Attachment 3 - Engineering Report · MCU23/0030

of 45

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

GENERAL NOTES:                                                                                                                                                                SEWER RETICULATION NOTES                                                                                  WATER RETICULATION NOTES
1.   ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH                                                     1.        NOT ALL SERVICES HAVE NECESSARILY BEEN RECORDED AND SHOWN ON            12.   SURFACE LEVELS SHOWN ON LINES ARE INTERPOLATED FROM A SPOT            1.    RETICULATION MAINS ARE TO BE LAID AT 1.50m OFF PROPERTY
     EAST QUEENSLAND SEWERAGE CODE SPECIFICATIONS AND STANDARDS.                                                                    THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO LIAISE WITH THE                LEVEL SURVEY, THEREFORE DESIGN LEVELS BASED ON THIS                         ALIGNMENT UNLESS OTHERWISE DIRECTED BY COUNCIL ENGINEER.
                                                                                                                                    RELEVANT SERVICE AUTHORITY PRIOR TO COMMENCEMENT OF                           INFORMATION MAY BE VARIED BY THE SUPERINTENDENT ON SITE.              2.    ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT
2. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH                                                                                                                                                                                                                        SOUTH EAST QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND
   THE RELEVANT AUSTRALIAN STANDARDS.                                                                                               CONSTRUCTION TO DETERMINE THE LOCATION AND LEVEL OF ALL EXISTING              CONTRACTOR TO ENSURE SEWER MANHOLES TO BE APPROX 50mm
                                                                                                                                    SERVICE UTILITIES. THE CONTRACTOR SHALL BEAR THE COST OF ANY                  ABOVE FINISHED GROUND LEVEL IN ALLOTMENTS AND FLUSH IN ROAD                 STANDARDS.
3.   THE CONSTRUCTION OF THE SEWERAGE WORK SHOWN ON THIS DRAWING SHALL                                                                                                                                                                                                                  3.    UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL
                                                                                                                                    DAMAGE TO EXISTING SERVICES.                                                  RESERVES (UNO).
     BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. SEWERAGE                                                                                                                                                                                                                         COMPLY WITH THE RELEVANT AUSTRALIAN STANDARDS.
     WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE PERMITTED TO                                                                                                                                                                                                                 4.    ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.
                                                                                                                          2.        THE CONTRACTOR SHALL OBTAIN ALL AS-CONSTRUCTED SURVEY FOR               13.   ALL MANHOLES TO BE STANDARD 1050 DIAMETER U.N.O.
     CONNECT INTO UNITYWATER SEWERAGE SYSTEM.                                                                                                                                                                                                                                           5.    COVER ON MAINS FROM PERMANENT LEVEL TO BE AS FOLLOWS: -
                                                                                                                                    ROADWORKS, DRAINAGE WORKS, SEWER MAINS ETC. PRIOR TO
4.   ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE                                                             BACKFILLING. ALL SURVEY TO BE CARRIED OUT BY A LICENSED SURVEYOR        14.   ALL CONCRETE MANHOLES TO BE SEALED WITH 6.5mm THICK GREASY
     CARRIED OUT BY UNITYWATER AT THE DEVELOPER'S COST.                                                                                                                                                                                                                                                                    NOMINAL DIAMETER
                                                                                                                                    TO THE REQUIREMENTS OF THE SHIRE ENGINEER.                                    HEMP ON COMPLETION OF THE MAINTENANCE INSPECTION.                                         LOCATION
5.   ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE                                                                                                                                                                                                                                                        ≤150   ≥200
     "ACCEPTED PRODUCTS AND MATERIALS" LIST.                                                                              3.        PRIOR TO ON & OFF MAINTENANCE INSPECTIONS THE CONTRACTOR SHALL          15.   EXTERNAL FORMWORK IS TO BE USED FOR CAST INSITU MANHOLES.                             NON-ROADWAYS          600    1000
6. EACH ALLOTMENT SHALL BE SERVED BY A DN110 PE (OR DN100 PVC) PROPERTY                                                             PROVIDE CCTV INSPECTION DATA IN ACCORDANCE WITH WSA PART 3                                                                                                          SEALED ROADWAYS       600    1000
   CONNECTION. FOR ALLOTMENTS OTHER THAN SINGLE RESIDENTIAL, A DN160 PE                                                             SECTION 22.7.                                                           16.   MANHOLE LIDS TO BE SLOPED TO SUIT THE DESIGN FINISHED SURFACE.                        MAJOR ROADWAYS/
                                                                                                                                                                                                                                                                                                                              750    1000
   (OR DN150 PVC) PROPERTY CONNECTION SHALL BE PROVIDED.                                                                                                                                                                                                                                                EMBANKMENTS
                                                                                                                          4.        DETECTABLE MARKER TAPE SHALL BE PROVIDED EITHER ABOVE THE               17.   MAXIMUM DEPTH OF HOUSE DRAIN INSPECTION OPENING - 1.5m.                               FREEWAYS              1200   1200
7.   PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN                                                             EMBEDMENT ZONE OR 1000 BELOW THE FSL, WHICHEVER IS CLOSER TO
     IN THE DRAWINGS.                                                                                                               THE FSL.                                                                18.   ALL ALLOTMENTS WITHOUT EXISTING HOUSE CONNECTIONS TO BE               6.    CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD
8.   PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A                                                                                                                                                PROVIDED WITH HOUSE CONNECTIONS UNLESS NOTED OTHERWISE.                     DRAWINGS.
     MINIMUM OF 500mm AND A MAXIMUM OF 750mm.                                                                             5.        ALL LEVELS, CHAINAGES AND DISTANCES ARE IN METRES.                                                                                                  7.    A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS TO BE
                                                                                                                                                                                                            19.   LOCATION AND LEVEL OF EXISTING SEWER CONNECTION POINTS TO BE                INSTALLED AT THE SERVICE POINT OF EACH LOT IN ACCORDANCE WITH
9.   WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS
                                                                                                                          6.        REFER SEQ-SEW-1200 SERIES FOR BEDDING AND BACKFILL                            CHECKED BY CONTRACTOR BEFORE WORK COMMENCES.                                THE STANDARD DRAWING FOR THE SEQ-SP.
     NOT EXCEEDING 300mm (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE
                                                                                                                                    REQUIREMENTS.                                                                                                                                       8.    ALL MATERIALS USED IN THE WORKS SHALL COMPLY WITH THE
     COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION
                                                                                                                                                                                                             20. NOT MORE THAN ONE DN160 SEWER OR NOT MORE THAN TWO DN110                     SEQ-SP's ACCEPTED PRODUCTS AND MATERIALS LIST OR BE
     WHEN TESTED IN ACCORDANCE WITH A.S. 1289 (MODIFIED COMPACTION).
                                                                                                                          7.        REFER SEQ-SEW-1300 SERIES FOR MAINTENANCE STRUCTURE TYPES AND                PROPERTY CONNECTION SEWERS SHALL BE PERMITTED TO CONNECT TO                  APPROPRIATELY SHOWN, LISTED AND DEFINED IN THE ENGINEERING
     TESTING SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER. IN ALL SUCH
                                                                                                                                    DROPS AND FOR RIGSS COMPLAINT APPURTENANCES.                                 THE MS RISER; EACH CONNECTION SHALL BE LOCATED AT A DIFFERENT                SUBMISSION SO THAT THE ALTERNATIVE PRODUCT OR MATERIAL CAN
     CASES APPROVAL OF CONSTRUCTED SEWERS WILL NOT BE ISSUED BY THE SEQ
                                                                                                                                                                                                                 LEVEL.                                                                       BE ASSESSED AND IF APPROPRIATE, APPROVED BY THE SEQ-SP.
     SERVICE PROVIDER UNLESS CERTIFICATES ARE PRODUCED CERTIFYING THAT
                                                                                                                          8.        PIPE MATERIAL TO BE SPECIFIED AS REQUIRED BY RIGSS (PVC). PN12 PVC-U                                                                                9.    THRUST BLOCKS TO BE PROVIDED ON ALL BENDS, TEES AND DEAD
     THE REQUIRED COMPACTION HAS BEEN ACHIEVED.
                                                                                                                                    TO BE USED WHERE SEWER MAIN IS GREATER THAN 3.0m IN DEPTH OR             21. PROPERTY CONNECTION SEWERS MAY BE CONNECTED TO THE SEWER                     ENDSAS PER STD DRG SEQ-WAT-1205-1, 1206-1 AND 1207-1.
10. WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR STEEPER, BULKHEADS SHALL BE                                                                                                                                                                                                                 10.   PAVEMENT MARKERS TO BE IN STALLED AS PER STD DRG
                                                                                                                                    WHERE LAID WITH REDUCED COVER.                                               WITH AN APPROVED 45° SADDLE AND A 45° SHORT RADIUS BEND. THE
    CONSTRUCTED IN ACCORDANCE WITH THE SEQ SEWER CODE.                                                                                                                                                                                                                                        SEQ-WAT-1300-1 AND 1300-2.
                                                                                                                                                                                                                 MAXIMUM LENGTH OF THE PROPERTY CONNECTION SEWER SHALL BE 25m
11. THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING                                                        9.        REFER SEQ-SEW-1104 AND SEQ-SEW-1105 FOR PROPERTY CONNECTION                  AND SHALL EXTEND A MINIMUM OF 0.5m AND MAXIMUM OF 0.75m INTO           11.   DETECTABLE MARKER TAPE IS REQUIRED TO BE INSTALLED ON ALL
    SERVICES WITH RELEVANT AUTHORITIES BEFORE COMMENCING WORKS.                                                                     TYPES.                                                                       PROPERTY                                                                     WATERMAINS.
12. SEWERS SHALL BE DISUSED /ABANDONED IN ACCORDANCE WITH PROCEDURES                                                                                                                                                                                                                    12.   ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.
    SET OUT IN THE SEQ SEWER CODE.                                                                                        10.       DETAILS OF STANDARD DN150 LONG RADIUS PVC BENDS ARE SHOWN ON             22. MAINTENANCE SHAFTS OR TERMINAL ENTRY POINTS SHALL BE LOCATED           13.   TEST/CHLORINATION POINTS TO BE INSTALLED IN ACCORDANCE WITH
                                                                                                                                    STD DWG SEQ-SEW-1314-3.                                                      AT THE UPSTREAM END OF ANY SEWER WHERE THE DISTANCE TO A                     STANDARD DRAWING NO.SEQ-WAT-1410-1.
13. BENCH MARK AND LEVELS TO AHD.                                                                                                                                                                                                                                                       14.   THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON
                                                                                                                                                                                                                 DOWNSTREAM MS IS GREATER THAN 40m. STOP ENDS SHALL BE
14. EXISTING ALLOTMENTS REQUIRING A PROPERTY CONNECTION FROM EXISTING                                                     11.       PE SEWERS SHALL BE PE100 MIN SDR21 TO AS/NZS 4130. VC SEWERS                 PROVIDED AT THE UPSTREAM END OF ANY SEWER WHERE THE DISTANCE                 THIS DRAWING MUST BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ
    SEWERS SHALL BE PROVIDED BY UNITYWATER AT THE DEVELOPERS COST.                                                                  SHALL BE CLASS 4 TO AS1741 OR CONFORM TO EN295-1. UPVC SEWERS                TO A DOWNSTREAM MS IS LESS THAN 40m. THE STOP END SHALL                      REGISTRATION. WORKS NOT COMPLYING WITH THIS REQUIREMENT
                                                                                                                                    SHALL BE SN8 TO AS1260, EXCEPT FOR DN100 WHICH SHALL BE SN10 TO              COMPRISE A RUBBER RING SEAL SCREWED CAP FITTING WELDED INTO                  WILL NOT BE PERMITTED TO CONNECT TO THE RETICULATION SYSTEM.
                                                                                                                                    AS1260. DICL SEWERS SHALL BE CLASS PN35 TO AS2280 AND                        SEWER PIPELINE.
                                                                                                                                    POLYETHELENE SLEEVED.
                                                                                                                                                                                                             23. PROVIDE THE FOLLOWING MINIMUM HORIZONTAL SEPARATION FROM
                                                                                                                                                                                                                 SEWER RETICULATION:
      ALL ENVIRONMENT PROTECTION MEASURES SHOULD BE IMPLEMENTED                                                                                                                                                         STORMWATER PIPES - 1.0m
      PRIOR TO ANY CONSTRUCTION WORK, INCLUDING CLEARING, COMMENCING.                                                                                                                                                   WATER SUPPLY - 1.0m

                                                                                                                                                                                                             24. CCTV INSPECTION REPORTS TO BE PROVIDED TO UNITYWATER PRIOR TO
                                                                                                                                                                                                                 APPLICATION OF CERTIFICATE OF COMPLETION.




                                                                            REV         DATE                                        DESCRIPTION                  BY    CHKD                                                  PROJECT:                                              DRAWING TITLE:

                                  P 07 5443 4443
                                                                                A      14/02/23      CLIENT NAME REVISED                                        EPW    BWM
                                                                                                                                                                                                                             PROPOSED RESIDENCE                                    SEWER AND WATER NOTES
                                  E [email protected]                                                                                                                   ................      ................       at 50 NOOSA PARADE, NOOSA HEADS                                                                                        CONSULTING
                                                                                                                                                                                     CHECKED           DIRECTOR APPROVAL
                                  W walsheng.net.au
                                                                                                                                                                                                       RPEQ ‐ 4665           for PETER PULJICH
       CONSULTING                 A 15/72 Wises Road, Maroochydore Q 4558
                                    PO Box 5512, Maroochydore BC Q 4558
                                    A.B.N. 39 611 482 716                                                                                                                               FOR APPROVAL                         C                                                     DRAWING No:   C6398/23/S02                                  REVISION:    A
                                                                                                                                                                                         NOT FOR CONSTRUCTION
                                                                            FILENAME : C6398-23-S02.dwg - DATE : 14/2/23 - 9:07am                              A1 Sheet Size   Design: BWM     Drawn: BWM   Date: FEB 2023                                                         COUNCIL REFERENCE:                                          SHEET:      2 of 2

Used in these records

About this file

File size
13.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3 - Engineering Report.pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.