Council archive · source document
10/0364 - Prescribed Tidal Works [As Published] · 142010.364
Integrated Development Assessment System form
Prescribed tidal work - IDAS form 28
{Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for prescribed tidal work.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications you must:
* complete Application details - IDAS form 1
. complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
1, What type of approval is sought?.
[X] development permit
C1 preliminary approval
ped tidal works and the nature of the use? (tick applicable box/es),.
Private use Non-private use Estimated value of completed works ($)
jetty, pier or wharf
O
mooring pile
deck or boardwalk
|
[
pontoon $27,708
O
O
boat ramp or spillway Oo
x]
O
revetment, sea wall or retaining wall
DNOWOOOO
OOoOooad0d
other - please specify below
Oo
]
3; Is the application within a cul-de-sac, a bend ina waterway or other location where.the side: boundaries of
the.lot are conriected to the work and neighbouring lots aré not at right angles to the: waterway? |
No O) Yes
O No Yes - provide details below
POTN Alize Neal: Mee Lay) GED (Geeensians
Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0364 - Prescribed Tidal Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.