Table 6.4a -State Planning Policy Trigger Questions
SPP Trigger Response
MCU with Land Area >2500m² No
- That results in >25% Imp Area N/A
- That results in ≥6 Lots N/A
REC with Land Area >2500m² and >6 Lots No
OPW with Disturbed Area >2500m² No
The above Table 6.4a demonstrates that compliance with SPP water quality objectives is
not required for the proposed development.
It is proposed to install a rainwater harvesting tank to collect roofwater and driveway
runoff. Groundwater seepage collected within a sump-pump collection system will also
discharge to the proposed rainwater tank. Harvested rainwater is to be used onsite with
connection to be made for non-potable uses and/or outdoor irrigation. A total of 6,000L
of rainwater harvesting is proposed.
Where not precluded by site conditions, it is proposed to direct hardstand areas to
landscaped areas for water quality buffering and gross pollutant removal prior to
discharge at Noosa Parade road reserve.
9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.