Minor Change Council Report 132003 220664 4 (As Published)
PLANNING & ENVIRONMENT COMMITTEE MEETING REPORT 12 August 2025
7.3.2 Enhance the attraction of the Cooroy Business Centre by reducing through traffic and
creating safe and more attractive pedestrian environment.
7.3.3 Maintain an appropriate streetscape character within the Cooroy Business Centre. The
proposed development is generally consistent with these requirements because:
• The proposed shop is located within the Cooroy Business Centre, and the extension will
support the ongoing consolidation of commercial activity within the Centre, consistent with
Strategic Objective 7.3.1.
• The proposal maintains existing pedestrian pathways along Maple Lane and does not
increase vehicle access or traffic movements. By providing a monetary contribution in lieu of
on-site car parking, the proposal supports a safe and pedestrian-focused environment,
consistent with Strategic Objective 7.3.2.
• The proposal involves the enhancement and adaptive reuse of an existing commercial
building. The design and scale of the extension are sympathetic to the established built form
and character of the Cooroy Business Centre, thereby maintaining and enhancing the
streetscape in accordance with Strategic Objective 7.3.3.
Flood Hazard
Portions of the site, including areas within the proposed building footprint, are identified as being
subject to flood inundation, as shown in Figure 6 above. A flood search certificate confirms that the
1% Annual Exceedance Probability (AEP) level—defined as the Defined Flood Event (DFE)—is
107.2m AHD. In accordance with applicable flood planning controls, the minimum finished floor
level for development on the site is DFE + 0.3m, or 107.5m AHD. The proposed storeroom addition
will be constructed at a floor level consistent with the existing shop, which is approximately 107.2m
AHD. It is submitted that the proposal satisfies Performance Outcome PO1 of the applicable Flood
Hazard Overlay Code, as it will maintain the safety of people and minimise risk to property in the
event of a DFE, for the following reasons:
• The storeroom constitutes minor building work with a total area of less than 50m² and will
match the finished floor level of the existing shop;
• The storeroom will remain flood-free during events up to and including the 1% AEP event;
• The storeroom is to be constructed as a sealed container, thereby minimising the potential
for water intrusion; and
• The container can be easily cleaned following a flood event, and any goods stored within
can be elevated above floor level to mitigate potential water damage.
Heritage and Character Area
The site is located within a mapped Character Area, which includes all buildings fronting Maple
Street, as illustrated in Figure 7 above. It is submitted that the proposal complies with the relevant
acceptable and/or performance outcomes of the applicable code for the following reasons:
• The existing character building fronting Maple Street will be retained and protected as part
of the development;
• The proposed extension is modest in scale, located at the rear of the premises, and will
not be visible from Maple Street. As such, it will remain compatible with the existing
setting and the valued streetscape character of the area.
Assessment of Request
Assessment of the application includes 3 key considerations:
1. Works within a Character Area
2. Works within an area identified as being subject to flooding and inundation.
3. Acceptance of car parking contributions in lieu of 2 onsite car parking spaces.
Page 9 of 13
Document Set ID: 23950764
Version: 6, Version Date: 28/07/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Minor Change Council Report 132003 220664 4 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.