Original source · versioned page text
Attachment 3 - Geotechnical Report
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007 APPENDIX C: LANDSLIDE RISK ASSESSMENT QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY QUALITATIVE MEASURES OF LIKELIHOOD Approximate Annual Probability Implied Indicative Landslide peseription peseriptor Level Indicative Notional Recurrence Interval P P Value Boundary 10! 5x102 10 years 0 The event is expected to occur over the design life. ALMOST CERTAIN A years 7 a 7 7 ~onditions Ov! 102 100 years event will probably occur under adverse conditions over the LIKELY B ech 5x107 200 years gn - — - - = 10° 7 1000 years 2000 vears The event could occur under adverse conditions over the design life. | POSSIBLE Cc 10" 5x10 10,000 years : The event might occur under very adverse circumstances over the UNLIKELY D 10° Sxl0° 20,000 years Teagan conceivable but only under exceptional circumstances 100,000 years he event is conceivable but only under exceptional circumstances | p app E 5x10 200,000 years over the design life. 10° 1,000,000 years . The event is inconceivable or fanciful over the design life. BARELY CREDIBLE Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa. QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY Approximate Cost of Damage Indicative Notional Description Descriptor Level Value Boundary 200% Structure(s) completely destroyed and/or large scale damage requiring major engineering works for CATASTROPHIC 1 stabilisation. Could cause at least one adjacent property major consequence damage. 100% E = ; : er 0, xtensive damage to most of structure, and/or extending beyond site boundaries requiring significant 60% “eat, : : MAJOR 2 40% stabilisation works. Could cause at least one adjacent property medium consequence damage. 20% Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works. MEDIUM 3 ° 10% Could cause at least one adjacent property minor consequence damage. 5% 1% ° Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works. MINOR 4 05% Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a INSIGNIFICANT 5 notional boundary of 0.1%, See Risk Matrix.) Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost cf the improved value of the unaffected property which includes the land plus the unaffected structures. (3) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary accommodation. It does not include additional stabilisation works to address other landslides which may affect the property. (4) The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa 91 Australian Geomechanics Vol 42 No 1 March 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.