Original source · versioned page text
Appendix F - SBSMP
Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 32, section 1. The text section number identifies this passage in the reader.
LEGEND
SWD PROPOSED STORMWATER DRAINAGE
SWD PROPOSED EXTERNAL DIVERSION STORMWATER DRAINAGE
EXISTING STORMWATER DRAINAGE
PROPOSED BIORETENTION BASIN
PROPOSED DETENTION BASIN
2400 HIGH SECURITY FENCE 145.420 188°43'05" 2400 HIGH SECURITY FENCE
EU
MU
L
L
L
L
L
L
L
L
L
L
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
W W W W H
W W W W W W W W W W W W W W W H
ND
FHR FHR FHR
FHR
W
GOODS
W
GOODS INWARDS
RRSD
INWARDS
IN
RSD
PY
NO
GI CA
ENTRY ONLY
W
GAS
W
OO
CAGE
B
R.S.D FHR
L
L
CO
CO
W
SA
W
49.6
W
RO
W
2
L
2
CO
L
CO
L
L
CO
CO
AD
252
EX W D
W
TIMBER TRADE SALES MAIN WAREHOUSE
FLO
BAGGED
FHR
W
°01
B B
4,687.33 m2
ISIT IRE
E.O.D
1,134.67 m2 GOODS
'15"
W
B B
CANOPY
W
PROPOSED STORMWATER PIT
NG CTI
880.71 m2
L
L
L
CO
CO
L
L
L
L
L
L
CO
W
CO
CO
CO
CO
CO
CO
L
CO
W
69.390 98°46'20"
W
TO BE SIZED TO CAPTURE
L
CO
L
CO
EX ON
L
CO
EXTERNAL Q100 FLOW OF
W
W
TE
L
CO
0.585m3/s
L
L
L
CO
CO
CO
RN
W
ER
OV
AD
HE
LK
PIT IS PROPOSED TO HAVE A
W
BU
ING
IST
EX
L
CO
AL
FALL
FALL
FALL
PONDING DEPTH OF
W
W
L
0.15m-0.3m
CO
L
CO
L
L
L
CO
CO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.