Medium Density Residential Code
Performance Outcomes Acceptable Outcomes
2. steps down slopes or uses suspended alternative to standard single or double storey As the site is gently sloping, extensive benching
floor construction, minimising cut or fill and construction to minimise building bulk and benching and split level buildings are not required for this
avoiding benching of the site. of the sites. development.
Editor's note- refer to Figure 6.9.1A and Figure
6.9.1B
AO23.3 Not applicable
The distance between the ground level and the
lowest part of the floor of the building does not
exceed 3 metres.
Earthworks and drainage Table 6.3.2.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Earthworks and drainage
PO24 AO24 Complies:
Filling and excavation for operational works do not Filling and excavation for operational works is Filling has been designed to ensure overland flow
directly, indirectly or cumulatively cause adverse designed and constructed to ensure overland flow and flooding is not worsened as a result of the
impacts external to the development site by: and/or flooding is not worsened, impeded, or development. A stormwater management plan has
otherwise diverted to adversely affect other been prepared to demonstrate this and included as
1. causing ponding of water on the site properties or downstream environments. Appendix F.
or nearby land;
See the original