Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix E - Code Assessment

of 37

Page text shows just the words. Original shows the document exactly as it was published.

    (e) provides for moderate and large size
        developments to have multiple access
        points;
    (f) promotes a sense of community identity and
        belonging;
    (g) promotes a variety of streetscapes;
    (h) provides for a high level of amenity, having
        regard to potential noise, dust, odour and
        lighting nuisance sources;
    (i) integrates prominent site features including
        landmarks, native vegetation and views into
        the design;
    (j) discourages crime or antisocial behaviour by
        facilitating casual surveillance of streets,
        paths and public open space;
    (k) avoids the sporadic or out-of- sequence
        creation of lots; and
    (l) protects     and      enhances     ecologically
        important areas and provides for the
        clustering of lots into cleared areas.
Infrastructure                                            No acceptable outcome provided.                        Not applicable.

PO10
Development accommodates and provides for the
efficient and timely delivery of infrastructure
appropriate to the site’s setting and intended use.
PO11                                                      No acceptable outcome provided.                        Not applicable.
Roadway and pathway layout are predominantly
rectilinear with a high degree of permeability.

Editor’s Note— Further detail on traffic and the road
network is addressed in Part 9.4.8 Transport Code.
Infrastructure and Services
PO12                                                      AO12.1                                                 Complies.
New lots are located, sized and configured so as to       All lots are connected to power supply and
ensure each lot is capable of being serviced by           telecommunications services and where located within   Each proposed lot will be serviced by standard urban infrastructure
appropriate levels of infrastructure including:           the Urban boundaries, power supply and                 services.
    (a) power supply;                                     communications     infrastructure  are     provided
    (b) telecommunications; and                           underground.
    (c) where within Local Plan Areas reticulated
         water supply;                                    AO12.2
Log in to download the original file

Appendix E - Code Assessment.pdf · 495 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.