GENERAL COMMITTEE MEETING AGENDA                                              12 OCTOBER 2020


        Agreement to be entered into to facilitate the payment of a contribution in lieu of a
        shortfall of three onsite car parking space.
        The application has been lodged under the Noosa Plan 2006 and seeks approval to
        change multiple existing development approvals, specifically:
   Ground Floor
       a new outdoor dining area for the Providore tenancy, totalling 56m2 of use area, and
        including a new roof structure over the outdoor dining area;
       a new awning over the Hastings Street and western side of the Bellissima tenancy,
        extending over the ‘service yard’ area on the western elevation of the building;
       a new roof over the foyer entry and car set down area adjoining the lobby;
       a new entry structure to the rear of the building, distinguishing the entry to the site from
        The Parade and Main Beach;
       new stairs and substation to the eastern side of the building / “Sails” entry and changes
        to the western façade;
       new shopfront and roof over 'Rumba Bar' as well as extension of Fire Stair 01;
       provision of one new onsite carpark located on the driveway.
   Level 1
       a new plunge pool to the west and new awning structure above the north facing (beach)
        side of Unit U205 terrace;
       new amenities and roof structure to the eastern side of the building / “Sails” entry and
        changes to the western façade;
   Level 3
       new cantilevered awnings above the north facing (beach side) balconies of Units U401
        to U416;
   Level 4 / Roof Terrace
       an extension of the existing fire exit stairs from Level 3 to Level 4 / Roof Terrace to
        meet fire and evacuation codes;
       an extension of the eastern lift from Level 3 to Level 4 / Roof Terrace to meet Disability
        Discrimination Act standards;
       new covered walkway links to the fire stairs on Level 4 / Roof Terrace;
       new pergolas located on Level 4 / Roof Terrace, including one on each of the roof
        terraces associated with Units U401 to U416.
   Whole development
   The proposal also includes ‘cosmetic’ changes to the entirety of the development, including:
       new render and paint finish to all external walls;
       new aluminium sliding doors to terraces / balconies;
       new aluminium windows;
       new frameless glass balustrade with aluminium uprights;
       updated landscaping (to be assessed through a separate Operational Works
        application); and
       new tiles to walkways, terraces and balconies.


                                                                                    Page 13 of 84
Log in to download the original file

2020-10-12 General Committee Agenda(PDF, 7MB).pdf · 7.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.