Skip to the record
Every meeting, every word.

Original source · versioned page text

2014-02-25 Infrastructure & Services Committee Meeting Agenda

of 51

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   25 FEBRUARY 2014


                                                       ATTACHMENT 1




                                                          Page 9 of 51

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                           25 FEBRUARY 2014

           NSC CAPITAL WORKS PROGRAM STATEMENTS                                     ATTACHMENT 1

ObeeNe Steinem’          [Ievesotsermoe iileminmisng uno offecess,                       |
 Objective Statement       To provide bridge infrastructure that meets yet to be agreed
"| sSeisree                                                   eee,
 Principles                 Bridge infrastructure that is capable of carrying traffic safely; is
                           accessible during flood events; provides for key linkages within
                           to be economically sustainable.
 Assets and Level of       This asset class includes pedestrian, bicycle and road bridges.
                            loading and flood immunity.
  Focus Area               The development and delivery of a long term bridge replacement
                            program. Extending the life of existing bridges through
                            rehabilitation treatments where such treatments are cost
                           effective. Inputs include: condition, traffic volumes, demand and
                            risk.

 Sources

                            Provide off-street car parking within an integrated transport
a
 Principles                Car parks are capable of conveying vehicles and pedestrians
                           safely; provide connectivity to the transport network and are
 Assets and Levels of      Council car parks. Levels of service to be adopted by council in

 Sources

 Sbeene Semen’           | vile mnmishg voted ites.                                      |
 Objective Statement        Provide sealed roads that meet yet to be agreed levels of service

                           connectivity and are designed and constructed to be
                           economically sustainable.
 Service                    in relation to traffic capacity.

                           strategies
sas                      ee
 Alternative Funding       State, federal, PIP, LRRS, R2R

                                                                                        Page 9 of 51
Log in to download the original file

2014-02-25 Infrastructure & Services Committee Meeting Agenda(PDF, 4MB).pdf · 4.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.