Skip to the record
Accept no substitutions.

Original source · versioned page text

2018-12-11 Planning & Environment Committee Agenda

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               11 DECEMBER 2018


Table 1 – Background of development on lots affected by the Coastal Building Line on the
seaward side of Seaview Terrace

 Address in   Development             Date of Decision     Comments
 Seaview      Approval
 Terrace
 The blue rows represent development assessed under the State Coastal Management Plan* provisions.
 38           2005132004.240114       11 July 2005         No development seaward of the Coastal
                                                           Building Line.

 40           51993.271               1993                 DA File misplaced. Building plans indicate
                                                           development approximately 3m to 4m
                                                           seaward of the Coastal Building Line.
 42                                                        Subject site – background provided above.
 44           No DA records for                            Original dwelling appeared (from aerials)
              original dwelling                            to comply with the Coastal Building Line
                                                           setback.
              MCU12/0159              9 January 2013       A portion of the building, a deck and pool
                                                           (pool setback 4m – 5.7m from rear
                                                           boundary) approved seaward of the
                                                           Coastal Building Line. Third party referral
                                                           to DEHP. Alignment of neighbouring
                                                           property    was    considered     in   the
                                                           assessment.
              MCU15/0023              5 June 2015          A greater setback to the pool (4.9m to
                                                           6.5m from rear boundary) and a reduction
                                                           of building forward of the Coastal Building
                                                           Line when compared to the previous
                                                           approval.
 46 - 48      132005.2200             27 February 2007     The application was subject to the State
                                                           Coastal Management Plan*. For context
                                                           an extract from the planners report is
                                                           provided below—
                                                           The State Coastal Management Plan
                                                           contains specific provisions relating to
                                                           erosion prone areas when undertaking
                                                           development assessment. The State
                                                           Coastal Management Plan, Policy 2.2.2
                                                           applies to Erosion Prone Areas. For
                                                           existing developed areas in the erosion
                                                           prone area, the limit for new buildings is
                                                           the building alignment of neighbouring
                                                           properties. Further development is only to
                                                           occur landward of this alignment.
                                                           The proposed dwelling house is primarily
                                                           located landward behind the 15 metre
                                                           building setback line from the rear
                                                           boundary. Although small sections of the
                                                           house and the proposed pool extend
                                                           within this setback, the development does
                                                           not occur seaward of the neighbouring
                                                           dwelling to the north or the existing deck
                                                           on the site which is to be retained.




                                                                                       Page 16 of 72
Log in to download the original file

2018-12-11 Planning & Environment Committee Agenda(PDF, 9MB).pdf · 9.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.