware, there has been considerable community concern in relation to
   the proposal by Airservices Australia (ASA) to implement flight paths for the expanded
   Sunshine Coast Airport which is impacting on residents in some parts of the Noosa Shire.

   This issue has been the subject of a number of previous reports to Council which sets out
   the background and details in some detail. Links to previous reports can be found below:
   1.   Report by the CEO to the Ordinary Meeting on 18 April 2019. This report set out the
        history of the various Environmental Impact Statements (EIS’s), details about noise

                                                                                   Page 77 of 84

Section 78

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


         contours and potential flight paths together with details of hours of operation etc. A
         copy       of     that         report     can        be       found       here       –
         https://www.noosa.qld.gov.au/downloads/file/601/2019-04-18-ordinary-meeting-
         agenda-pdf

         The decision of Council in relation to that report on 18 April 2019 can be found below
         under the heading of “Previous Council consideration”.

   2.    Report by the CEO to the Ordinary Meeting on 16 May 2019. This report set out details
         of what action had been taken in relation to the April 2019 decision together with details
         of concerns relating to the consultation process undertaken by ASA and Sunshine
         Coast Council. A copy of that report can be found here –
         https://www.noosa.qld.gov.au/downloads/file/610/2019-05-16-ordinary-meeting-
         agenda-pdf

         The decision of Council in relation to that report on 16 May 2019 can be found below
         under the heading of “Previous Council consideration”.

   At the outset, it is important to note that the flight path issue is a separate issue to the
   expansion of the airport. That airport expansion has been finalised and the new runway has
   now been commissioned and is operational.

   Some of the key issues that have been raised by our community in relation to the flight path
   issue include:
        extremely poor or no consultation with the communities directly affected by the
         proposed flight paths;
        lack of information about the potential impacts of proposed flight paths on Noosa
         residents including inconsistent advice about noise issues;
        confusion regarding the previous EIS’s and what was proposed in terms of flight paths;
        confusion regarding proposed hours of operation of the airport with different hours
         being identified in EIS’s and flight path consultation processes;
        confusion regarding the intensity of flight numbers over different parts of the Shire (e.g.
         the coastal flight path); and
        lack of an independent EIS for the impact on Lake Weyba, the Noosa National Park
         and the coastal dunes within the Castaways Beach and Marcus Beach areas.

   Council also previously committed to supporting the statement of intent by Flight Path Forum
   Inc. A copy of that statement of intent is below:




                                                                                    Page 78 of 84

Section 79

GENERAL COMMITTEE MEETING AGENDA                                        12 OCTOBER 2020




   Flight Path Forum Inc is an umbrella group representing a significant number of community
   organisations within Noosa Shire and the northern part of the Sunshine Coast Council area
   where communities have been affected by the proposed flight paths. The CEO has been
   liaising with Flight Path Forum Inc on a regular basis in relation to this matter.



                                                                             Page 79 of 84

Section 80

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


      2.    Review by the Aircraft Noise Ombudsman (ANO)

      The ANO is a statutory review process put in place to independently review complaints about
      the operations of ASA. In recent years, it has prepared a number of quite critical reports
      about how ASA have undertaken reviews of flight paths and their consultation practices. Until
      the Sunshine Coast airport issue arose, the most recent example of a report that was critical
      of ASA related to a review of flight paths at Hobart.

      The ANO has the power to independently review complaints made to it about ASA. However,
      it is important to note that the ANO cannot change a decision of ASA but can only make
      recommendations to the ASA Board, which is common for ombudsman type roles. It is then
      up to the ASA Board to determine whether or not it agrees with recommendations made by
      the ANO.

      There were a large number of complaints made to the ANO by residents regarding the
      process used by ASA to develop the current flight paths. As a Council, we also lodged a
      formal complaint regarding that process and provided the ANO with a series of submissions
      outlining poor consultation processes, inconsistent information and procedural unfairness in
      terms of the process used by ASA to develop the flight paths.

      The ANO released its report in April 2020 entitled – “Investigation into Complaints about the
      Introduction of New Flight Paths in Sunshine Coast”.

      The report was quite scathing of ASA’s processes and consultation. Some of the findings of
      the ANO included:
          ASA targeted consultation to those areas which were not considered under the EIS
           process for flight paths5
          ASA had prepared a Stakeholder Engagement Plan but the final version of that was
           not completed until after the community engagement had commenced6
          ASA published notices in 6 papers advising of the proposed consultation with none of
           those papers circulating widely in the Noosa area and, as identified by the ANO, meant
           that only readers in locations outside the area affected by flight paths were being
           notified by newspaper.7
          ASA underestimating the level of public interest.
          ASA reporting that 24% of submissions received related to noise but in fact, 475 of the
           917 submissions (51%) raised noise as a concern8
          A Stakeholder Roundtable which was held on 5 July 2019 to enable community input
           allowed little time for questions or statements by the community with majority of the
           meeting devoted to presentations by Sunshine Coast Council and ASA.
          a lack of clarity about who had responsibility for consultation – ASA or Sunshine Coast
           Council as the owner of the airport

      The key findings from the ANO included the following:
        “9.6 This apparent division of responsibilities, produced confusion as the process
        continued. Airservices and the Sunshine Coast Council each placed separate public
        notices about upcoming consultation activities and complaints show inconsistent
        information provided at community consultation sessions by representatives of the two
        parties. Airservices did not anticipate the extent of public interest and did take steps to
        respond to the changing circumstances. It also considered the feedback received from

5 refer to paragraph 5.8 of ANO report – page 13
6 refer to paragraph 5.5 of ANO report – page 13
7 refer to paragraphs 6.1 – 6.3 of the ANO report - page 15
8 refer to paragraph 7.20 of the ANO report – page 22


                                                                                    Page 80 of 84

Section 81

GENERAL COMMITTEE MEETING AGENDA                                                  12 OCTOBER 2020


           general as well as the target areas. However, Airservices’ decision to only consider
           varying its final design from its proposed design where suggested alternatives were
           aligned to the EIS concept paths meant that “consultation” with those in the general area
           was effectively consultation in name only. The complaints to the ANO demonstrate that
           public anger continued to grow through the process and remained after the consultation
           period had closed.

           9.8 There was never any realistic prospect that residents in the general area, despite the
           chance to provide their feedback, had any significant opportunity to influence the
           proposed flight paths. This quickly became apparent to them during the process and was
           the fundamental basis of the complaints to the ANO”.9 (my emphasis)

      The Aircraft Noise Ombudsman made two recommendations to the ASA board, namely:

      Recommendation 1
      Airservices should develop a framework for third party proposed changes that:
      (a) provides robust and dependable governance arrangements to manage its early and
            ongoing engagement with third parties
      (b) establishes clear lines of accountability and documents these arrangements as they
            evolve
      (c) ensures an effective consultative process, which includes monitoring the adequacy of
            any third party consultations being relied on.

      Recommendation 2
      Airservices should, as soon as practicable, design an effective post-implementation review
      (PIR) process for the Sunshine Coast flight path designs, that does not perpetuate design
      constraints requiring alignment with EIS concepts, and which encompasses:
      (a) consideration of identified community-suggested alternatives
      (b) a community engagement process that provides for genuine opportunities for
            community contributions to influence decisions
      (c) application of the latest version of Airservices’ National Operating Standard (NOS)
            Environmental Management of Changes to Aircraft Operations (AA-NOS-ENV-2.100).

      On 25 June 2020, the ASA board announced that it accepted the two recommendations.

      The first of the recommendations focuses on arrangements between ASA and its client
      airports about roles and responsibilities for future reviews of this nature. This is not something
      that will impact upon the current flight paths for Sunshine Coast but, if properly implemented,
      could reduce confusion for future reviews undertaken at other airports.

      Of more interest is recommendation two which is discussed further below.

      3.     Proposed post-implementation review and next steps for Council

      ASA have committed to undertaking a post-implementation review (PIR) in response to the
      ANO recommendations.

      The scope and process to be used in the PIR will be the subject of a terms of reference. This
      is the key to ensuring that the PIR is undertaken in a fair and proper manner.




9 refer to paragraphs 9.6 and 9.8 of the ANO report – pages 28 and 29


                                                                                        Page 81 of 84

Section 82

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


   Council has already engaged with ASA to provide details about what needs to be covered
   by the terms of reference. Other community groups including Flight Path Forum Inc have
   done the same.

   On Saturday, 19 September 2020, ASA conducted a community engagement session to
   discuss the proposed post-implementation review and in particular, the proposed terms of
   reference for that review. The CEO attended that community engagement session on
   Council’s behalf. Also present were representatives of community groups from across Noosa
   Shire and Sunshine Coast Council representing residents in the areas affected by the flight
   paths.

   At that meeting: -
        ASA acknowledged that it had a “trust deficit” with the community based on its
         community engagement processes to date and committed to working more closely with
         the community through this post implementation review;
        ASA received significant feedback at that meeting about what the terms of reference
         should look like and how they should be developed;
        ASA took on board a number of principles provided by the community groups and
         undertook to draft a community engagement plan as part of the terms of reference
         process and to consult with the community on this;
        ASA committed to publishing all material from that community engagement meeting
         held on 19 September. Details can be found here –
         https://engage.airservicesaustralia.com/sunshine-coast-airport-airspace-changes-
         runway-1331/news_feed/pir-terms-of-reference-community-meeting-19-september-
         2020

   One of the most critical elements of the post-implementation review will be the opportunity
   for community suggested alternative flight paths to be considered. This did not effectively
   occur in the original review process.

   Flight Path Forum Inc, as the umbrella organisation for most of the affected community
   groups in our region, are proposing to commission an independent consultant to develop a
   number of potential flight path alternatives which could be considered in this process. The
   cost of undertaking that work is just under $20,000.

   Our Council has always taken the position that we need to support our community on this
   issue to ensure that community input is heard and can have a meaningful impact on the final
   flight paths. As such, it is recommended that Council make a contribution towards the cost
   of this work to be commissioned by contributing $5,000 towards Flight Path Forum Inc. It is
   expected that there will be a range of alternative flight paths that can be considered as part
   of that process.

   (Note - Since preparing this report to Council, ASA have published a draft terms of reference.
   They are currently being reviewed by the CEO who is consulting with Flight Path Forum Inc
   and will co-ordinate a submission back to ASA. Feedback on the draft terms of reference are
   due by 1 November 2020).

   4.    Other issues

   It is important that Council also recognise several other issues at this time.

   Firstly, the airport has been constructed on its new alignment and flights to and from the
   airport need to approach and depart from somewhere. In other words, there will be flight
   paths. At the end of this post implementation review process, there will be flight paths coming

                                                                                    Page 82 of 84

Section 83

GENERAL COMMITTEE MEETING AGENDA                                           12 OCTOBER 2020


   to and from the Sunshine Coast Airport and people living underneath those flight paths will
   be impacted. The question is - what are the flight paths that have the least impact but are
   also safe?

   Secondly, during the COVID-19 period, although the airport has been open, there have not
   been as many flights as normal. Even so, there have been quite a number of complaints
   lodged by Noosa residents with the Sunshine Coast Airport and ASA about noise impacts of
   flights. These include complaints from areas where there was no expectation that there would
   be flights/noise impacts.

   Thirdly, flight path design is a complex issue. Obviously, safety is paramount and must be
   taken into account as the primary design element. Nevertheless, there are a range of other
   variables which can impact upon flight paths including topography, efficiency of routes
   (shortest path), environmental constraints, other regulated airspace etc.

   Previous Council Consideration
   Ordinary Meeting Minutes, 16 May 2019, Item 1, Page 13
   That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated 16
   May 2019 in relation to the proposed flight path changes for the Sunshine Coast Airport and:
   A.   Note the update from the Chief Executive Officer on actions taken as a result of the
        Council decision in April 2019 on this issue; and
   B.   Support the Statement of Intent proposed by Flight Path Forum Inc. as set out in
        Attachment 1 to the report and request the Chief Executive Officer to take the
        necessary action to pursue that outcome including making submissions to Airservices
        Australia and the Aircraft Noise Ombudsman.

   Ordinary Meeting Minutes, 18 April 2019, Item 1, Page 15
   That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated 18
   April 2019 and request the Chief Executive Officer to make a submission in relation to the
   proposed changes to flight paths for the Sunshine Coast Airport with such submission:
   A.   To focus on the establishment of a curfew similar to Gold Coast Airport (enforced by
        legislation) to minimise the impact of noise from flights on the amenity of residents in
        order to protect and maintain the Noosa lifestyle and environment;
   B.   To request from Airservices Australia a detailed explanation as to why the intensity of
        flight numbers over the coastal flight path versus hinterland flight path has changed;
   C.   To request Airservices Australia to extend their community consultation process by 1
        month to provide more time for Noosa residents to lodge submissions in relation to the
        proposal;
   D.   Request Sunshine Coast Regional Council to conduct an independent EIS for Lake
        Weyba, plus Noosa National Park and the coastal dunes within the Castaways and
        Marcus Beach area;
   E.   And request Federal Members Llew O’Brien and Ted O’Brien to support Council’s
        position on this matter.

   Finance
   It is proposed to contribute $5,000 to Flight Path Forum Inc towards the cost of engaging an
   independent flight path consultant to develop a number of alternatives to the current flight
   path so that those alternatives can be considered by ASA via the post-implementation review
   process. This will be funded from the existing budget in the CEO’s office for consulting
   services.


                                                                                 Page 83 of 84

Section 84

GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


    Risks & Opportunities
    The post-implementation review which is being undertaken by ASA is an opportunity to rectify
    the poor community engagement processes that occurred during the original consultation on
    the flight paths during 2019. It provides the community with an opportunity to be genuinely
    involved and to, hopefully, influence the outcome.

    The proposal to consider community alternatives to the current flight paths is also an
    opportunity to allow broader consideration of alternatives rather than just the proposed flight
    paths which were the subject of ASA’s consultation in 2019.

    The risk, of course, is that if flight paths are changed, there are likely to be new people
    affected by aircraft noise as the flight paths need to go somewhere. The key for Council is to
    ensure that the process is fair, robust and gives community members and community
    organisations an opportunity to influence the final outcome.

    Consultation
    External Consultation - Community & Stakeholder
    Flight Path Forum Inc
    Airservices Australia

    Internal Consultation
    Cr Wilkie (as Council’s representative on the Sunshine Coast Airport Consultative
    Committee)

    Departments/Sections Consulted:

     X     Chief Executive Officer    Community Services                         Corporate Services
           Executive Officer          Director                                   Director
           Executive Support          Community Development                      Financial Services
                                      Community Facilities                       ICT
                                      Libraries & Galleries                      Procurement & Fleet
                                      Local Laws                                 Property
                                      Waste & Environmental Health               Revenue Services

           Executive Services         Environment & Sustainable Development      Infrastructure Services
           Director                   Director                                   Director
           Community Engagement       Building & Plumbing Services               Asset Management
           Customer Service           Development Assessment                     Buildings and Facilities
           Governance                 Economic Development                       Civil Operations
           People and Culture         Environmental Services                     Disaster Management
                                      Strategic Land Use Planning                Infrastructure Planning,
                                                                                 Design and Delivery




6   CLOSED SESSION

    Nil.



                                                                                    Page 84 of 84

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.