Attachment 1 - Updated Plans
Plans and drawings: the text below has words only, no drawings.
NEW METAL ROOFING, SARKING, ‘se sags ae steep andy rotbe copes ed
ROOF AND PARAPET HEIGHTS INSULATION TO EXISTING UPPER GabraihSeokPyLie
TO REMAIN AS EXISTING ROOF STRUCTURE
38 NEW PREFABRICATED CAPPINGS, APRON
—_ FLASHING FIXED TO NEW ROOF SHEETING. .
‘SARKING AND INSULATION TO BE LAPPED
UP THE PARAPET WALL ne
a 7s /0: NEW POLYESTER ~~ -
g INSPECT ALLROOF PURLNS FOR (03, Pownencon aluunum
y CORROSION. REPLACE /REPAIR ~ - ~ — C PERGOLABATTENS =
3 — — WHERE REQUIRED NX g
5 we za Z|
g ~ — LINE OF ROOF 3
Ne SO SHEET BEYOND 3
2 STORAGE e o
= < CUPBOARD REPLACE THE MOISTURE LIGHT
2 DAMAGED FASCIA BOARD NEW POLYESTER
& AND GUTTER 8 POWDERCOAT
w g ALUMINUM
3 REPLACE DOOR AND a PERGOLAFRAME
2 FRAME. INSTALLA SILL
& STORAGE FLASHING
CUPBOARD Sesto NEW GRATED DRAIN
CUPBOARD NEW WATERROOFING, _ eR he -~---___ JN) J fee te
——————— eee Ee TOPPING SLAB, AND TILE ==
ROOF TERRACE - SRL 46516 FINISH
co NEW DOOR, FRAME, AND
ES 2855 BB - - - --- Be -----4 EXISTING CONCRETE HARDWARE
DINING © [Bl 27777 Brrr tte DINING ROOF TERRACE SLAB vom
ROOM ll2222 PLL 222 ff ROOM / 02 \ UPPER ROOF SECTION
BELOW en TTT BELOW \ ] SCALE 1:50 @A3 UPPER ROOF WORKS
/ 4 NEW PREFORMED PARAPET REPLACE ROOF SHEETING, NEW PREFORMED PARAPET NEW PREFORMED
{ 01 \ UPPER ROOF SECTION 38 CAPPING. HEIGHT TO REMAIN SARKING, AND INSULATION. ROOF CAPPING, HEIGHT TO REMAIN PARAPET CAPPING.
\ } SCALE 150 @A3 UPPER ROOF WORKS ___ 4s EXSTING HEIGHT TO REMAINAS EXISTING _ AS EXISTING HEIGHT TO REMAIN
\ “TY . Totter eee 2 1) REPLACE METAL FRAMED PERGOLA AND AS EXISTING
— wu ~ ~ em HEIGHT - SCREENING MEMBERS. HEIGHT OF PERGOLA
& CENTRELNE OF HE UPPER SMT ~ <> A TO REMAIN AS EXISTING. NEW MATERIALS: REPLACE ROOF
a ~-[-- SHEETING, SARKING,
¢ qq [ROOF (UNITS 9 10) NEW GUTTER AND FASCIA — POLYESTER POWDERCOAT ALUMINIUM ANDINSULATION.
ea — ROOF HEIGHT TO
REVISIONS - 38 (01 4 REMAINAS EXISTING
REVISIVNG 3
a - 23 (a0 | INFILL GLASS
as PANELS: {
[7 NEW STRIP =
— @
DRAI DECK o INSTALL INFILL GLASS 8
o : £ PANELS TO THE TOP OF THE
PROPOSED NEW ROOF ————~- : a PARTY WALL
OVER BALCONY / ROOF NEW Pvc DOWNPPE
TERRAGE ACCESS STAR DISCHARGING INTO GRATED NEW
DRAIN 2 GLASS
PROPOSED LINE OF NEW PANELS
ROOF TRUSS REPLACE GLASS PANEL
NEW DOORS, FRAME, AND
> ROOF TERRACE - SRL 46.516 HARDWARE
~ ”ATED DRAIN ff
PROPOSED NEW
GUTTERS AND
DOWNPIPES
REMOVE PARAPET WALL
AND INSTALL NEW GLASS
EXISTING ROOF ACCESS STAIR CORE.
CRACK REPAIRS AND PAINTING WORKS,
&
PANEL BALUSTRADING REPLACE LIGHT FITTINGS AND. fo — \
P LAN N | N G EASTING CONCRETE ELECTRICAL GPO'S WHERE REQUIRED / 03 \ UPPER ROOF ELEVATION
BALCONY BEDROOM BELOW |
NOT FOR CONSTRUCTION BELOW \ o SCALE 1:50 @ A3 UPPER ROOF WORKS
Martin Galbraith MAIB FRICS m: 040s 956 657 PROPOSED UPPER ROOF DATE: 22.08.2022 DRAWN: GD
Powers conn tor suegmo encom UPPER ROOF SECTIONS sections & ELEVATION Sel 150 @AS_ CHECKED -
Noosa Heads, QLD 4567 www.galbraithscott.com.au PROPOSED ROOF oa PROVEN DRAWING NO. Issue
Cc ting Chartered Build: QBCC li 1229775 - Bi OQ; id Pr + Mc it S¢
Genstruction Speclllsts and Project Managers sence ie 6- 16 DOUGLAS STREET COTE D'AZUR cD 3.01 -
SUNSHINE BEACH, QLD at Sunshine Beach : [as|
L L L L | 50mm [400mm [150mm ON ORIGINAL A3|
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.