ORDINARY MEETING MINUTES 19 MAY 2022
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Sheet Plan/Document Name Date
No.
QC100259 S0 Site specific notes, prepared by Telstra 18.06.2021
QC100259 S1 Site Layout and Access, prepared by Telstra 18.06.2021
QC100259 S1-1 Site Layout, prepared by Telstra 18.06.2021
QC100259 S1-2 Site Setout Plan – Option 1, prepared by Telstra 18.06.2021
QC100259 S3 East Elevation, prepared by Telstra 18.06.2021
QC100259 G4 Site Earthing – Option 1, prepared by Telstra 18.06.2021
QC100259 G4-1 Earthing Scenario 3, prepared by Telstra 18.06.2021
QC100259 G4-4 Trench Details, prepared by Telstra 18.06.2021
QC100259 E2 AC Power Connection, prepared by Telstra 18.06.2021
QC100259 T2 Concrete Foundation Details, prepared by Telstra 18.06.2021
QC100259 T2-1 Equipment Platform – H Frame Detail, prepared by 18.06.2021
Telstra
QC100259 T8 Compound Fence and Gate Details, prepared by 18.06.2021
Telstra (as annotated by Council)
501-PL A Landscape Concept Plan, prepared by Urbis 21.12.2021
Nature and Extent of Approved Use
3. The maximum height of the satellite dish must not exceed the maximum height as
reflected in the approved plans with respect with the finished ground level and the
natural ground level.
4. No lights are permitted to be attached to the telecommunications facility, except
where required for hazard lighting purposes or similar.
Currency Period
5. The Currency Period for this development approval lapses if the use has not
happened by 19 May 2028, unless an application to extend the currency period is
approved by Council.
Health and Safety
6. The development must not, at any time during the life of the development, result in
human exposure to environmental electromagnetic emissions exceeding the
current regulations, standards and/or recommendations of the Australian Radiation
Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
infrastructure must provide, at any time upon request by Council, written
certification to demonstrate compliance with this condition. The written certification
must assume:
a. a maximum number of users over the lifetime of the structure;
b. full power usage;
c. a maximum down tilt of antennae.
Colours and Finishes
7. The development must be finished in pale eucalypt or the like in order to visually
blend into the landscape.
8. Associated fencing (and gate) as shown on the approved plans must be visually
unobtrusive and must be camouflaged through the use of colours, materials and
screening vegetation to blend the fence into the visual landscape.
Page 12 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.