Council archive · source document
Minor Change - Planning Report 11 Allambi · 132000.200359.3
‘Substantially different’
Comment
development
use to become additional bedrooms.
There is no change to the scale, bulk and appearance of
the building.
Changes the ability of the proposal The changes does not alter the use as intended.
to operate as intended.
Removes a component that is The proposed minor change will not alter the operation
integral to the operation of the
of the development.
development.
Significantly impacts on traffic flow No impacts will be as a result of the proposed Minor
and the transport network, such as
Change application.
increasing traffic to the site.
Introduces new impacts or increases No new impacts or severity of impacts occur due to the
the severity of known impacts.
minor change.
Removes an incentive or offset No incentive or offset component will be impacted as a
component that would have
result of the proposed Minor Change.
balanced a negative impact of the
development.
Impacts on infrastructure provisions. The proposed Minor Change will not impact upon any
infrastructure network.
RG Strategic Planning Report – Minor Change Application 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change - Planning Report 11 Allambi.pdfRelated documentApplication case desk ↗
About this file
- File size
- 470 KB (small file)
- File type
No other editions are linked here.