Attachment 3 - Geotechnical Report
FILL BENCH TO BE CONSTRUCTED DURING HOUSE PAD
EARTHWORKS:
* SITETO BE BENCHED PRIOR TO FILLING
PROPOSED ALL WEATHER DRIVEWAY WITH © CLEAN FILL TO BE PLACED IN LAYERS NOT EXCEEDING
PAVEMENTS TO BE SEALED WITH EITHER ASPHALT 200mm THICKNESS AND COMPACTED TO Min 957
PROPERTY OR CONCRETE WITH ADEQUATE SURFACE AND STANDARD COMPACTION WHERE NO STRUCTURES ARE
BOUNDARY] SUBSURFACE DRAINAGE - ALL DETAILS TO BE PROPOSED (IF STRUCTURES ARE PROPOSED COMPACT
CONFIRMED TO 98% STANDARD COMPACTION)
* APPROPRIATE COMPACTION TESTS TO BE CARRIED OUT
DURING COMPACTION
* _ FILLEMBANKMENT SLOPES SHOULD NOT EXCEED A ae
Im SLOPE OF 1 VERTICAL TO 3 HORIZONTAL (WHERE /
pm y GRASSED) OR 1 VERTICAL TO 2 HORIZONTAL IF
APRON SO EXT VER FOP SUITABLY ROLLED AND LANDSCAPED/ PLANTED - /
OF CUT EMBANKMENT UNLESS SPEC}FIED OTHERWISE BY ENGINEER /
/ CUT EMBANKMENT WITH HARD
CONCRETE SPOON DRAIN 1 SHALEY ROCK EVIDENT IN CUTTING
TO BE CONSTRUCTED AT TOP BUILDING PAD TO BE GRADED TO PROPOSED Ké /
OF CUT EMBANKMENT \ 1.5 MAX SLOPE AWAY FROM PROPOSED RESIDENCE ss 4
RESIDENCE AS REQUIRED PSu) >
<—\— h < < Ss UNSEALED TRACK
S
oy
PROPOSED FILL BENCH:
SPOON DRAIN TO BE CONSTRUCTED » / « _SITETO BE BENCHED PRIOR TO FILLING
ATTOE OF CUT EMBANKMENT 7 / * CLEAN FILL TO BE PLACED IN LAYERS NOT
SECTION AA PROPOSED EXCEEDING 200mm THICKNESS AND
CONCRETE COMPACTED TO Min 95% STANDARD
URN AROUND \ COMPACTION WHERE NO STRUCTURES ARE
ROCK SPALL/ SCOUR PROTECTION TO BE ea Js > PROPOSED (IF STRUCTURES ARE PROPOSED
CONSTRUCTED AT TERMINATION POINT N 4 COMPACT TO 98% STANDARD COMPACTION)
(OF SURFACE DRAINS é «APPROPRIATE COMPACTION TESTS TO BE
A CARRIED OUT DURING COMPACTION
Y SY + FILLEMBANKMENT SLOPES SHOULD NOT EXCEED
ROCK SPALL/ SCOUR PROTECTION st “LO _~ A SLOPE OF 1 VERTICAL TO 3 HORIZONTAL
NOTE: WHERE SURFACE DRAINS COMBINE SN, YY e NX (WHERE GRASSED) OR 1 VERTICAL TO 2
xy HORIZONTAL IF SUITABLY ROLLED AND
ALL DETAILS ON THIS PLAN ARE SCHEMATIC ONLY. xX XQ .. [ANDSCAPED/ PLANTED - UNLESS $PECIFIED
SPOON DRAINS TO BE CONSTRUCTED AT
THIS PLAN IS NOT TO BE USED OR SCALED FROM
FOR CONSTRUCTION PURPOSES. DETAILS MAY NEED
TO BE ALTERED AS DEVELOPMENT PLANNING
PROGRESSES. ALL DETAILS MUST BE CONFIRMED BY
EBIS ENGINEERING PRIOR TO CONSTRUCTION.
TOP & TOE OF CUT EMBANKMENT
CUT-EMBANKMENT TO BE INSPECTED. BY GEOTECHNICAL ENGINEER. DURING.
EXCAVATION TO PROVIDE COMMENT ON CONDITION OF EMBANKMENT AND.
NOMINATE. AREAS THAT MAY NEED FURTHER TREATMENT (SPRAY CONCRETE
FINISHING) - DETAILS TO BE CONFIRMED ONSITE
PROPOSED BATTERED CUT EMBANKMEN
NOT TO EXCEED A MAXIMUM SLOPE OF
1.5 VERTICAL TO | HORIZONTAL UNLESS
STORM WATER, EARTHWORKS & EROSION CONTROL FOR STEEP
SITES
NOMINATED OTHERWISE BY ENGINEER
e Batters to cut embankmenis are not to exceed a slope of 1.5
vertical to 1 horizontal - All details of cut embankments to be
confirmed onsite by engineer.
e Fill embankments should be keyed into the natural ground when
constructed on slopes greater than 15%. Embankment slopes in
fill should not exceed a slope of | vertical to 3 horizontal (where
grassed).
e If fill embankment is suitably rolled during construction,
landscaped with coarse hoop pine bark (or similar) and planted
with suitable shrubs, fill embankment slopes should not exceed a
slope of | vertical to 2 horizontal - all details to be confirmed by
owner.
e Grass to be planted on fill slopes to minimise soil erosion.
e Surface spoon drains at the top and toe of the cut batters/
retaining structures.
® At the ends of the spoon drains provide rock spalls fo disperse
OTHERWISE BY ENGINEER
PROPOSED
S RESIDENCE NSA
6 OS < P<]
S Nf XY Lp [D>
\/4
A
NY PROPOSED LAND
APPLICATION AREA FOR
/ ONSITE EFFLUENT DISPOSAL -
FOR ALL DETAILS, REFER TO
EBIS REPORT 210417-ED AND
BUILDING PAD TO BE GRADED SS DESIGN PLAN A3-210417-ED1
TO SLOPE AWAY FROM
PROPOSED RESIDENCE AS. \\
REQUIRED >,
\ LI APPROXIMATE LOCATION
NOTE: OF PROPOSED PARTIALLY
ENSURE OVERFLOW FROM PROPOSED RAINWATER TANKS IS <A I INGROUND WATER TANKS -
PIPED SUB-SURFACE & DISCHARGED TO AN APPROVED SAS ~ C) FINAL LOCATION TO BE
LOCATION, THE USE OF ROCK SPALLS, SCOUR PROTECTION PASS CONFIRMED
AND ENERGY DISSIPATERS MAY BE REQUIRED AT OUTLETS - ALL S
DETAILS TO BE CONFIRMED SS —
~
ROCK SPALL/ SCOUR PROTECTION =
WHERE SURFACE DRAINS COMBINE
SPOON DRAIN TO BE CONSTRUCTED,
ABOVE EXISTING CUT EMBANKMENT
any concentrated flow to minimise erosion.
DETAILS ON THIS PLAN ARE
APPROXIMATE ONLY. DO NOT
SCALE FROM PLAN FOR
CONSTRUCTION PURPOSES.
ALL DETAILS OF SITE DRAINAGE &
EARTHWORKS ARE TO BE INSPECTED &
NOTE:
__CONFIRMED BY EBIS
INDIVIDUAL ROCK SPALL/ SCOUR
PROTECTION TO BE CONSTRUCTED AT
TERMINATION POINTS OF SURFACE
DRAINS & WATER TANK OVERFLOW
APPROXIMATE LOCATION FOR PROPOSED HOUSE HOLD
SEWAGE TREATMENT SYSTEM - FOR ALL DETAILS, REFER TO EBIS.
REPORT 210417-ED AND DESIGN PLAN A3-210417-ED1
ORIGINAL ISSUE 04.02.2022
Engineering & Building Investigation Services Proposed Residence
Unit 1/4 Textile Ave, Warana = PO Box 973 Buddina 4575
Phone 07 54369199 Fax 54369198
EBIs
at: Lot 21 (No.14) Pines Road Cooroy
Client : DJ Sommer Homes (Pines Road)
EARTHWORKS & SITE DRAINAGE PLAN
Drawing No. A3-210417-DW1
Scale: nts
February 2022 | Drawn: LM
Checkese G9]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.