Council archive · source document
05.1148 Generally in Accordance Plans · 132005.1148.03
Plans and drawings: the text below has words only, no drawings.
Very large file (10.5 MB): may take a few minutes to open.
EXTERNAL FINISHES LEGEND
(refer ta A4 schedules for material description} designers
aluminium screen.
aluminium framed louvres, refer sched.
5 20 Duke Suest
aluminium louvres, refer sched. Sureinne Beach G0 4567
aluminium framed slider, refer sched. PO Box 262
ont ‘Noose Heads OLD 4567
aluminium framed door, refer sched. ee
_. : Teophone OP $44? 5633
aluminium framed window, refer sched. Fecteie 075447 5833
balustrade type 1, refer detail. info 80m au
balustrade type 1, refer detall. eimalgaer one a
masonry blockwork. Teomepabbenin
ceiling fining. carpe veh Errries Drags &
Repos
concrete slab.
i é Conenucton is sorely
le Sa down pipe, veh obs SAAR
i . +2 ate he fibre cement external cladding. SCoEe use
” ~ fascia gutter. a
' sy : Verly al orermara cn
| x. metal awning, refer detail. (pia pres b cornea en
gy i of any works Theo
' ye sate, a metal roofing. | dawngunadibts
| Tg fale cme & natural ground line, sey
7 verber faces, pank fresh é parapet wall, damrgscenon ha
AIH Seewg hr === ‘i 5 propery of fm authors
fo shat soft pant : ridge capping.
. i paste , OMSL
ql _ Shueiad Werdargs | rain water head, refer detail. eerie
wih Part 39.7 be BOA ~ ‘ soffit ining Sreard Engne
ss 7 Contact
| structural footing, refer engineer. Pare
‘ limber deck. Suet
tapered exp, rafters ae
. timber floor. ied
basin Bistenadn ests turbo vent.
wath 39208 A a. a
150 ms @®) wealherboard cladding ee oe
wit ~~ Shore
| ; ap0el Gawd eg Emi
Tt CELE Corr. indian: Y = SS ee Hanser
tele sogenecformembeme Ff = 8 inn
balustrade & harden im accordance ie Emat
wath Part 3.9.2 of the BOA, B
1.190 \
20-59 Loner Level i
Seo ee ea Ge el i
___. Suspended conerele structs, ‘
tatee engaveer i
| Hate. the pool is fuly carthevered oer
tha 18m gedback with no footings O°
G4 Chard Revans 07.12.19
/1.\SECTIONA =
\WD.601/ SCALE1-100 . Co-demve to Chant 21.25.10
Generally in Accordance with me
PROPOSED HOUSE
Approved Plans of Development _
28 PARK CRES.
ws #8 SUNSHINE BEACH
os i ee HEGARTY
Dramieg Te
SECTIONS
Sade Dae
as shown @A2 Date
Orawn By wo Ne
DOT 0221
Draven ho fracho
WD.601 (4)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
\ \
\ \ Hooea Heads Q.0 4567
\ Telephone 07 A? BIS
\ \ Facemia 07 547 5893
\ 4 ™
\ \ ako
nw SSS \
Tedaagactansis
\ a eetoret
te
Th pool hi cantievtred ove
tba tem sebick wth no foetnge oF Le Xe TT pom SeTeAk \ Ceroneton eer
/ cowaze tavindifes 2000 108 on ee J seth lank SAAS
—_— a BCA Cadet & stati’
ae oe) ‘. ‘ Ba SE
a as
= \ \ \ Met rrr
‘ pnGE e ccerrmesemert
x \ of ry wert, Ts
\ - manufacturers speofcaton. shalow end of pook \ \ emirge are tek bot
7 : __ oe ued ir wary
Lk , a ; a \ Copyright or dange &
| iS 7~Pe ==.
‘ om | -4 —- ! a
i eng of SENaL eee aeons poot lenoe 19 AS and BCA \ SOBLTNTS
1 I z regarnenacds. a Setul frome
: t & | =
\ 4 | z x 10x12 Fare! ' ent
! z 0 x 1.2 kameless glass poo vate wr erat
; i i a a 3% STORAGE maga lath DAS wnd BCA ogacomonte | Saree
Bay { J \' g 2 =
Sg BG i. =
or | BE rammed glata stan door gis —
oO : | sir g tele I sik x= Pat Corer
x : 7 8 4% | ba =S cert
[<a 3 a g | > Ent
qi 8 3 * beraric ere
oii . $93 4 sumer ! < carted
; laa; 384 twee ee ( re
_ > ad
7 a ‘
a a athe peer os glesx balustrade m accordance \
ig x age ceeuste wih Pat 33201 the BCA 4h
io es Note: \
! : oe 9 No building footings to be
A q iconstructed within the 15m N
tot 7 | Setback zone,
oe 3 = |
1 & “~ + ~.20msg \
“SETBACK
to — Lim SETeacK | {
bony ~OMSE
VG a 2093 yd
Ht 4098,
I i momzfe. \
to 5 B97. 1M ye 18002 £00 100 490 200, 3,900 |
fo Wt ey z
——]
3,000 [- Ch Chark Revere OF1246
| CS-thert Raveena 210-10
Generally in Accordance with
Approved Plans of Development
OS YW #E
aL
CPteose fo Chant 102
Clots to SOG 06-0210
Prowd
PROPOSED HOUSE
‘Lecaben
28 PARK CRES
SUNSHINE BEACH
Check
HEGARTY
Craaing Tee
SUBFLOOR PLAN
Sale Dats
as shown @A2 Date
Craan By soe
DOT 0221
Drawing Hee soe ie
Page 3
(ey
7210.
driveway
sac
xe
GROUND FLOOR PLAN
SCALE1°100
\
\
\ «ao
42,000
\
. \
79°0 {BACK |
om geTeack,
sm Sse Teasers
a aA
oT Ste”
yg ee ee \
Te | \
bl \
3 \
elected nan rebctre metal clacking, £5 \
by own 4 @ &
{
|
LUVINGt = _ I
Eira 2 ! wu
F220) x ! >
8 cocczale, : 7 I ge y
a s : SF 7 86
KITCHEN ! =
a | =
3 | <
au ‘
mk % (8)
E-\—4 LL \
A> SEPT npatag200BCA \
ade inf. \
concrete slope, p_ ralectad non sefective mata cladding,
| __maserey gardan wall Ba by ower *F tol \
— 61.5 —— al 3
me ——— a
Daal wall panel evant eee — 4. \
snurcondance wets 1 [redacted nan toecitve metal acc =
martocaws ection, | —E—E brewer fSecaein . \
220s 5 3!
00. — —
8a, i203 —— Qe — ~~ On sere Ag \
3 OEE ~ isnsereage—] |
2 — 3.074 SETBACK
| 8 ee 2 “|
5 |
100 J ,200 5,700 200 1,000 400 12417 400 \ _
100 5,900 43.817 3,900 42,000 [~
5
Generally in Accordance with
Approved Plans of Development
OSYCFE
a
Noota Haads OUD 4567
Faetone OTST GERD
Frere 07 5447 $893
Trsdawy a bbeain
sarprctco wth Engreen avenge &
Repeats
Comnatenio corey
vets cnerast SAAB.
BOACadee & sarstard
Bh Byte 9753 a
are
Veta deerorson
i
C4-Cherk Revere 07-47: 10
C3 Cheast Rarotiors 2540-19
Ca-tean to Chenk 21.0259
Cif fo SCO DEE IO
Proved
PROPOSED HOUSE
Locaton
28 PARK CRES
SUNSHINE BEACH
Chee
HEGARTY
Crnwey Tito
GROUND FLOOR
PLAN
Seaie Oe
as shown @A2 Dale
Oener By ke
DDT 6224
code) eae
WD.202 (4)
Page 4
designers \ 20 Duns See Sunsters Beach G.0 4567 Thedargeigberade coneredcn et: Ergin ante \ Rept \ Coneturkent corel wh ah celeak SAAB \ BCA Codes & stances Bldg By aw 1975.4 oe wth Pat 3.9.2 of tt BCA - \ Vecty d deverexre co wall z Ightregtt a ch any werk Thess fin amrgarempts non edecte metal di . i \ = - fos olteing below a * tanngenaman hs 3150 i E s. 100.2150 100 yy, 1,000 4199 AVMHILVd i i 2 # Joinery 8 sanvtary bxtures by cuter \ | (Dunoal wal panel gyttarn | selected non reacts matal cacking, et \ come , oie a. B ~~ ResermaoK ~~ CSETEAGK \ s r = Ch Cand Rayecane 07-1210 Ch-Clant Rarer 2510-10 ‘CtAwon bo Chet 21-0810 Ch-tawwe bb SEG OOD Progact PROPOSED HOUSE . . 28 PARK CRES Generally in Accordance with SUNSHINE BEACH HEGARTY auton The Approved Plans of Development FIRST FLOOR PLAN OS Lr FE wa om Z as shown ate = a Orman By ONS ODT 0221 (om) FIRST FLOOR PLAN metal SCALE 100 WD,203 C4)
Page 5
‘saieotad noe rebsclirs mata ccking
Dy owner
75030 Fst Floor
Haas babs ade i accotdance
| [24000 Ground Fleer
tol farce fa AS and BCA
requrernscts
1021.2 hamalaes glass pod gaa wi:
nog atch 19 AS and BCA requaveerarts,
[20130 Loner Lovet |
Ug <= =e Se oe L
ass bakistrade n accordaca
wihPat 39 2ofte BOA
Neto tbe pod i fully cantlevared ove
sruchre founded m tes eatback 200
{_\NORTH ELEVATION ‘
WD.S01/ SCALE:100
(2 EAST ELEVATION
\WO.S01/ SCALE1 100
wth Pat 3920 BCA
the 15m setback wih no loetngs ap -$-09 a
oe arn nn BY GL
ightwegh wal bakastiade DECK 3
pantins
DECK 1 Z LMIEG 2 P|
Lo LI
a
POOL & .
fess belertradie n accordance
veh Pat 39 20! he BCA, talaciad non efacthns malal cackieng
by once
ying wall balustrade
Igheveeght wal babictrade
pant fessh.
Spa Feate pant Enoch
pen i = Seas
BE
= snloctad non relectve ewil ey,
by ove.
lnredscape steps
glass bahoorade m accntdince
veth Part 3.9 2of we B.C A
123,089 Ground Fioor
vi
Darcal wal posal syrtecs.
ucxordance wih
cmurefacke we specication.
aztyhc pool panel window,
taler contracted poo bukdet
lass balustrade in
wethPat 36 201 he CA,
ote, the pools hy cantievered over
the 14m sutback with no foobngs
sdructure founded in thes satback zona
Deeiped wail prnad ayctoer
— faccerdance with
mantectrers sprctaton
EXTERNAL FINISHES LEGEND
{refer to Ad schedules for material description)
aluminium screen.
aluminium framed louvres, refer sched,
aluminium louvres, refer sched,
aluminium framed slider, refer sched.
aluminium framed door, refer sched.
aluminium framed window, refer sched
balustrade type 4, reler detail,
balustrade type 1, refer detail,
masonry blockwork.
ceiling lining.
concrele slab.
down pipe,
fibre cement external cladding.
fascia gutter.
metal awning, refer detail,
metal roofing.
naturel ground line.
parapet wall.
ridge capping.
rain water head, refer detail.
soffit ning
structural footing, refer engineer,
timber deck.
tapered exp. rafters
timber floor.
turbo vent.
weatherboard cladding
Generally in Accordance with
Approved Plans of Development
OYA FES
—Z.
Me
designers
2 Dake Senet
0 Box 252
Hoosa Heads OG
Taeorom 07 540
Facute 075447 8833
snloGetuddoo com au
Tusdaagebbsaain
sonencion wih Engrisers Cranangs &
Repors
Consnedante omply
Ch Choe Ravine 0712-09
CR ent Raver 2519619
(Cetatde Chart 21-09-10
Ctdemus b SOG 0629-10
Proved
PROPOSED HOUSE
ovate
26 PARK CRES
SUNSHINE BEACH
Chard
HEGARTY
Deawieg Tito
ELEVATIONS
See Cate
as shown @A2 Date
DrmanBy kb ie
OoT 0221
Drang te rasta
WD.501 (C4)
Page 6
kidd
+CO
2 ees EXTERNAL FINISHES LEGEND
selected 00 raactve mata lading
by Onna
refer (0 A4 schedules for material description)
Decal wal penal etiam maccortance wh ( ) .
mmarutechewe spectcator 7 BSH Spreng hi - designers
BOTTOM __ ee ee eee oS aluminium screen.
a 1 i
=o Ae . 5 iid SSE | aluminium framed fouvres, refer sched.
(By me = we) a EI DECKS soph wa bactace _ _ tated rn tect mail dating aluminium louvres, refer sched, 2000 Seat
~ y GARAGE wis E = bala | aluminium framed slider, refer sched. sohecheen rt
Jost of pee masorry qartec wall 4 | = aluminium framed door, refer sched, Lecra ey LDA
i | aluminium framed window, refer sched. Telephone 07 $44? $633
takes ache lg balustrade type 1, refer detail. Fecemde 07 S447 $833
sy sora ig om — ~
PEDECK? -——- ooh 382 he BCA & balustrade type 1, refer detail. nlf. oe _
oi | masonry blockwork, YA568.007
Jeciga for floor below 23.080 Grand Foor . fe nena
as = ceiling lining. Tadurganpensie
Da weal panel eyeter, wnenotderen wl concrete slab. eee
mandactue specication | anaiti
DECK 1 gest baited ig. lown pipe. crmesbos
ny Pato MAC A Is fibre cement extemal cladding, sede.
ZADlower teva | > fascia gutter. ; Babee wake
2 aes ee ee Se WNé metal awning, refer detail. Vety al derenexne cn
is pra bb conrmencerect
metal roofing. / e Seas git
natural ground line, ovary ara nek oe
parapel wall, Soaieene
fidge capping. drannganaran be
rain water head, refer detail. ee ae
soffit lining
structural footing, refer engineer. Seuatnee’
timber deck. Li
ER tapered exp. raters Suet
GE timber floor. tome
turbo vent, ea
> weatherboard cladding
Private Coc tr
Contact,
Prone
ms ©
“4. \SOUTH ELEVATION . | =
wo 502/ SCALE1 100
2200 TOW
Mo eis Sus
Ge Chee Revinons 0712-19
03- Chant Rarvatone 25.1049
Cietesua $2 Check 2108-10
Clam $06 06019
Girost wall panel system maccordanoe wih
Dinca wall panel syetarn, naccordanos wh maratpcunniy poafcation
munulechrtes mpecteaton
fe
iomatey yO mak
Propet
PROPOSED HOUSE
25,250 Garage Level
We ee eee eee
Location
28 PARK CRES
SUNSHINE BEACH
Chect
HEGARTY
Orang Tide
ELEVATIONS
Dae
fo 5 Seat
(2 WEST ELEVATION Generally in Accordance with maemen ow
W0.502/ SCALET100 Dewan By
DDT 0221
Approved Plans of Development (viop ROOF PLAN WD. 502 fe)
OSC/AB
arr ae.
Used in these records
05.1148 Generally in Accordance Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.