Geotechnical Report (1) · MCU21/0212
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
PROPOSED RESIDENCE
66 SEAVIEW TERRACE, SUNSHINE BEACH
Table of Contents
1.0 INTRODUCTION ........................................................................................................................................................ 1
2.0 PROPOSED DEVELOPMENT ................................................................................................................................... 1
3.0 METHOD OF INVESTIGATION ................................................................................................................................. 2
3.1 Fieldwork ...................................................................................................................................................... 2
3.2 Geotechnical Laboratory Testing .................................................................................................................. 2
4.0 RESULTS OF INVESTIGATION ................................................................................................................................ 3
4.1 Site Description............................................................................................................................................. 3
4.2 Topography................................................................................................................................................... 6
4.3 Geology ........................................................................................................................................................ 8
4.4 Subsurface Conditions.................................................................................................................................. 8
4.5 Groundwater ................................................................................................................................................. 9
4.6 Geotechnical Laboratory Test Results .......................................................................................................... 9
4.7 Surface Drainage ........................................................................................................................................ 10
5.0 SLOPE STABILITY ASSESSMENT ........................................................................................................................ 10
5.1 Existing Conditions ..................................................................................................................................... 10
5.2 Stability Assessment................................................................................................................................... 11
5.2.1 Quantitative Assessment ...................................................................................................................... 12
6.0 GEOTECHNICAL RECOMMENDATIONS .............................................................................................................. 15
6.1 Earthworks .................................................................................................................................................. 15
6.1.1 Site Preparation and Trafficability ......................................................................................................... 15
6.1.2 Excavations ........................................................................................................................................... 16
6.1.3 Filling..................................................................................................................................................... 17
6.2 Building Foundations .................................................................................................................................. 17
6.2.1 Indicative Site Classification.................................................................................................................. 17
6.2.2 Footing Design ...................................................................................................................................... 17
6.3 Temporary and Permanent Retention......................................................................................................... 19
6.4 Drainage ..................................................................................................................................................... 20
7.0 CONCLUSION ......................................................................................................................................................... 20
8.0 LIMITATIONS .......................................................................................................................................................... 20
23 November 2021
Report No. 21370-001-Rev0 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotechnical Report (1).pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.