Change Representations - CYC 2025 (version 2 19.01.25)
Condition 86 – Vegetation Removal
86. Vegetation must only be removed or disturbed in accordance with a Fauna
Management Plan (or part thereof) prepared by a qualified person* and
endorsed through an Operational Works approval.
The condition requires amendment / clarification to ensure the condition is only applicable
to native vegetation removal only. Noting the site contains existing orchards that are used
for commercial produce.
86. Native (non commercial) Vegetation must only be removed or disturbed in
accordance with a Fauna Management Plan (or part thereof) prepared by a
qualified person* and endorsed through an Operational Works approval.
Condition 88 – Bushfire evacuation plan
88. The development must be carried out in accordance with Bushfire Evacuation
Plan v4 prepared by North Coast Environmental Services and dated
06/09/2024, which must be amended as follows
a. Revised plans that that incorporate the latest architectural plans that
shows the internal evacuation route that connects directly between
the shelter in place building and the clamping infrastructure.
b. Section 8 Evacuation Triggers, to be updated to include:
i. Daily review of FDR forecasts for the Southeast Coast which
are available from the Bureau of Meteorology
ii. Evacuation of all guests and non-essential staff prior to the
commencement of any day with a forecast FDR rating of
Extreme or Catastrophic.
Please find attached addendum reporting from North Coast Environmental commenting
on the revisions required. The words Extreme should be removed from the condition 88bii.
ii. Evacuation of all guests and non-essential staff prior to the
commencement of any day with a forecast FDR rating of
Extreme or Catastrophic.
Condition 96 & 97 – External Works – Kabi-Cootharaba Intersection
96. The existing intersection joining Cootharaba Road with Kabi Road must be
upgraded to include a sealed Basic Right Turn Treatment. The works must
be undertaken in accordance with an Operational Works approval, be
generally in accordance with section 7.2 of Austroads’ A Guide to Road
Design Part 4A, sections 5, 6 and 8 of BMC Traffic’s Traffic Engineering
Assessment Report (Doc ID: 22354477) dated 22 March 2023, The Noosa Plan
2020 – PSP6 Engineering Design Standards, and include, but not be limited
to:
a. a design prepared by a suitably qualified person (RPEQ);
b. so that no part of the rigid vehicles exits the traffic lane(s); and
c. widening of Kabi Road in accordance with Condition 97
97. Kabi Road must be upgraded for the full length of the road (i.e., between 59
Kabi Road and Cootharaba Road). The works must be undertaken in
accordance with an Operational Works approval, be generally in accordance
with Austroads’ A Guide to Road Design Part 3, sections 5, 6 and 8 of BMC
Traffic’s Traffic Engineering Assessment Report (Doc ID: 22354477) dated 22
March 2023, The Noosa Plan 2020 – PSP6 Engineering Design Standards,
and include, but not be limited to:
a. a design prepared by a suitably qualified person (RPEQ)