Council archive · source document
SUPERSEDED Minor Change Existing Approval MCU21/0117 01 & OPPW21/0199.01 · MCU21/0117.01
On Maintenance
106. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit
b. as Constructed details in accordance with Council’s Planning Scheme Policy
c. maintenance and operational manuals for all proprietary or site specific devices
Off Maintenance
107. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
108. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. A Council inspection reveals works do not comply with approval requirements
b. Submitted certification falsely states works comply with approval requirements.
5. REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Status Referral Agency and Referral Trigger Response
Address
Concurrence SARA at DILGP SARA Schedule 10, Part 9, The agency provided its
at DILGP Via MyDAS2 Division 4, Subdivision 2, response on 10 April
at https://prod2.dev- Table 4 – Development 2024 (Reference No.
assess.qld.gov.au/suite within 25m of state- 2402 – 39295 SPD). A
/ (for assistance, controlled road corridor copy of the response is
contact DILGP at 5352 attached
9701 or
email:[email protected]
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
PLANNING
Submission of Amended Plans Required
1. The conditions of this Decision Notice require resubmission of plan/s to Council with
amendments. Please address the amended plan/s to Council’s Development Assessment
Branch with the Reference No. MCU21/0117.01 separate to any development application.
Aboriginal Cultural Heritage Act 2003
2. There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
Page 17 of 31
Document Set ID: 23112081
Version: 5, Version Date: 17/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Minor Change Existing Approval MCU21/0117 01 & OPPW21/0199.01Related documentApplication case desk ↗
About this file
- File size
- 936 KB (small file)
- File type
No other editions are linked here.