RFI Response_151020

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Thursday, 15 October 2020

Our Ref: 19417 / Office: Sunshine Coast
Council Ref: RAL20/0017 & OPW20/0144



           NOOSA COUNCIL
           PO BOX 141
           TEWANTIN QLD 4565

           ATTENTION: The Chief Executive Officer



Dear Sir

INFORMATION RESPONSE
DEVELOPMENT PERMIT FOR RECONFIGURING A LOT AND OPERATIONAL WORK FOR A ONE
INTO FOUR LOT INDUSTRIAL SUBDIVISION AND ACCESS EASEMENTS

1 TAYLOR COURT, COOROY
LOT 6 SP197517

Further to your information request for the abovementioned development application we now
respond to all of the information requested.
                                    START INFORMATION RESPONSE

Issue
Performance Outcome PO20 of the Low Impact Industry Zone Code seeks to protect the visual
amenity and character surrounding the major road network by appropriate landscaping. Acceptable
Outcome AO14 of the Low Impact Industry Zone Code seeks a setback of 10 metres to Holts Road.
Information Required
1.   Provide amended landscape plans that include and detail:
     a) A 10 metre wide landscape strip along the full extent of the Holts Road frontage of the site;
     b) Clear dimensions of the proposed landscape areas.
2.   Provide further details of the proposed fencing on the site.
     With regards to the landscape strip along the Holts Road frontage, Council intends to impose the
     requirement of a covenant to protect the vegetation in perpetuity.
Response to items 1 & 2
The landscape plans have been amended to include a 10m wide landscape strip along the full extent
of the Holts Road frontage. The landscape plans provide clear dimensions of the proposed landscape
areas. Tree protection fencing is the only fencing that is proposed as part of this application.

Issue
The Earthworks Erosion and Sediment Control Plan is not reflective of the requirements for the large
site and has no information on the type of soil that will be exposed, timing and staging of works or
drainage management to prevent erosion. The State Planning Policy requires that all exposed areas
greater than 2500m2 must be provided with sediment controls which are designed, implemented and
Log in to download the original file

RFI Response_151020.pdf · 412 KB (small file)

Full text of the other 1 page

Page 2

maintained to a standard which would achieve at least 80% of the average annual runoff volume of the
contributing catchment treated (i.e. 80% hydrological effectiveness) to 50mg/L Total Suspended Solids
(TSS) or less, and pH in the range (6.5–8.5).

Information Required
3. Provide a sediment and erosion control plan certified by a Certified Professional in Erosion and
    Sediment Control that it is consistent with the International Erosion Control Association Best
    Practice Books as well as State Planning Policy requirement for erosion and sediment control on
    construction sites larger than 2500m2.
Response
Please refer to the civil engineering response and amended Erosion and Sediment Control drawings
for a response to this item.

Issue
The application proposes construction of an approximately 500m2 hardstand driveway, allotment
reshaping and redirection of sheet flows to concentrated flow outlets. Where not appropriately
managed, these cumulatively will increase scour and impact the quality of runoff via increased peak
runoff from both the hardstand and outlet pipes. Further it is unclear how runoff from the driveway will
be treated to achieve the no worsening requirement for water quality in the drinking water supply
catchment.

Information Required
4. Demonstrate how the changed peak flow and water quality from the driveway as well as funnelled
    through each stormwater outlet will be managed to achieve the requirement of no worsening of
    water quality running off site.
Response
Please refer to the civil engineering response, revised civil engineering plans and MUSIC model for a
response to this item.

                                    END INFORMATION RESPONSE

Part 3: Information Request has now concluded and the application is now in Part 5: Decision.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
PROJECT URBAN




John McKennariey
Director
Email: [email protected]

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.