10/0364 - Prescribed Tidal Works [As Published] · 142010.364

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Officer: Trish Sweeney
Response Address: Locked Bag 72

Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2010/364

12 March 2010

Body Corporate - Las Rias
CARE Jetty Specialists

2 Industrial Avenue
CALOUNDRA QLD 4551

Dear Sir

Notice of Not Properly Made Application
Sustainable Planning Act 2009

we
4

| refer to your application .received on 10 March 2010 and advise that the application is not
properly made pursuant to the Sustainable Planning Act 2009.

 

 

APPLICATION DETAILS.

 

 

Application No: 10/0364

 

 

Street address: _ 8 Quamby Place, Noosa Heads

 

 

Real property description: OBUP8989

 

Planning Scheme: The Noosa Plan

 

 

 

 

 

[2 ACTIONSREQUIRED” |

The application is not properly made as the following matters are outstanding:

* Owner's consent has not been provided in accordance with Section 263 (1) (b) of the
Sustainable Planning Act 2009 as the application is for work on land below high-water mark
and outside a canal as defined under the Coastal Protection and Management Act 1995

e =6Arefundable bond of $500 is payable at lodgement of an application as per Council's Fees
and Charges Schedule for the Sunshine Coast Region.

The above matters must be completed for the application to be properly made and assessment
to commence.

Pursuant to the Sustainable Planning Act 2009, the applicant is to take the actions identified
above within 20 business days of this notice or otherwise, the application lapses.

If you have any further queries in relation to the above, please contact Trish Sweeney on the
above number.

CADOCUME~1\Tsweeney\LOCALS~1\Temp\C072911LNPM248615.Doc Version 1 January 2010 Page
tof2 :
Full text of the other 20 pages

Page 2

 

sunshine Coast Checklist - Applications Involving Planning
Regional Council Assessment and Operational Works Assessment

 

 

RECEIPT OF IDAS APPLICATIONS AT TEWANTIN OFFICE

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter to determine if properly made. (This may not always be possible and can be further checked)

 

(1. APPLICATION FORMS __. a “I
1.1. Form 1 required for all application & Forms 2-32

 

1.1.1 Ensure that the relevant forms are fully completed (mandatory), are current versions and include “

 

payment of appropriate fee. (Do not receipt at this stage)

 

1.1.2. In the case of an MCU or Op Works below the high-water mark, owner's consent is. required.
——eooreeeeer

iv y

 

 

 

1.1.2.1 If there are multiple owners, the consent of each owner is required...

1.1.2.2 If the owner of the land is a company, either ACN No, Company name (clearly indicated by
signatory) or Company Seal required.

(2. IDAS ASSESSMENT. CHECKLIST. :
2.1 Ensure that relevant checklist/s have been completed with regard to referrals_
~~ «= (if-applicable; not mandatory) a

2.2. Ensure correct IDAS.Forms are provided where required for referral (ie most common are Form 11 for
Assessable Vegetation, Form 24 for Contaminated land and Form 28 for Prescribed Tidal Works) ma

S-__ ENVIRONMENTALLY, RELEVANT. ACTIVITIES —
3.1 Ensure that Part G is completed if EPA referral is required.

 

I
mu

 

 

 

 

 

 

 

 

 

3.2 | Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Healthly Places for fees)

4,.__ FORM _ 2 - REQUEST_TO CHANGE APPROVAL ‘

4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.

If over multiple properties on one or more sites, consent of Body Corporate is required.

1b. PLANS =

5.1. Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and | Operational 2
Works) accompany the application. In addition ensure that each set is complete.

 

 

Saal

 

 

Lee

 

 

    

 

 

 

 

 

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is 17
unbound.
(6, SUPPORTING INFORMATION _. 3 to. ecm, A

 

 

6.1. Ensure. that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration | {
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.

 

 

 

 

 

   

 

 

 

 

 

—
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping _
7.1. Ensure that the application fee, as determined from the Council s adopted scale of fees,
accompanies the application or has been paid. wv
. ie fonro fO,

 

¢ Planning Assessment MCU applications; Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty
* Operational Works Assessment Operational Work not including Jetties
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

T g:Mlanduse\administrative processes\application checklist.doc

Page 3

 

    

 

“aly “iy

poeorey
omens

   

arch 10
by
orishine Coast Regional Council
PO Box 141

TEWANTIN QLD 4565

  

ATTENTION:- DANA McKENZIE

RE: BODY CORPORATE FOR LAS RIAS
8 QUAMBY PLACE
NOOSA HEADS QLD 4567

Pursuant to the Sustainable Planning Act 2009, we wish to make application for
Prescribed Tidal Works under the legislation that was adopted on 18 December,
2009.

Please find attached:

IDAS Forms 1 and 28

Two full sets of plans including constructional details

Proof of the land owner

Concurrence response from Queensland Transport (Regional Harbour Master)
Resource entitlement from the Department of Environment and Resource
Entitlement

6. Required Fee

WPWND

We look forward to receiving correspondence from Council within the designated
timeframes pursuant to the Sustainable Planning Act 2009.

Yours faithfully
The Jetty Specialist

Blt

MR STEVE BELT
Applications Officer

THE MARINA SPECIALIST PTY LTD TRADING AS THE JETTY SPECIALIST - ABN 32 010 633 119
2 Industrial Avenue, Caloundra Queensland 4551 Australia

Telephone 07 5492 5925‘ Freecail 1300 133 155 Facsimile 07 5492 6699

Web Page - www.thejettyspecialist.com.au — Email - [email protected]

rn

Quality
Endorsed
Company

180 9001 2000
Lc Ho Qecrasat

Page 4

 

 

 

 

 

 

 

 

 

 

Integrated Development'Assessment System form

 

 

 

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will resuit in your application not being a properly made application.

For all development applications, you must:
. complete this form (Application details - IDAS form 1)
° complete any other forms relevant to your application

° provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Applicant’ “details *(noter “the app appli ;
owner of the land. The. applicant is responsible for ehsuring the information Brovided o on all IDAS S applica on farms is

correct. Any development permit or. pretiminary approval that may be issued as a consequéncé of this application will
be issued to the applicant.)

 

 

 

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant” button below.

 

Names (individual or company name in full) Body Corporate for Las Rias CTS 6315

 

 

For companies, contact name

 

 

 

 

Postal! address C/- The Jetty Specialist, 2 Industrial Av, Caloundra Qld
4551
Contact phone number 07 5492 5925

 

 

Mobile number (non-mandatory)

 

 

Fax number (non-mandatory) 07 5492 6699

 

 

e-mail address (non-mandatory)

 

 

 

1. Whatis the natisre of development proposed? (tick all applicable boxes)

 

(material change of use of premises
(} building work

—X)_ operational work

[1 reconfiguring a tot

 

Department of Infrastructure and Planning Gin

 

 

 

 

 

Page 5

 

LOO

8..1S-oWner's consent required for this 4p

 

  

cation? (refer to notes at the end of this form for more information)

 

x] No

[1 Yes - complete either table D, table E or table F as applicable

 

9. Does the application involve a state resource? (e: g. the application involves state land, or taking quarry
materials. Refer to the notes at the énd of this form for more information) : : ee

 

[1 No [x] Yes - complete table G

 

Table G - state owned resources (provide details for more than one state-owned resource click on add another
resource button below)

 

Nature of state-owned resource Unallocated State Land

 

(J Evidence of an allocation of, or an entitlement to, the resource

Evidence the chief executive of the department administering the
resource is satisfied the developmentn is consistent with an allocation
of, or an entitlement to, the resource

Nature of evidence required (tick the
applicable box and attach a copy of the
evidence to this form)

Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource

 

 

 

 

 

10. Identify if ariy of the following apply, to the premises (tick applicable box/es).

Mos eee) ~ a

 

Xx] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(J __ onstrategic port land under the Transport Infrastructure Act 1994 - complete table |

{X] _ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

1 |Noosa Sound

 

 

Name of local government for the tidal area Port authority for the tidal area

Table 4 (if applicable) (if applicable)

 

1 |Sunshine Coast Regional Council

 

 

 

 

 

  

11! Are there any existing easements on, the prer
waiter, etc.)

687 (6.g. for vehicular access, electricity, overland flow,

 

wet eee Bate ee ee we

 

[XJNo_ []Yes - ensure the type, location and dimension of each easement is included in the plans submitted

 

Application Details - IDAS form 1
Version 1.0 18 December 2009

 

 

Page 6

HO

Notes for completing this form

Question 8:

¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1){e) of the Sustainable Planning.Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

« Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:

e The Building and Construction industry (Portable Long Service Leave) Act 1991 prescribes when the portable
tong service leave levy is payable.

* The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

« The portable long service leave levy need not be paid when the application is made, but the Buifding and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www. qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

 

OFFICE USE ONLY

 

 

 

 

 

 

Date received le | 3 | Ye) Reference numbers jo | 3 fou
1

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

To: Council. | have been engaged as the private certifier for the
0: as nt oa
building work referred to in this application.

 

 

 

 

Date of Name BSA Certification Building

engagement license number classification/s

 

 

 

 

 

 

 

 

Application Details - IDAS form 7
Version 1.0 18 December 2009

 

Page 7

 

 

 

Integrated Development Assessment System form

 

 

 

 

 

 

 

 

 

Prescribed tidal work - IDAS form 28

{Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for prescribed tidal work.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications you must:
* complete Application details - IDAS form 1

. complete any other forms relevant to your application

. provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

 

 

1, What type of approval is sought?.

 

 

[X] development permit
C1 preliminary approval

 

 

 

 

ped tidal works and the nature of the use? (tick applicable box/es),.

 

 

Private use Non-private use Estimated value of completed works ($)

 

jetty, pier or wharf

O

 

 

mooring pile

 

 

deck or boardwalk

 

|
[

 

 

pontoon $27,708

 

 

O
O
boat ramp or spillway Oo
x]
O

revetment, sea wall or retaining wall

 

DNOWOOOO
OOoOooad0d

other - please specify below

Oo

]

3; Is the application within a cul-de-sac, a bend ina waterway or other location where.the side: boundaries of
the.lot are conriected to the work and neighbouring lots aré not at right angles to the: waterway? |

 

 

 

 

No O) Yes

 

 

 

 

 

O No Yes - provide details below

 

 

 

POTN Alize Neal: Mee Lay) GED (Geeensians

Government

 

Page 8

DOO

OFFICE USE ONLY

 

 

Date Received Reference Numbers

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

 

Prescribed tidal work - IDAS form 28
Version 1.0 18 December 2009

Page 9

PLANS

 

 

PLAN TITLE DATE
JSP-SJ-22930 ISS B SITE PLAN 11/01/2010
JSP-SJ-22931 ISS B ELEVATION 11/01/2010
JSP-GW-006 ISSE CATWALK 1/10/2007

 

Page 10

Queensland Land Titles

CURRENT TITLE SEARCH
ENVIRONMENT AND RESOURCE MANAGEMENT, QUEENSLAND
Request No: 7843344

Search Date: 28/10/2009 12:39 Title Reference:

Previous Title: 15798053
REGISTERED OWNER
BODY CORPORATE FOR LAS RIAS COMMUNITY TITLES SCHEME
6315
PO BOX 551
NOOSA HEADS QLD 4567
LAND DESCRIPTION
COMMON PROPERTY OF LAS RIAS COMMUNITY TITLES SCHEME 6315
COMMUNITY MANAGEMENT STATEMENT 6315
Local Government: SUNSHINE COAST
EASEMENTS, ENCUMBRANCES AND INTERESTS

1. Rights and interests reserved to the Crown by
Deed of Grant No. 15798053 (ALLOT 283 SEC 17)

2. REQUEST FOR NEW CMS No 711021764 21/09/2007 at 15:39
New COMMUNITY MANAGEMENT STATEMENT 6315
MODULE:
ACCOMMODATION
ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL
CERTIFICATE OF TITLE ISSUED - No

Caution - Charges do not necessarily appear in order of priority

** End of Current Title Search **

Page | of 1

19208989

COPYRIGHT THE STATE OF QUEENSLAND (ENVIRONMENT AND RESOURCE MANAGEMENT) [2009]

Requested By: D APPLICATIONS ABR

http://www.abr.com.av/live/qldlt/formprocess.php

Page 1/1

28/10/2009

Page 11

 

Notice

Coastal development

 

Notice of decision — Provision of evidence of resource entitlement

 

This notice is issued by the Department of Environment and Resource Management pursuant to section 264 of the
Sustainable Planning Act 2009 to provide resource entitlement as delegated under the Land Act (Tidal works and prescribed
tidal work) Delegation (No. 1) 2008.

NECELWE
Body Corporate for Las Rias a

jl ‘AR
c/- 2 Industrial Avenue : HH O9 MAR 2018

CALOUNDRA, QLD, 4551

  

Our reference: EHBNE3131
Project Ref: MCY2237

Attention: Mr Steve Belt

Re: Request for evidence of resource entitlement for the prescribed tidal works application for a
pontoon extension in the Noosa River at 8 Quamby Place, Noosa Heads, otherwise known as
common property on BUP89839, pursuant to section 264 of the Sustainable Planning Act 2009 by
Body Corporate for Las Rias.

The Department of Environment and Resource Management (DERM), under the Land Act (Tidal works and
prescribed tidal work) Delegation (No. 1) 2008, has considered your request received on 29 January 2010 and
wishes to advise you of the decision as specified below: . ,

 

Property owner: Body Corporate for Las Rias

 

 

 

Activity: Prescribed tidal work
Activity description: Pontoon Extension
Approved Plan: Site Plan JSP-SJ-22930 — Revision B dated 11/01/10

 

8 Quamby Place. NOOSA HEADS QLD 4567

 

Description of subject fand:
Lot 0 on BUP8989

 

Decision: Evidence of resource entitlement is granted.

 

 

 

 

 

Page 1 of 3 * 080131

Department of Environment and Resource Management
www.derm.qid.gov.du ABN 46 640 294 485

Page 12

ecoaccess

environmental licences and permits

Notice.
Notice of decision — Provision of evidence of resource entitlement

 

Decision Number: CSRE00665810

 

The evidence of resource entitlement can be used until the 9" August 2010 to

Expiry support a development appliction for the abovementioned works.

 

 

 

DERM has not provided an early concurrence response for this application. The application must be referred to
the DERM for concurrence assessment during the Integrated Development Assessment System referral
Process,

It is important to note that the provision of evidence of resource entitlement over State land means that the State
has no objection to the lodgement of the application for development approval. It does not:

* imply approval of the development application; or
* — affect functions the agency may exercise as the assessment manager or a referral agency; or
* authorise a right to use and occupy land.

You may need to comply with the cultural heritage duty of care guidelines under the Aboriginal Cultural ‘Heritage
Act 2003 and the Torres Strait Islander Cultural Heritage Act 2003, refer to the guidelines on :

www.derm.qld.qov.au. :

You are advised that all applications involving disturbance of marine plants require a development approval from
the Department of Employment, Economic Development and Innovation (IDAS Form 1 Part 02).

If you require more information, please contact Jessica Johnson, the Project Manager, on the telephone number
listed below. ,

Yours sincerely

o&[o3/to,

 

Signature : Date
Ben Sale Enquiries:
Delegate ES - Reg Serv - Bne North - Sunshine Coast
Environmental Services - DERM
PO Box 168

D . .
epartment of Environment and Resource Management COTTON TREE QLD 4558

. Phone: (07) 5459 6132
: Fax: (07) 5443 9927

Attachment - Approved Plan

 

 

Page 2 of 3+ 080131 Department of Environment and Resource Management

Page 13

Notice

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Environment and Resource Management

Notice of decision — Provision of evidence of resource entitlement

environmental licences and permits

 

 

Attachment 1 — Approved Plan

ecoaccess

 

 

x
A Fa Noosa River ‘ “ee
= conn ne hee
e. ~ Ss |
rs ~ _— __ i __ g
PVA ~ —] > j
YAY ere ~ ™
\ ae ™ “ol
yo ~~. i
\ SN ™ parts 5 Neon
\ —— 8 § ~
~ 2 3
\ LOT 283 AN ee 3 EASING Sento
\s SP N218.55 / . “7 dam FONTMER AY gl
Bis y 7 g Crh eC i FROM SHORE :
Sx. .
ee MON PROPERTY / % _pastnc Pues To Be / EXISTING 7.8m HINGED
. coe UP B98) / \ ee sts ae See ee
a” B 3150 48 km RC, INSTU
\ re PAE WT SS OSTOCE 93 NEW ALUMINIUM WALKWAY
\ CONNECTED To
\ 4 \ 3 EXISTING HINGE POINTS
\ a
\ L
\ 8 a
a ot Re 4
ye? 5
QUAMBY an
PLACE CENTRELINE OF EXISTING
a _
SITE PLAN & eee
WATER ALLOCATION ——
SCALE 1:500
LOT 283
BERTHING:
Note: Moximum wet vessel length = 11.0m
Existing structures shown Moximum wet vessel beom - 4.3m \

in opproximate position nly.

 

 

   

(02) 3008 wezz

Cees noe 081 074 902
cartes 8 Puts

 

 

 

 

 

 

 

 

 

Page 3 of 3+ 080131

Page 14

Queensland
Government

 

21 January 2010 Maritime Safety
Queensland

Queensland Transport

The Jetty Specialist
2 Industrial Avenue
Caloundra Qld 4551

Dear Sir

Operational Work, Prescribed Tidal Works — Request for comments
Proposed Catwalk Extension to the Existing Pontoon System, Body Corporate for Las Rias CTS
613 Common Property, 8 Quamby Place, Noosa Heads (Lot 283 RP144250).

Thank you for your letter of 15 January 2010 about your proposal to construct pontoon at the Jocation
mentioned above.

As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.

1. The contractor must build the pontoon according to The Jetty Specialist, drawing number JSP-SJ-
22930, Issue “B” and JSP-SJ-22931 Issue “B”, attached to your letter dated 15 January 2010.

2. No part of the structure or any ship berthed at this structure is to come closer than | .Smetres from
the side boundaries of the allocated water space as shown on the submitted water allocation plan.

3. The pontoon and all freestanding piles must be lit and clearly visible to approaching vessels. The
contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels.

4. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.

5. The ship moored at this pontoon must follow the most direct course from this structure to open
waters and a similar direct course when returning to this pontoon.
Maritime Safety Queensland Our ref 710/01702(1) P40691 £35675 F1
Marine Operations (Brisbane) Your ref
MacArthur Avenue East Enquiries James O'Connor
Pinkenba Queensland 4008 Telephone +61 7 3860 3504
Facsimile +61 7 3860 3571
ABN 13 200 330 620 Website www.msq.qid.gov.au

Email james.b.o’[email protected]

Page 15

6. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.

7. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1 995.

8. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.

9. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.

10. This structure will be outside the existing quayline due to the sand build up in the area.

11. Any ship, dry berth or device (including Air Lifting Pontoons) berthed, moored or attached to the
pontoon must not exceed the following sizes:

Wet Berth Dry Berth
Length Overall - 11 metres N/A
Beam - 4.3 metres

12. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.

Yours sincerely

- Sf ;
| famed beer,

%

fu

Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Maritime Safety Queensland : Page 2 of 2

Page 16

Sp Cardno

Our Ref 87900/05.008(130): GMc:fv

Contact Graeme Mclain

18 January 2010

The Manager

The Jetty Specialist Pty Ltd
2 Industrial Ave
CALOUNDRA QLD 4551

 

Dear Sir

Structural Design Advice

Project: Pontoon, Piles & Catwalk
Owner: Body Corporate for Las Rias
Address: Lot 283 (8) Quamby Place, Noosa Heads

We, Cardno (Qld) Pty Ltd, advise that the proposal to construct the works
described above has been checked by us. When the works are constructed in
accordance with the approved drawings and in the location shown, the proposed
works are structurally adequate for the anticipated usage in this location and
should comply with the design and safety provisions of the Prescribed Tidal Work
Code (Schedule 4A of the Coastal Protection and Management Regulation 2003),
based on the design criteria, and assumptions listed below.

Basis of Design Advice

¢ The works do not impose loads that would significantly affect existing
structures.

e The works do not adversely affect the stability of the bed and banks in
the near vicinity of the structure.

e Structural design criteria:

400mm wind wave

300mm boat wake

Wind Classification N3

Max. Current 1.4 m/s parallel to face-of pontoon

Maximum Wave Height

Scour : Reasonable scour effects from flood flows and
tidal flows have been considered
Debris Load. To AS 3962

Impact Loads
Max Vessel Size berthed
Relevant Codes

Minor loads without some damage to structure
11.0 metres length (wet) & 4.3 m beam (wet)
AS1170, AS 3962 and AS 3600, except where
varied by the Prescribed Tidal Work Code

Australia « Belgium « Indonesia » Kenya « New Zealand e Papua New Guinea
United Kingdom » United Arab Emirates « United States » Operations in 60 countries

1:\B7900-05\Sub008\130-Body Corp For Las Rias\Word\Design Advice.Doc

 

Shaping the Future

Cardno (Qld) Pty Ltd
ABN 57 081 074 992

Level 11

515 St Paul's Terrace
Fortitude Valley QLD 4006
Australia

Locked Bag 4006
Fortitude Valley QLD 4006
Australia

Phone: 617 3369 9822
Fax: 617 3369 9722

www.cardno.com.au

Ouaity
#80 9001
@mwacen

Page 17

18 January 2010 « j ) Cardno

This design advice does not cover the construction or installation of the works on site. The Builder shall
confirm the adequacy of the site conditions during installation and shall advise the Engineer if variation
from details shown on the drawings occur. No detailed site investigation or studies have been carried
out by us or provided to us. The design review has been carried out on the basis of limited enquiry only.
Pile depths shown are applicable to founding in stiff clay or dense sand. There is some additional risk of
failure should the above design criteria be exceeded, or actual site conditions be inferior to those
assumed. If ground conditions other than those described above are encountered during construction
or seabed levels encountered are deeper than those shown on the drawings, further advice should be
sought.

This design advice relies on designs prepared by other consultants, but does not warrant them.
The structure is to be built in accordance with the following referenced documentation, using good

building practice.

Referenced documentation

* Drawing No. JSP-SJ-22930 B
* Drawing No. JSP-SJ-22931 B

Competent Person Details

Name: Graeme Mcllwain RPEQ 1470

Name of firm for and on behalf person is signing:
Cardno (Qld) Pty Ltd
Level 11 Green Square Nth Tower
515 St Paul's Terrace
Fortitude Valley Qld 4006
Postal address:

Locked Bag 4006 Fortitude Vailey
Queensland 4006 Australia

Phone: (07) 3369 9822 Fax: (07) 3369 9722
Reference: B790005-008(130)
Signature of competent person:

raeme Mcilwain (RPEQ 1470)

Director
for Cardno

L:\B7900-05\Sub008\130-Body Corp For Las Rias\Word\Design Advice.Doc

Page 18

\

wn

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

  

 

 

 

           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

z
. I 8500) —-| SI
\ Fa Noosa Fiver ‘i
z T
oF Oe — oy
By ™ => ¥
“>
a \ ee —_ —— nn a 8 45
a u wr Zz
L 44. i} -—---—- ' . S
i Se ™ it — g
\ ee ™ c27, ‘ SAP AT 5
‘ me Oo | " Bi
‘\ om a t x a
\ mL, we # Sh
\ a . r iH 34 a= -- h~ 5
\ ae — 400¢ 130 kNm R.C. ' Yo tt =|
\ ~ INSITU. PILES i yo kt 8 ™—_ =
\ ~ i ted S 3
\ a, 1 W ¥ + 2
\ ~ Fon 2d NS —~  &
\ mS of { ‘ \ EXISTING PONTOON ~5
\ LOT 283 SS SE i 3 i TO BE DISCONNECTED §I
\ OR 1 \ i AND RECONNECTED &
a SP N218.55 fs Lepamngll vepccep) —t 4.2m FURTHER AWAY al
By “ Loe or FROM SHORE EI
wee . J a 3 .
N's. ra { H 2
Oh a ! EXISTING PILES TO BE ' " EXISTING 7.5m HINGED I
*e COMMON PROPERTY a REMOVED BY THE JETTY if i WALKWAY TO BE RECONNECTED z
\ BUP 8989 “ SPECIALIST peEgepEE TO NEW 4.2m FIXED CATWALK a
4 ” yi
‘ wy’ 315 46 kNm R.C. INSITU a
\ see PILE WITH ALUMINIUM S
‘ LS » HEADSTOCK NEW ALUMINIUM WALKWAY 4
\ 248 , CONNECTED TO r
\ v \ { EXISTING HINGE POINTS
\ 8768 “ \ al
ao ° Ets co EXISTING a
308): TSn. “ } ALUMINIUM |
ane? % { WALKWAY a
QUAMBY \ ' :
. S
PLACE } CENTRELINE OF EXISTING Z|
boy CONCRETE PATH 5
SITE PLAN & BV II nnn Z
WATER ALLOCATION | \ 4g60 og
SCALE 1:500 ot \— 2
' \ . is)
if \ . LOT 283 a
BERTHING: : \ SP N218.55 a
Note: Moximum wet vessel length - 11.0m : | \ q
Existing structures shown Moximum wet vessel beam - 4.3m a \ Z
in approximate position only. f \ z
vo HE MARINA SPECIALIST Car dne \ (CUENT: BODY CORPORATE FOR LAS RIAS | TME: SITE PLAN, LAYOUT
a ACN 010833119 2 INDUSTRAL NE (cua Py ACN: 051 074 982 LOT 283 (8) QUAMBY PLACE & WATER ALLOCATION
QLD. ASTRAL 4881] Jn, 5 ci ces, 4064 Oe ase a2 NOOSA HEADS SE BR 1/09 DRAWING NO:
“PHONE 7 joowong 4066... Ematt: rénoQeard PROJECT: ’ \ Asi JSP-SJ—22930
B h1/01/10MEND_ PROJECT DETAILS eee (G7) stan se08 CHECKED: 2. RP.EO. * ~~ PROPOSED EXTENSION CATWALK DRAWN | CHEDKED [DIMENSIONS SUE Hae
{REY DATE AMENDMENT SPE OCTALIS T MOC vce. MID ellie ) TO EXISTING PONTOON ACN. eS? MILLIMETRES SS,
af _ :

 

“|

 

 

Page 19

EXISTING FIXED CATWALK NEW FIXED CATWALK
HANDRAIL CORNERS TO MATCH EXISTING

EXISTING 7.5m CATWALK

  
         

STANDARD PIANO HINGE CONNECTION
APPROX. R.L 1.80m

 

TOP OF PILE R.L 3.0m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECT NEW CATWALK
TO EXISTING HINGE BRACKETS

 

 

 

wee eee ee ee le dee ee ee ee ee -HAT R.LO.51m - - 7
eee te -MHWS R.L 0.26m- - ---- > f°

< + - —LEVEL DATUM AHD R.L. 0.0-
MLWS RL -Od9A ct
IAT RL. -O.34m 00

 

 

   

 

 

 

          

 

PONTOON SHOWN AT LAT

 

 

 

 

 

 

 

 

us DRAWING {S SUBJECT TO COPYRIGHT AND CANNOT BE REPRODUCED IN PART OR_FULL OR PASSED_ON TO A THIRD PARTY WITHOUT THE WRITTEN PERMISSION OF THE JETTY SPECIALIST J

 

 

 

 

 

 

 

 

 

 

aS,
245 —
w Oo
Gu
aoe
zon
Zow
315@ 46 kNm R.C. INSITU gz° Zo
PILE WITH ALUMINIUM HEADSTOCK 4000 130 km | Bak
R.C. INSITU PILES @.,°
Ot
Zon
Eos
Zz
§
t
a: MARINA SPECIALIST Card CENT: BODY CORPORATE FOR LAS RIAS | TME: ELEVATION
AEN 010633119 2 INDUSTRIAL AVE PANO scx: 051 074 992 LOT 283 (8) QUAMBY PLACE & WATER ALLOCATION
THE CALOUNDRA Cerdno (Od) Pytet bp, (07) 3369 9822 f
OUD. AUSTRALA 4551 | lheet 1, 5 cordner Close, Miton 4064 Po (Or) 3389 8722 NOOSA HEADS - SCALE: DATE: DRAWING. NO:
— PHONE (07)5492 5925 — Box 388, Toowong 4068.” Email execu coms PROJECT: PROPOSED EXTENSION CATWALK 1:50 29/11/09 | JSP-SJ-22931
1/01/1AMEND PROJECT DETALS. FAX (07) 5492 6699 EO : DRAWN] CHECKED DIMENSIONS ISSUE
DATE ‘AMENDMENT SPE GTALtIHST bey, yy TO EXISTING PONTOON ACN. Vs MILUMETRES B jAd

 

 

 

 

 

 

 

 

 

Page 20

et

 

 

 

 

1370 Arp .
- EXTERNAL ~ SECTION A
“— JSP-203 1210 TN areas .
TOP CHORD / HANDRAILS | INTERNAL :
JSP—202 7 3mm ALUMINIUM PLATE FIXED TO FRAMING AT 250mm

         

UPRIGHTS & DIAGONALS |

OPTIONAL
50 X 4 TUBE TOE RAIL
TO 6mm PLATE TO EACH
UPRIGHT

JSP=201"

CRS WITH 4mm AL. RIVETS & COVERED WITH
COMMERCIAL OUTDOOR CARPET. OR 125 X 25mm CCA
TREATED & DRESSED F17 HARDWOOD PLANKS FIXED
with 6 / 50 X 10 GAUGE STAINLESS STEEL SCREWS

9 lo EACH PLANK.
840 * FOR UNRESTRICTED ACCESS (ALL SITUATIONS OTHER
THAN PRIVATE MARINA FACILITIES FOR 1 OR 2 BOATS)
USE 125 X 35 F17 CCA TREATED’ HARDWOOD PLANKS
OR 4mm AL. PLATE ,

 

 

 

 

 

 

 

 

 

 

 

OPTIONAL FOR MARINAS.
JSP-202 RHS SERVICES
BRACKET WELDED UNDER CROSS
BEAMS © 1800 CRS

NOTE: :
J ———-———_. FOR 4kPa LOADING TO CATWALK

USE JSP—006 RHS BOTTOM CHORD / BASE RAILS,

 

60 X 40 x 2 RHS LONGITUDINALS

WELDED BETWEEN ALL CROSS MEMBERS 1
FOR CATWALKS WITH TIMBER DECKING '
ONLY

STANDARD SIDE PROFILES Te

SCALE 1:100 =)
a)

 

 

 

 

 

 

NOTE: BENT END OPTION CAN BE

| 3 UPRIGHT. |

 

a. :
€

USED ON ALL SIZED CATWALKS

 

 

- 4200

 

000°%
e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES: |! “MAXIMUM CATWALK LENGTHS
AL. FRMUNG MATERA TO BE ALUMINIUM - [VE DECK LOAD|1.5 kPo 2kPa kPa 4kPa
* ALL ALUMINIUM WELDING IN ACCORDANCE WITH AS. 1665 3 UPRIGHTS 7.5m 6.5m 6.0m 5.0m
+A WEDS SLL fen CF, UNE AS. 1954 5 UPRIGHTS 11m 10.0m 9m__| 8.5m Eau 965
* ALL ALUMINUM SECTONS TO BE GRADE 6351-15. Z_UPRIGHTS __| 13m 12.2m_[ 115m | 10.5m , ;
RSMO Tse: Woman OF 10 onm 201 [9_UPRIGHTS | 15m 13.9m_|12.5m__| 11.5 spac FF

> 10°70 100mm 402 FT UPRIGHTS 7m 16.0m_ | 14.5m 13.0m to

AL ANGLES 21 9 UPRIGHT

           

&

_

    

CHANGES TO BE NOTED AND RETURNED TO DRAWING OFFICE FOR REVISION

BE NO LESS THAN 500mm ONTO PONTOON AT MEAN LOW WATER.

ROLLER DETAIL

SCALE 1:5

    
 

 

 

JSP-206 PIANO HINGE TUBES WELDED TO CATWALK END

  

  
 

LENGTH AND SPACING TO SUIT STANDARD PIANOH HING!
SEE STANDARD PIANO HINGE & LAND ANCHOR DRAWINGS 90 TUBE

TOT

     

50 X 2 SHS © EACH UPRIGHT & AT 1/3 X
(UPRIGHT SPACING), WITH 600 CRS MAX:
OR 400 CRS WITH 3mm OR 4mm PLATE

TYPICAL BASE DETAIL

SCALE 1:100

re HINGE TUBES

 

 

 

 

 

 

 

 

 

 

 

 

Breen

 

 

 

 

 

 

 

 

 

 

 

 

!
4
=== 0 X 6 FLAT BAR WELDED TO
12mm SS PL HINGE TUBE & CATWALK END
LL BAR
870 NYLON ROLLER TO 7 5g CHANNEL so
EACH SIDE OF CATWALK. oo : PIANO HINGE DETAIL
: . SCAR 15 _
THE MARINA. SPECIALIST ec cunt: Bopy Coe foe LAS tas | Tm STANDARD CATWALK CONSTRUCTION >
; TRADING AS ACN 010833119 2 INDUSTRIAL AVE Fardn © ncn: 051 074 982 R Quauay Pirce
Tue DRA Putts. ph (07) 3369 9822 ,
410/07 LOAD TABLE & NOTES ALTERED ENG / OLD. AUSTRAUA 4551 | reve 1, 5 Gartner Chose, ‘ton 4054 Noosa tteAbs _ISCALE: DATE: DRAWING NO:
aI fie Seah Se Gino tsp Seay PHONE (07}8492 5825 | {Po B= SB Toowen toss Fx (07) 3368 9772 eomod | PROJECT: STANDARD DRAWING AS SHOWN | 12/3/03 | JSP-GW-006
b2/7/04 BASE RAIL & HINGE SECTIONS CHANGED ISP ] FAX (07) 5492 6699 CRD A wae DATE: DRAWN | CH DMERSIONS SSue A3
DATE AMENDMENT Reap SPeclrlati s T - 4667 2p /2. 07 NHW “a MILLIMETERS. E J)

 

 

 

Page 21

 

Sunshine Coast LAND USE SECTION FEES

Regional Council

 

CIVICA TYPE RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110

The Noosa Plan Documentation 111

APPLICATION FEES
Material Change of Use - Code/tmpact MCU

Consistent ~ : 521
Inconsistent 521
Assessment under Superseded Planning Scheme . 521
Modification to a Development Permit MOD DP 521
Extension of a Currency Period 521
_f Lot Reconfiguration RECONFIG 521
7 Bldg Work assessable against the Planning Scheme 521
=
PRE LODGEMENT REVIEW .
Half Hour . 522
One Hour . 522
ADVERTISING .
. + Purchase Advertised Applications 523
JETTIES
” Jetty Application Fee 2aTbe 524
+ Jetty Bond Lo 51
(Category 4)
BONDS .
. Performance Bond 51
(Category 9)
SEARCH FEE
Search of Land Use Section file 412
Liquor Licensing Request 113

 

TOTAL $ 2B The

wawe: “fhe eth, Soe crt ale
ADDRESS: 2D x barat AM

 

 

 

 

. nro I bz A “uss
FILE NO: tof sey pate: re /Pfro
RECEIPT NO: pe LS —— : _ Signature of TP Officer: fs Divec
AUTHORITYNO: _ f

(4(rerof aoe [1

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0364 - Prescribed Tidal Works [As Published].pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.