LOT 21 (16) PINES ROAD, COOROY                                         EBIS REFERENCE NO: 210417-SU/GEO


                      SITE INVESTIGATION – GEOTECHNICAL REPORT


1.0     INTRODUCTION

EBIS, practising as a geotechnical engineer, has carried out a site investigation at No. 21
Pines Road, Cooroy. The investigation was conducted in order to assess the conditions on
the site for the proposed development of a dwelling.

1.1      Details of Development

The proposed development consists of a single level dwelling on a concrete slab with
elevated timber framed decks to the south east side. The development will require
earthworks for access construction, cut/fill earthworks for building site preparations,
excavations of footings/foundations and installation of services. Earthworks will also be
required for site drainage works.

1.2      Site Location & Description

The site is described as Lot 21 on SP 308933 and is 3.86ha in area. It is located to the south
west of Cooroy Township on the west side of Pines Road. The allotment is locally in an area
of undulating to steep hills on Kin Kin beds. The site has frontage to Pines Road, as shown in
the aerial photograph below.




                                 Figure 1 – Aerial Image of the Site
                                       (Courtesy of Noosa Plan 2020)



1.3      Method & Scope of Investigations

A walkover and subsurface investigation was undertaken on 21 January 2022. A total of
three (3) boreholes and three (3) Dynamic Cone Penetrometer tests (DCP) were excavated
to refusal on weathered shalley rock. Exposed faces of cut embankments were examined in
terms of erodibility and stability. An undisturbed sample of the subgrade material was taken
and tested for shrinkage characteristics.

Following the site investigation and a site walkover by EBIS, a desk top study was
undertaken of the site and the general surrounding area.
PROPOSED NEW RESIDENCE                        PAGE 2 OF 10                                 4 March 2022
Log in to download the original file

Attachment 3 - Geotechnical Report.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.