Council archive · source document
Response to Information Request 10-6-2025 A6769-24-CA01 [B] EXTERNAL CATCHMENT LAYOUT · OPW25/0042
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
PERVIOUS = 1349m2
PERVIOUS = 2344m2
IMPERVIOUS = 2930m2
20
21
LOT 3 LOT 2 IMPERVIOUS = 3010m2
21
21
LOT 1
LOT 4
22 0.25ha
20
S
22
S
S
PERVIOUS = 2727m2
W
18
| | | | |
W CA 2/1
19.5
20.5
| | |
20
21
S
21
21
21.5
CATCHMENT | | | | |= |0.009Ha
| | | AREA
S
|
E
|
LOT 5 IMPERVIOUS = 3374m2
| | | | | | | D| | | | | | | | | | | | |
19
|
OS
|
W
|
22
|
CL
0.28ha
| |
19
TY
S
S
NI
20
W
E
ER
21
S
23
S
21.5
S
20
19
19
22
BANK
| |
S
S
W
| |
21
17
| |
W
21
20
| |
INT1
| |
D
| |
S
19 | |
CATCHMENT AREA = 0.415Ha
18
S
SIA A
| |
18 19
ASSUMED 20% IMPERVIOUS
| |
W
21
18
| |
20
| |
| |
| | 21
22
| |
19
W
VE
| |
20 S 21
21
| |
W | | 17
19
SERENITY CLOSE 7/1
21 20.5
18
18 17 21
> >
| |
| | D
| | 20
CATCHMENT
20
AREA = 0.2278Ha | | S 19
> 20
20
| | | | |
20
(PERVIOUS = 1236m2)
|
20
|
W
| | |
|
S |
| | 16 20 |
| | | | | | |
19
EXTERNAL19 LOT CATCHMENT INFORMATION
| 19.5
|
|
20 17
| | |
17 16
|
|
| | |
| | 18 19
19 19
| |
D 18
18 | | 15
19
| | 16 S | | | | | | 18.5
MODELLED
|
4A
18
| |
17
CATCHMENT DESCRIPTION 18 18
DIRECTION AREA
W
FRACTION
| |
17
S
| | 15
| 14
0.08ha 15
16
16 17 17 17 IMPERIOUS
16 14
15 D
17
17
13 16
14 15 LOT 1 ANCILLORY BUILDINGS, POOL, HARD
16 RUNOFF PIPED
16 TO SERENITY CLOSE STW NETWORK 0.53ha 80%
18 18
AND
15
SOFT LANDSCAPING TO RIP'S EMERGENCY OVERFLOW TO SERENITY CLOSE
S
13
12 14
| 15 15
13 12 14
|
18
13
ANCILLORY BUILDINGS, POOL, HARD
|
14
LOT 2 RUNOFF PIPED TO SERENITY CLOSE STW NETWORK 0.43ha 80%
||
11 14
13
W
14
12
AND SOFT LANDSCAPING TO RIP'S EMERGENCY OVERFLOW TO SERENITY CLOSE
|
11
15
|
13 14
BALANCE 6/1 16
||
17 10 12
19
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 section
Section 2
D
13
|
13
| |
| |
CATCHMENT AREA =
10
11 LOT 3 ANCILLORY
12
BUILDINGS, POOL, HARD Q100 TO RIP'S. EMERGENCY OVERFLOW NORTH TO POSCPW - -
12
S
16 9
||
| | |
12
0.0376Ha 9 10 11 AND SOFT LANDSCAPING TO RIP'S 12
||
10 10
|
|
11
ASSUMED 20% IMPERVIOUS 13
| | | | |
|
11
Q100 TO RIP'S.
||
9
LOT 4 ANCILLORY BUILDINGS, POOL, HARD 2.5ha 80%
.5
9 10
17
15
14
18
|
EMERGENCY OVERFLOW TO SERENTIY CLOSE
11
>
14 9 9 AND SOFT LANDSCAPING TO RIP'S 10
W
16
9
| |
15
| |
| |
| |
| |
12
LOT 5 ANCILLORY BUILDINGS, POOL, HARD Q100 TO RIP'S 2.8ha 80%
.5
| |
14
| |
| | EMERGENCY OVERFLOW TO SERENTIY CLOSE
| |
D AND SOFT LANDSCAPING TO RIP'S
SERENITY CLOSE 8/1 | |
| | S
14
|
| | |
16
8
|
10
S
| | |
13.5
CATCHMENT AREA = 0.1221Ha 13
|
| |
| | |
11| | 4A HARD
9
AND SOFT LANDSCAPING TO RIP'S Q100 TO RIP'S 0.08ha 80%
17
|
| | |
8
13
W
| | | || |
|
| |
EMERGENCY OVERFLOW TO SERENTIY CLOSE
|
9
| |
W
| |
13
7
| | 8
|
8
7
|
| |
|
|| | | 6
4B
8
ANCILLORY BUILDINGS, POOL, HARD Q100 TO RIP'S 0.08ha 80%
S 0 10 20 30 40 50
12
|
4B AND SOFT LANDSCAPING TO RIP'S EMERGENCY OVERFLOW TO SERENTIY CLOSE
W
D
13
S
10
0.08ha S
SCALE 1:500 (A1), 1:1000 (A3) 7
9
16 14
8
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL EXTERNAL CATCHMENT LAYOUT
FOR APPROVAL Date: AUG 2022
A.B.N. 91 611 354 511
26 Memorial Avenue, Cotton Tree PROPOSED HOTEL
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at 3-7 SERENITY CLOSE, NOOSA HEADS DRAWING No:
A6769-24-CA01 B 1 of
Email: [email protected]
for CALILE MALOUF INVESTMENTS
STEVEN HARRISON
B 12/03/2025 REVISED TO SUIT COUNCIL RFI - CATCHMENT TABLE ADDED PBL SKH ....................... Web: http://www.alta.net.au
A 27/02/2025 ISSUE FOR APPROVAL PL S.H. DIRECTOR APPROVAL Datum AHD
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE FILENAME : a6769-24-CA01 EXTERNAL CATCHMENT LAYOUT.dwg - DATE : 17/3/25 - 1:07pm - XREF's: X-BASE; X-SURVEY; X-ARCH 4 level01; X-SURVEY water; X-ARCH 3 ground; X-SURVEY retained trees; X-ARCH 1 basement; X-ARCH 2 lower ground; H-Approved-SH; H-Checked-SH Council Ref:
Used in these records
Response to Information Request 10-6-2025 A6769-24-CA01 [B] EXTERNAL CATCHMENT LAYOUT.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.