Original source · versioned page text
Operational Works Application - DA Form 1 & Plans - 31 Edward St, Noosaville
Plans and drawings: the text below has words only, no drawings.
Very large file (19.2 MB): may take a few minutes to open.
DRAWING SIZE - A2
NOTE:
BUILDERS TO REFER DRAWING S1.1 FOR SITE
INSPECTION REQUIREMENTS.
ROOF FRAMING SCHEDULE
MARK SIZE/GRADE______________
R1 150 x 45 (E13) LVL RAFTER 0 900 CTRS
RB1 200 RFC STEEL BEAM
TR TRUSSES 8 900 CTRS
RWP 150 x 45 (E13) LVL WALL PLATE
* INDICATES MEMBER WITHIN ROOF DEPTH.
- All exposed tinber to be H3 treated.
- All exposed laminated Umbers to be service doss 3 or better
with ai end grohs sealed
- Miere trusses a rafters spaced at 900ctrs provide battens at
300ctrs to satisfy Health & Safety Regulations otherwise epace
trusses and rafters at BOOctrs
i - (CONT.) Indkxrtes Continuous over 2 spans or more. Spans to
i ^u)
iL
i' be no more a less th<r 20% greater than adjacent span for
ksi continuity.
I, (PU)
r IIII 'I
I !
I
I ,
H
H
H
H
IL
II
I
R1 rd
RBI
i=i==^-.-
u II
II
II
II
M f
TIE-DOWN SCHEDULE
MEMBERS___________ REQUIREMENT_______
ad It
R1
j Battens - Trusses 1 /Batten Screw
—< ►
II
II
II ll
Yr-
“-7
F
I
i Truss - Top Plate
Rafter - Top Plate
2/Fromlng Anchors
2/Framing Anchors
I
Top Plate - Slab M12 Rods, 1800 ctrs max.
II TR IR TR II 'I
Il u II Rafter - Roof Beam 2/Framing Anchors
li i <pu) Wall Plate - Stud Wall 2/100mm Batten screws
II --‘y Wall Plate - Block Wall M12 Bolts, 600 ctrs
U 2/M16 Bolts
(EP) U RWP I
Roof Beam - Posts
J— Tl Posts - Bearers 2/Ml6 Bolts U.N.O.
Non L/B Ext Wall 1/ConCrete Noil - 1200
RWP Comments:
Fri
DENOTES ’TECO SPEEDBRACE’ II
-k “ItPU) Batten Screw- No.14 Tjpe 17 Screw, provide 43mm min.
TENSIONED h FIXED TO RAFTERS penetration into receiviig member.
AND LOOPED AT ENDS. Maximum truss width 6.0m
h
1lw
TR
S =— Fdi
---- 11 I” 3 I!J>
ii All framing anchors and straps to have 4/2.8mm0 nois
each end.
Roof truss design, bracing and girder truss tie-down by
F
truss manufacturer.
H
E'l R1 All Umber bolt holes are to have 80mm min. end clearance.
a: Il [“rT Any timber connections not nominated within these plans
shall be in strict accordance with AS1684.2-2010:
_-3
h H_
F!- R1<> Residential timber-framed construction.
1
h
-
/
l|“
i|
1li (PU) I RBI 1
L M
rlL-
_ l!(pu)
ROOF FRAMING PLAN
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 32038-N.
AU BRACING WAUS TO BE
LEGEND ENGAGED TO ROOF/FLOOR ANY CONNECTION DETAIL NOT NOMINATED
ALL BOLTED DMBER CONNECTIONS ARE VIA SHEAR BLOCKING AS SHAU BE IN STRICT ACCORDANCE WITH
l/b indicates load bearing wall under.
TO HAVE 5 x D MIN. END CLEARANCE. DETAILED ON STANDARD AS1684.2 RESIDENTIAL TIMBER FRAMED
WHERE D = BOLT DIAMETER. BRACING SHEETS FD1.1 CONSTRUCTION. Revision Description Date
(PU) INDICATES SUPPORT POST UNDER REFER WALL Issue:
FRAMING PLAN FOR SIZE. PRELIMINARY
(LU) INDICATES UNTEL UNDER REFER LOWER WALL
Unit 1/11 Project Ave,
FRAMING & BRACING PLAN FOR HPE/SIZE. Noosa Heads
Ph (07) 5455 5604
emal:[email protected]
CONSULTING web:www.scg-engineers.com
ENGINEERS ABN 40 098 481 899
Title:
ROOF FRAMING PLAN
Project
31 Edward St
Noosaville
0 2
1 3 4 j5m1:100 © A2 s Date: Drg No. Rev.
£ Oct 2023 32038 -S6.1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.