2014-02-25 Infrastructure & Services Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 25 FEBRUARY 2014
Page 16 of 51
ATTACHMENT 2
lcommunity/socialbenefit | C2 |
es riskassessment CT CT
Prot esrintins | er
Asset typess Asset - Upgrade, Renewal, RehaborNew sss || 30 (<ss|
a es a
crteraOSO~—SOCSOCESOS—SSOSC“CSsSCSCSSSSC“‘CsCSCSCSYSCS SSC
fcommunity/ Environmental increases access and/or value tocoreservices/ townships —=s«—=«'10._—=«iVery high positive impact. SSCS”
| tt (ttCC“‘!CCC#C(C#dé# reovide's benefit to multiple community groups C=‘; C[Highpositiveimpact, Cd
Po ttC“‘(CC*dSsttainsendemic species 0 CC—“‘CNO*NSCCOC8: [High positiveimpact,
| tttt—“‘_CNCCdé(Creates further opportunitues to immediate community | 6 [Moderately positiveimpact,
| tC—“‘CO’C__[Reducesenvironmentalpests, — C“‘NOC(*N;SCOG C[MOderatelypositiveimpact|
| tCt“‘SN__|Strong community support (i.e. petitions; preacts) sss“ = —Cid|s SS [Lowpossitiveimpact, ee CCid
| CC“‘CdéP renvidde's environment educational opportunities | 4 [Lowpossitiveimpact, Cd
| CtC“‘CUifimrpovesamenity = CCC“‘“‘(‘!COC(‘é#dr SCC: ~_—[ Neutral impact (neither positive ornegative)
| _SsSSSSSC_*i Strong community support (ie. petitions; preacts) | 2 [Neutral impact (neither positive ornegativey)——SSSSSSCSC—=*d
Pp CC—“‘CNC*iNGQCOmmunitysupport —C“‘“‘SCC‘d#S#T“CS#COCXCC#dNegattive impact CC“‘CC‘ids
| C“‘CC#d‘ENCOUFaQES UNACCEptable social behaviour CL Negativeimpact, Cd
GN
riskassessment [Extreme - Necessary toremedyorpreventanextremerisk | ~—10_—[Al most certain asset will fail with potential major outcome
| CCC“‘!CCRequired to conform to non-retrospective legislation |S 9([Required to conformtonon-retrospective legislation
| C—“‘C_C[High-Necessarytoremedyorpreventahighrisk ss Cs| SB [Likely assetwillfailifinteventionsnottaken
PSS~*~*~*~*~*~*S*SCSC*dMderate - Necessary to remedy or prevent amoderate risk | __6 [Possible asset will fail if interventionnot taken SSCS
| C“‘CCCReucing financial risk associated with deferred liability ss | = 4 [Reducing financial risk associated with deferred liability
Po CtCt*i‘(C*diLOW/- Necessary torremeeddy rrpreeventalowrrisk | 4_—_——([Unllikely asset will failinshortterm
| CCC—“‘(CCCCC[Miinr - Potential risk, deferral of project would NOT increase level of risk | 2 _ insignificant consequences of not proceeding
Project does not remove any health or safety risk (may increase risk) | [new infrastructure may increase Council risk
PT
financial considerations _____|Project is fully externally funded with minor impact on future operating cof 10_'|VeyhighOSOSCSOSCSCSCTC‘<S)
| CCC(tC*diéPravject attracts > 50% external funding no impact on operational costs | = 8 High
| CC“‘(‘!!CiPraect significantly reduces future financial liabilities (operation | 8 High
| ti“(‘(C™™___|Project increases efficiencies & profit margins (Project generates revenue)|_ 8 [High CC
| ti“ twC“‘S™C(C*dé#Prenjetct moderatteely reduces future financial liabilities (operation @ ss || — 6s [Moderately Cd
| C“‘CCiProvjeectt attracts < 50% external funding with moderate impactonfuture | 6 [Moderately
| CC“‘!CCCC Project is fully externally funded with moderate impact onfuture ——|_——4_—_—s[Low positive economicimpact
| tt tttCt~“‘(‘C#C#C#di#FaovidesaCouncilrevenue stream = Cti‘“‘SC#CSCONC#*S~—C[LOWppossitive economicimpact_
| tC“(it‘“‘;C(Provject has no impact on future financial liabilities (operation® | 2——s[Neutral (neither positiveornegativey)
| CCtC*déPrrovjecct is fully extermaally funded and has; significant operational costs | 2 [Negative
| C“‘!!__ CI Project significantly adds to future financial liabilities (operation& | [Negative
a (
Asset @ Services Levels [Project is Renewal of existing infrastructure —~—~=~=*~“‘“‘;C*;*™*C~*d’;*C~«~WO ~~—+(fhere ino changeto the levelofsenice required. SSCSC~*S
| C“‘(‘CC*déP raject is Rehabilitation of existing infrastructure s| S10 There isnochangetothelevelofservicerequired.
PT SSCSCSCSCSCSCSCSCSCSC*i ject is an upgrade off existing infrastructure ——~—~—=~=~S~S~*d;~SCSCS [There sno increase in the levelofservice required.
PT SS~*~*~*S*SCSCSC*di jets Renewal of existing infrastructure ——~=~S~S~*~*~*~*dC*~C*i:CSCS*«diT Nee Ts A MOderate increase in the level Of service required.
| SC*~*~*~*CSCSCSCSCSCSCSC*di roc is Rehabilitation of existing infrastructure —=~=S=S~*~*~*dC*C*i:CSCSC*diT Nee Ts moderate increase in the level of service required. —_—|
PT SS~*~*~*~*S*SCSCSdP ject is an upgrade of existing infrastructure ——~—~—=~S~S~*dtC*~C«i~SC*diTNere is a moderate increase in the level of service required.
[S~*~*~*~*S*SCSCSCSCSC*di jects Renewal of enisting infrastructure —~—~S~S*~S~*wCSCS~SCSC*di Tere ts significant increase in the level of service required. =
| ________ Project is Rehabilitation of existing infrastructure | __4 __|T™here isa significant increase in the level of service required. =
Project is an upgrade of existing infrastructure 2 There is a significant increase in the level of service required.
Page 16 of 51See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.