Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

08/0175 - Response to Advice Agency Information Request - Wetlands [As Published] · 132008.175

of 2

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

@ Page2

Lot 9 has been substantially altered through approved activities detailed in Management Plans required and
accepted by Council. Management plans required under the subdivision approval 23118 DA included
Environmental Management Plan, Ecological Restoration Plan, Fauna Management Plan, Fire Management
Plan, Landscape Master Plan, Construction Management Plan, Sediment and Erosion Control Plan,
Stormwater and Water Quality Management Plan and Acid Sulfate Soils Management Plan.

Lot 9 has limited vegetation as detailed by the attached survey plan and is well away from the dedicated
wetland areas. Further conditions of approval may be imposed to ensure that the development does not
impact on the surrounding areas. It is considered that the proposal meets the requirements of the
Environmental Protection Act.

item 2: Demonstrate consistency with the SEQ Regional Plan.

Appiicant’s Response:

The South East Queensland Regional Plan includes the site in the Urban Footprint. The proposal does not
require referral to the Department of Infrastructure and Planning. The proposal is consistent with the intent of
the Urban Footprint which states that local government planning schemes and detailed local structure plans
will be the principle instruments for establishing the desired use of lands and the preferred timing of
development within the Urban Footprint. Tne Superseded Planning Scheme includes the site in the
Residential High Density zone which indicates that Multiple dwellings are consistent uses.

The EPA has commented that the proposal appears to exceed that prescribed by the Superseded Planning
Scheme. This is a totally erroneous statement that has no basis. The proposal complies with superseded
planning scheme and is of the same density as that has been previously approved over the site.

The site has been substantially modified in accordance with Management Plans approved by Council with

the environmentally sensitive areas of the overall development dedicated to Council as park. The proposal is
considered consistent with the SEQ Regional Plan.

The supply of this additional information completes the applicant's response to your advice agencies
comments.

Yours sincerely

LA.

Nadine Gorton
Senior Planner
Martoo Consulting Pty Ltd

Encl (1)

Used in these records

About this file

File size
123 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0175 - Response to Advice Agency Information Request - Wetlands [As Published].pdf · 123 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.