c. a longitudinal section of the proposed driveway extending from the centreline of the road
formation in Lukes Road to the garage pad of the proposed dwelling and proposed bin-buggy
garage;
d. reference to any manoeuvring areas required for vehicles;
e. demonstrate how stormwater runoff generated by the downward slope hardstand of the
driveways will be diverted away from the garages;
f. if any additional driveway crossovers to access the property are proposed, provide plans
and detail for the access point/s.
Please note that: the access/es must be generally in accordance with Council’s standard
drawing RS-056 and any associated addendum. The driveway will require the submission of
an Operational Works application which may or may not be supported.

Response: Please refer to the attached Engineering RFI Response Letter and the conceptual engineering
plans within the Stormwater Management Report prepared by Westera Partners.

Item 11

Provide additional comment demonstrating how effluent generated by the existing and
proposed buildings will be treated and disposed noting that the site is within the Water
Supply mapped buffer and catchment area.

Response: Please refer to the attached Site and Soil Evaluation prepared by Australian Soil
Investigations. An advanced secondary wastewater treatment system is proposed for the treatment of
effluent and a pressurised sub-surface reticulated irrigation system is proposed for the disposal of the
treated effluent within the land application areas (320m2 for the main dwelling house and 400m2 for the
rural workers’ accommodation).

Item 12

Provide a preliminary Erosion and Sediment Control Plan demonstrating how the proposed
works will not create worsening of downstream slope conditions and avoid sediment leaving
the site. The preliminary plan must be prepared by a suitably qualified person and adhere to
the recommendations made in Tectonic’s Slope Stability Assessment.

Response: Please refer to the attached Engineering RFI Response Letter and the conceptual engineering
plans within the Stormwater Management Report prepared by Westera Partners.

We thank Council on behalf of the applicant for assessing the attached additional application material.
Based on the information provided in this application we respectfully request that Council proceed to
issue an approval.Should you have any questions with respect to the above, please do not hesitate to
contact me directly.

Yours faithfully,
Adapt Town Planning + Development Management




 Tiani Boulton
 Director
 E: [email protected]
 M: 0404924160




                                                                                                     13
Log in to download the original file

Information Response.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.