Original source · versioned page text
Appendix F - SBSMP
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
6.2.1.4 Catchment Split
Total land use to the bio-retention basin and the catchment breakdown is shown in the table below.
Table 8 - MUSIC Model Catchments
Roof (ha) Road (ha)
Catchment
100%FI 100%FI
Site 0.203 0.175
6.2.1.5 Proposed Treatment Train
A treatment train consisting of one conventional bioretention system, is proposed for the development. The
proposed bioretention system is proposed to be located within the proposed detention basin. The figure below
summarises the proposed treatment train for the development.
Figure 2 – MUSIC Model Layout (Bio-Retention)
BR210522_SBSMP_Rev3.docx Page 15 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.