Skip to the record
Every meeting, every word.

Council archive · source document

Negotiated Decision Notice - MCU26 0012 & OPW26 0034 (As Published) · MCU26/0012

of 11

Text shows just the words. Original shows the document exactly as it was published.

                      Stormwater Drainage
               20.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Easements
               21.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               22.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               23.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               24.    All works must be carried out in accordance with the recommendations contained in Slope
                      Stability Assessment (26020-001-Rev0), prepared by tectonic and dated 13 February 2026,
                      listed within this Decision Notice.
                      Earthworks and Retaining Walls
               25.    All earthworks must be undertaken in accordance with the conditions of this Decision Notice,
                      be in accordance with Earthworks Plan Part 1 & 2 and Earthworks Sections prepared by
                      SCG Engineers (00577-OW3.1, 00577-OW3.2 & 00577-OW3.3) and dated February 2026.
               26.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.




                                                                                                      Page 4 of 11
Document Set ID: 24817696
Version: 3, Version Date: 27/05/2026

Used in these records

About this file

File size
173 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice - MCU26 0012 & OPW26 0034 (As Published).pdf · 173 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.