Council archive · source document
Approved Plan - MCU20-0071 & OPW20-0130 · MCU20/0071
Plans and drawings: the text below has words only, no drawings.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
6,010 12,760 6,290 15,254
B A
Sewer Line Plotted
From Unity Water Records
40.314
7.0
9.0
9.5
7.5
8.0
existing palms 269°59'00"
gate gate retaining to eng. detail
2,011
2,000
2,400
8.5
existing mango
r 7,000 r
slatted
screen
U6 U3
3,000
bed 2 ba ba bed 2
garage garage
drying drying
5,410
5,210 lin lin
existing palm
FL 8.55 e e FL 8.55
study study court
retaining to eng. detail
court terr terr
existing tree stair garden garden stair
200
r r
2,400
moorindil street
bed 2 bed 2
600 ba
U5 U2 ba
179°59'00"
slatted
garage garage drying
drying
16,540
21.082
screen
5,320
lin lin
e e
3,120
FL 8.35 FL 8.35
terr study study terr
court stair garden garden stair court ground floor
denotes GFA area: 92.75sqm
200
r r
x2; Total GFA= 185.5sqm
359°59'00"
1,500
2,400
slatted
bed 2 ba bed 2
U4 U1
25.106
screen
garage garage ba
drying drying
5,410
existing palms lin lin
la e e
3,010
FL 8.15 FL 8.15
terr study driveway study terr
stair stair court
existing tree court
existing palms
BLOCK B gate
garden garden
gate
BLOCK A SITE DATA: New Noosa Plan.
Medium Density Residential
2,500
fenceline
6,565
1800h solid fence bins visitor visitor bins fenceline
to future detail 3,380 1,200 5,400 6,290 5,400 1,200 3,380
gate gate Site Area: 1010sqm
5.
13
3,000
68
Application would be 'Code' Assessable;
4°
2,110
9
59
'0
Proposal: 6 Small Dwellings under 100sqm each
0"
36.291 existing tree Site Cover: 45% ; 454 sqm allowed (building footprint)
new crossover 89°59'00" 399.96sqm actual.
to eng. detail
Plot Ratio 0.5 :1 ; 505sqm allowed
(6 small dwellings @ 84sqm max)
existing footpath Ground Floor: 185.5sqm, First Floor: 319sqm
504.5sqm actual (excludes stair, terraces & garage.)
remove existing crossover
& reinstate kerb & channel Landscaping: 35% site area (60% of which is soft) : 353sqm req'd / 211sqm soft.
413sqm total / 376sqm soft landscaping provided
Parking: Minimum 1 covered space per unit plus
toolar street 1 visitor space per 4 units (2)
0 2000 5000 10000 20000 B A
ground floor plan
scale
Client Location Drawing Scale Drawn
THYNNE PROPERTY GROUND FLOOR PLAN 1:200 @ A3 AM
24 MOORINDIL STREET
62 hilton terrace Project TEWANTIN Drawing no. Page Date
noosaville (07) 5449 9066
[email protected] QBSA reg. 65073
PROPOSED 6 UNIT
DEVELOPMENT
18.1219.1B
1B DEC 2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 sections
Section 2
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
6,610 11,620 7,370 11,620 3,095
B A
40.314
7.0
9.0
9.5
7.5
8.0
269°59'00"
2,000
kit living ens bed 1
U6 U3 bed 1 ens living kit
5,410
FL 11.40 lin lin FL 11.40
balc dining r r dining balc
stair stair
200
moorindil street
kit kit
U5 U2
179°59'00"
living ens ens living
bed 1 bed 1
21.082
5,320
FL 11.20 lin lin FL 11.20
balc dining r r dining balc
stair stair first floor
denotes GFA area: 159.5sqm
200
x2; Total GFA= 319sqm
359°59'00"
kit kit
U4 U1
25.106
living ens living
bed 1 bed 1 ens
5,410
FL 11.00 lin lin FL 11.00
balc dining r r dining balc
stair stair
BLOCK B BLOCK A
6,565
5.
13
68
4°
9
59
'0
0"
36.291
89°59'00"
toolar street
0 2000 5000 10000 20000 B A
first floor plan
scale
Client Location Drawing Scale Drawn
THYNNE PROPERTY FIRST FLOOR PLAN 1:200 @ A3 AM
24 MOORINDIL STREET
62 hilton terrace Project TEWANTIN Drawing no. Page Date
noosaville (07) 5449 9066
[email protected] QBSA reg. 65073
PROPOSED 6 UNIT
DEVELOPMENT
18.1219.2B
2B DEC 2019
Section 3
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
B A
40.314
7.0
9.0
9.5
7.5
8.0
269°59'00"
2,000
6,000 height
6.6m
U6 U3 2,520
height height
8.0m 6.45m
ridge 15.665 ridge 15.665
height height
7.98m 6.54m
dn 200 dn 200
moorindil street
179°59'00"
U5 U2
21.082
ridge 15.465 ridge 15.465
height height
7.84m 6.46m
dn 200 dn 200
359°59'00"
25.106
colourbond colourbond
custom orb roofing
@ 15° pitch ridge 15.265 U4 U1 custom orb roofing
ridge 15.265 @ 15° pitch
height height
7.71m 6.305m
BLOCK B BLOCK A
6,565
6,557
6,000
5.
13
68
4°
9
59
'0
0"
36.291
89°59'00"
toolar street
0 2000 5000 10000 20000 B A
roof plan
scale
Client Location Drawing Scale Drawn
THYNNE PROPERTY ROOF PLAN 1:200 @ A3 AM
24 MOORINDIL STREET
62 hilton terrace Project TEWANTIN Drawing no. Page Date
noosaville (07) 5449 9066
[email protected] QBSA reg. 65073
PROPOSED 6 UNIT
DEVELOPMENT
18.1219.3B
3B DEC 2019
Section 4
colourbond custom orb roofing colourbond custom orb roofing
Hardie Linea weatherboards. Hardie Linea weatherboards.
paint finish paint finish
powdercoated alum
privacy screen
between balconies powdercoated alum framed
privacy slats over bedroom window
FL 11.00
FL 8.15
feature garage door to
future detail
U4 U1 U3 U2 U1
BLOCK B BLOCK A BLOCK A
north elevation east elevation
colourbond awning over windows colourbond custom orb roofing
Hardie Linea weatherboards.
4,300 paint finish
powdercoated alum powdercoated alum framed
2,550
privacy screen windows to future schedule
FL 11.40 between balconies powdercoated alum framed
balustrading to future detail
300
FL 8.55
2,550
U3 U6 U6 U5 U4
BLOCK A BLOCK B BLOCK B
6,565
south elevation 2,000 6,565
east elevation 2,000
ridge 15.465 ridge 15.665 ridge 15.465 ridge 15.665
ridge 15.265 height height colourbond custom orb roofing ridge 15.265 height
height 7.98m height height
7.84m 6.54m
boundary
7.71m 6.305m 6.46m
Hardie Linea weatherboards.
paint finish
boundary
boundary
2,550
2,550
powdercoated alum framed powdercoated alum framed
privacy slats over bedroom window windows to future schedule
FL 11.40 FL 11.40
6,100
300
feature garage door to
2,850
future detail
boundary
FL 8.55 FL 8.55
2,550
FL 8.15
U4 U5 U6 U1 U2 U3
-
BLOCK B BLOCK A note;
courtyard fences
APPROVED PLAN omitted for clarity.
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
west elevation 0 2000 5000 10000 20000 west elevation painted timber paling
fencing is proposed
12 NOVEMBER 2020
- scale
Client Location Drawing Scale Drawn
THYNNE PROPERTY ELEVATIONS 1:200 @ A3 AM
24 MOORINDIL STREET
62 hilton terrace Project TEWANTIN Drawing no. Page Date
noosaville (07) 5449 9066
[email protected] QBSA reg. 65073
PROPOSED 6 UNIT
DEVELOPMENT
18.1219.4B 4B DEC 2019
Section 5
-
8.0m height line APPROVED PLAN
ridge 15.665
height
6.54m
ridge 15.465
height ridge 15.265 MCU20/0071 & OPW20/0130
6.46m height
6.305m NOOSA COUNCIL
12 NOVEMBER 2020
prefabricated
-
roof trusses
4,265
living living
2,550
living
FL 11.40 FL 11.20 FL 11.00
garage
2,850
garage garage
natural ground line U3 FL 8.55
plotted from 3D
terrain model
U2 FL 8.35 U1 FL 8.15
long section A
BLOCK A
ridge 15.665
ridge 15.465 height
ridge 15.265 height 7.98m
8.0m height line
200
height 7.84m
7.71m
prefabricated
roof trusses
4,265
2,550
living living
living
FL 11.20 FL 11.40
FL 11.00
garage
2,850
garage garage
U5 FL 8.55 U6
FL 8.15 U4 FL 8.35
natural ground line
plotted from 3D
long section B terrain model
BLOCK B
Client Location Drawing Drawn Scale
SECTIONS AM 1:100@A3
THYNNE PROPERTY
24 MOORINDIL STREET
Project TEWANTIN Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED 6 UNIT
DEVELOPMENT
18.1219.5B MAR 2011 5B
Section 6
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
RESIDENTIAL
DEVELOPMENT
RESIDENTIAL
DEVELOPMENT
Issue:
Annotation by Council:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
Concrete public footpath must be provided along the full frontages
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
of the development site in accordance with conditions of this permit Title:
and as part of the operational works for this development permit
(MCU20/0071 & OPW20/0130). Project
Date: Drawn Design
Checked: Drg No.
Rev. - 10.06.16
Document Set ID: 21250627
Version: 1, Version Date: 30/09/2020
Section 7
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No.
Rev. - 10.06.16
Document Set ID: 21250627
Version: 1, Version Date: 30/09/2020
Section 8
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
RESIDENTIAL
DEVELOPMENT
RESIDENTIAL
DEVELOPMENT
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
Annotation by Council:
ABN 40 098 481 899
Title:
Concrete public footpath must be provided along the full frontages of
the development site in accordance with conditions of this permit
and as part of the operational works for this development permit
Project
(MCU20/0071 & OPW20/0130).
Date: Drawn Design
Checked: Drg No.
Rev. - 10.06.16
Document Set ID: 21250627
Version: 1, Version Date: 30/09/2020
Section 9
-
APPROVED PLAN
MCU20/0071 & OPW20/0130
NOOSA COUNCIL
12 NOVEMBER 2020
-
RESIDENTIAL
DEVELOPMENT
RESIDENTIAL
DEVELOPMENT
Annotation by Council:
Concrete public footpath must be provided along the full
frontages of the development site in accordance with
conditions of this permit and as part of the operational works
for this development permit (MCU20/0071 & OPW20/0130).
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No.
Rev. - 10.06.16
Document Set ID: 21250627
Version: 1, Version Date: 30/09/2020
Section 10
Annotation by Council: -
APPROVED PLAN
Concrete public footpath must be provided along the full frontages of MCU20/0071 & OPW20/0130
the development site in accordance with conditions of this permit NOOSA COUNCIL
and as part of the operational works for this development permit 12 NOVEMBER 2020
-
(MCU20/0071 & OPW20/0130).
RESIDENTIAL
DEVELOPMENT
RESIDENTIAL
DEVELOPMENT
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn Design
Checked: Drg No.
Rev. - 10.06.16
Document Set ID: 21250627
Version: 1, Version Date: 30/09/2020
Section 11
3 COR neg 3 COR neg
LEGEND
Fence and Gate to
Fence and Gate to 1 ALP cae Architects detail 1 ALP cae SURFACE FINISHES
3 COR neg 1 COR neg
Architects detail 2 COR neg 2 COR neg Turf Type 1
1 ALP cae 2 COR neg 1 ALP cae 2 COR neg T1 'A' Grade Empire Zoysia
3 ELA eum 3 ELA eum
2 COR neg 7 DIA LJ 3 COR neg
7 SYZ RES Turf Type 2
6 GAR RAD 3 COR neg T2 'A' Grade Couch
3 SYZ CAS
GB1 - Garden Type 1
GB1 General Gardens Typical
PALM
EG-1 EG-1 EG-1 EG-1 Garden Edge
EG-1
// // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // // //
//
//
//
//
//
//
Aluminium / Timber
//
//
//
//
MANGO
//
//
//
//
/
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
EG-1
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
2 COR neg
//
//
//
//
//
//
//
//
//
//
//
//
EG-1
//
//
FEN-1
//
//
//
//
//
//
//
//
//
//
// //
//
//
// //
// //
//
//
//
//
//
//
FEN-1
// //
// //
//
//
// //
5 PHI XAN
// // //
Refer to Architects Details
Where turf is damaged P1 3 DIA LJ 1800mm HT
4 PHI XAN P1
EG-1
5 SCA aem 25 DIA cae 1 ALP cae FEN-2
throughout construction, 3 DIA LJ 25 DIA cae 1 COR neg FEN-2 Refer to Architects Details
//
/ / /
Fence and Gate to
/
1 TRI lau 3 DIA LJ 1800mm HT
make good again
1 GAR rad Architects detail Pavers Type 1
In Gravel Type 1
NBN
/
T1 P1 P1
3 COR neg EG-1 Retaining wall,
/
PALM 4 NEO FB
EG-1
3 NEO FB 5 PHI XAN detailed by
EG-1 5 PHI XAN 3 COR neg 2 NEO she engineer
/
EG
8 SYZ RES
-1
MOORINDIL STREET
// // // //
//
4 GAR FLO
4 SYZ RES 3 VIO hed 1 ARC cun
3 SYZ CAS 5 GAR FLO 3 RHA exc 5 SYZ RES
1 COR neg
EG-1
//
/
3 DIA LJ
EG-1
1 GAR rad
EG-1 P1
T2 P1
Section 12
EG-1
/
30 DIA LJ
3 VIO hed 4 NEO FB
EG-1 T1 3 RHA exc 3 NEO she
/
3 ELA eum // // //
2 SYZ RES // 4 GAR FLO
3 SYZ CAS 8 SCA aem 5 PHI XAN 1 ARC cun
1 ARC cun 3 COR neg
EG-1
/
//
EG-1
6 NEO SHE 1 COR neg
PALM 1 GAR rad 3 DIA LJ
7 PHI XAN
EG-1
EG-1 P1
4 SYZ RES P1 5 COR neg
/
P1 EG-1 9 SYZ RES
8 DIA cae 5 DIA cae Bin Enclosure, Fence and
4 COR neg
SE
T1 5 GAR rad Gate to Architects detail
PALM 6 DIA LJ
/
7 COR neg
3 SYZ RES + 6 SCA aem P1 8 DIA cae
P1
EG-1
EG-1
6 DIA LJ
EG
Where turf is damaged
SE
-1
+ 6 SCA aem T1
EG-1
throughout construction,
EG-1
PALM EG-1
EG-1
make good again
/
//
//
CORYMBIA
EG-1 5 CAL GBF 4 COR neg EG-1 EG-1
// // //
Turf around existing trees / // // //
EG
SE
EG-1 9 DIA LJ EG-1
-1
and avoid damage to root 1 ELA eum Bin Enclosure, Fence and
//
//
//
//
TEL.P Gate to Architects detail 7 COR neg
7 DIA LJ 5 CAL GBF 2 ALP cae
/
ball
/ / / 9 SYZ CAS 4 MEL aff 2 CUP ana 4 MET aff 6 SYZ CAS / / / /
//
2 CUP ana
//
Fence and Gate to
//
8 GAR rad
SE
LEGEND // // // // Architects detail
EG-1
PLANTING
EG-1 10 DIA LJ EG-1 6 LOM SHA 3 ARC cun
GROUNDCOVERS/SHRUBS 14 DIA LJ 12 JUN con
3 ARC cun 8 CAL GBF EG-1 EG-1
SE
PALM
EG-1
HEDGES
F WM 8 CAL GBF T2
ACCENT SHRUBS T2
SE
V FH
GRASSES
E
SE
E E E E E E E E E E
TREES E E E E E E E E E E E E E E E E E E E E E E
T2
-
EXISTING TREE APPROVED PLAN
SE
TREE
TO BE RETAINED
MCU20/0071 & OPW20/0130
Existing footpath to be NOOSA COUNCIL
retained New driveway crossover. 12 NOVEMBER 2020
SE
EXISTING TREE -
TREE
TO BE REMOVED Where turf is damaged TOOLAR STREET Refer to civil engineer for
throughout construction, details
make good again
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN NOT FOR CONSTRUCTION
A
B
C
2020.02.14
2020.02.24
2020.02.25
For Approval
Amendment - For Tender
OPW / For Tender
PS
PS
PS
AL
AL
AL
CD-001 scale: 1:75A1; 1:150@A3 D 2020.10.09 Amendment - For Approval AK CS
E 2020.10.09 Amendment - For Approval AK CS
24 MOORINDIL STREET, TEWANTIN F 2020.10.12 Amendment - For Approval AK CS
NORTH
JOB NUMBER: 20024 CLIENT NAME: Thynne Property Trust
Section 13
LANDSCAPE NOTES
EXTENT OF WORKS 7. Containerised plant material - supply and installation 9. Turf - supply and lay
All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in Obtain turf from a specialist grower of cultivated turf.
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 20024 Turf notes:
accordance with the scheduled nomenclature, well formed, hardened off nursery stock. They are to be container grown in
Landscape Plan CD-001. Contractor to ensure they have the latest issue of the documents prior to tendering - "A" Grade Buffalo 'Sir Walter' turf as per Material Schedule with a minimum sod depth of 25 mm
potting mixture with a healthy root system and not pot bound. All pots shall be free of weeds and plant stock is to be free
and construction. Contractor should also take full account of documentation of Architectural, Civil Engineering - Turf to be laid within 24 hours of being cut and on day of delivery.
from living insects, pests and disease. All plants are to be fully sun or shade hardened-off to suit their on-site growing
and Electrical Engineering Works which will be made available on site. Hard surface layout is to be at the - Grade turf areas evenly with falls to drains.
position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed plant stock within the 12 - Allow for ground preparation and deposition of 75 mm imported premium quality garden loam topsoil.
discretion of the Project Manager. Where there is conflicting information, contact the Landscape Architect.
month maintenance period. It is therefore recommended that the Contractor does not accept below Standard stock from - Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications).
the Nursery/Supplier. - Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is
Landscape works for this contract are to include the following: Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, flush with adjacent finished surfaces.
and in the event of supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock - Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a
1. Co-ordination with other Trades and conduit installation arriving to site, a Nursery inspection including the Landscape Architect and Landscape Contractor is required. The plant flush finish at at the end of the maintenance period.
2. Excavation and Drainage of planting areas supplier is to ensure all stock (or good selection of stock) is present during the inspection. It is also recommended that the - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any
3. Topsoil - Supply and incorporation Landscape Architect is on site to inspect plant stock and plant set out prior to planting. gaps or undulations with coarse washed sand.
4. Edging to planting areas where not already supplied - Keep lawn moist until established and rooted in. Install temporary barriersn(flagging tape) to ensure
5. Irrigation system Plant stock notes: walking and driving on turf areas is prevented and avoided.
6. Shaping of garden areas 1. Container sizes are noted as follows:- - Replace failed turf and relay with new turf.
7. Containerised Plant Material - Supply and installation - Pots in millimetres.
8. Organic Garden Mulch - Supply and Spread - Bags in litres. 10. Services
9. Turf - Supply and lay 2. Stock may be rejected if plants are:- The location of all underground or overhead services shown on these drawings are indicative only. They have
10. Install landscape pavements as shown on drawings - Undersized proportional to specified container size or if the root system is underdeveloped. been incorporated at the design or Council Approval stage for general information. The Landscape Contractor
11. Maintenance of landscape works (3 months) - Oversized proportional to specified container size or severely root bound. shall be responsible for liaising with the Principal Contractor to determine where the 'As Constructed' location
of all water, sewer, stormwater, electrical,communication or other existing services before commencing any
- Unbalanced or uncharacteristic of normal or specified growth pattern for the species.
excavation works.
- Not suitably acclimatised for the specific environment.
- Diseased, infested with pests or suffering from other form of significant stress. 11. MAINTENANCE OF LANDSCAPE WORKS
1. Co-ordination with other trades - Have poor root development or root defects.
Contractor is to make full allowance for the reasonable activities of other trades. 3. Substitution of specified plant species only by written instruction from Landscape Architect. Where directed by the Principal Contractor all must comply with soil and erosion control measures.
Contractor shall allow for the installation of electrical services for landscape lighting at the appropriate time in
The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges,
the construction program. Contractor shall pay due consideration to installation of irrigation lines so as to Implementation notes: replacing failed or under-performing plant stock at the end of the Maintenance Period. All Council controlled
minimise disturbance to planted areas. The coordination of appropriate conduit lines forms part of this Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management works to be inclusive of a twelve (12) month maintenance program.
contract.
environment of this project. The following minimum is expected:
- Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the Maintenance and Inspection Program
Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured Responsibility Weeks after practical completion Maintenance Inspection
base of the hole to a further depth of 100mm and loosen the sides of the hole.
concrete curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be Frequency
- Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure
rectified at the contractors expense. Any disputes will be settled by the site Superintendent. Contractor 0-2 3 per week
it is central and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed.
- Ensure correct placement of fertiliser as listed in materials schedule and/or water retention additive as per \ Contractor 3-4 2 per week
Removal of Debris Contractor 5 - 13 1 per week
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout manufacturer's specification and requirements.
Contractor 14 - onwards As per established maintenance regime
construction of landscape works. Planting areas are to contain planting and selected drainage materials only - Thoroughly water plants immediately after planting and at such times during the contract period as required.
and are not to contain any building material waste. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. Maintenance Program General Notes
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that - Maintenance inspection frequencies are minimum.
2. Excavation and drainage of planting areas topsoil is not placed over the top of the rootball. - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve - All plants should be watered in with Sea Change KFF by Nutri-Tech Solutions and diluted as per manufacturers levels are critical during early establishment. Avoid over irrigating planting areas.
required planting depths. Excavate site soil as required to ensure consistent high quality planting material. recommendation - Mow turf every 2 weeks.
Break up existing subgrade to a depth of 100mm. Any excavated planting areas are to be scarified at sides to - Prune and shape all shrubs and trees on a monthly basis as required.
provide anchorage for future root development. Additional excavation works will be required in areas of All tree stock within the landscape works must be healthy, true to form and free of defects. - Remove all stakes at 90 day inspection, or after satisfactory establishment.
advanced plant material. Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor to tease - Fertilise all garden beds and street trees at 3 months.
Drainage is to be incorporated to all planting areas that are enclosed by hard edging and not otherwise out roots and prune as required to encourage healthy root development. Contractor is not to accept trees which are not of - Contractor shall maintain an up to date written log book to record inspection observations and actions.
drained. Contractor should allow for drainage to all garden areas. a high quality or grown to best horticultural practice. All tree stock to be inspected at unloading and prior to planting. - The log will be made available to the site superintendent, upon request, at any time for examination.
Trees that fail to meet the above criteria are not be planted and are to be returned to the Nursery/Supplier.
3. Topsoil - supply and incorporation Collect all empty plant containers daily during planting operations and remove from site. Inspection Plan
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil) Do not vary the plant locations from those specified on the drawings unless otherwise directed by the Superintendent. The Contractor shall co-ordinate the following inspections with the site superintendent.
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from Should it be necessary to vary the locations and spacing for any reason, immediately apply for directions by the - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
on site. Top soils are to be tested for horticultural suitability and receive appropriate amelioration if required. confirmation.
Superintendent. Replace failed or damaged plants. This does not include vandalised or stolen plant material - this will be
All topsoil must be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
replaced prior to practical completion.
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to - Pre-planting inspection - at commencement of placement of advanced plant material.
prevent any ponding. Prevent excess compaction by construction plant. Stripped site topsoil needs to be - Setout inspection - at first setout of containerised plant stock.
Establishment notes:
stored in piles no greater than 2m high x 3m wide. Topsoil storage piles for storage greater than 4 months - "On Maintenance" - at practical completion.
The Establishment Period commences at the date of Practical Completion of Works.
should be seeded with a suitable grass mix. Eradicate weeds using environmentally acceptable methods, such - "Off Maintenance" - 180 days after practical completion.
During the Establishment Period maintain best horticultural pratices including (but not limited to) the following items
as a non-residual Glyphosate herbicide in any of its registered formulae, at the manufacturer's recommended where required: watering, weeding, fertilising, pest and disease control, mulching, pruning, rubbish removal and keeping
maximum rate. Noxious weeds need to be screened out of the topsoil prior to placement. the site neat and tidy. rectify defects that become apparent in the works under normal use.
Note soil types for GB1
8. Garden mulch - supply and spread
4. Edging to planting areas
All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch
Edging to Unit planting areas adjoining turf to be hardwood timber edge or equivalent or otherwise stated on
is to be level with the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all
landscape plan. Line of edging to be set out and approved onsite by Landscape Architect prior to the
mulch is placed clear of plant stems to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a
construction.
combination of wood, leaves and bark) with no more than 10% fines nominal 25-50mm size or approved equal.
5. Irrigation Sample to be provided to Landscape Architect for approval prior to installation.
Contractor is to install D&C fully automated irrigation system including pumps, valves, controllers and irrigation - Organic Mulch GB1 -
components. Refer to separate Irrigation Performance Specification. Connection provided to storage tanks and Mulch shall be to a predominant depth of 100mm. Mulch is to be formed to avoid placement against green plant APPROVED PLAN
town water supply. stems and overflow from purpose formed edges, kerbs and pathways. MCU20/0071 & OPW20/0130
6. Shaping of garden areas
NOOSA COUNCIL
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show 12 NOVEMBER 2020
-
planting to best advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical
completion. Contractor is to seek confirmation of finished levels prior to final plantings and application of
mulch.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE NOTES NOT FOR CONSTRUCTION
A
B
C
2020.02.14
2020.02.24
2020.02.25
For Approval
Amendment - For Tender
OPW / For Tender
PS
PS
PS
AL
AL
AL
CD-002 D 2020.10.09 Amendment - For Approval AK CS
24 MOORINDIL STREET, TEWANTIN
JOB NUMBER: 20024 CLIENT NAME: Thynne Property Trust
Section 14
PLANTING SCHEDULE
-
TREES
APPROVED PLAN
Code: Botanical Name: Common Name: Size: Density: Eventual Height x Spread: Staked: CLPR: QTY: MCU20/0071 & OPW20/0130
ARC cun Archontophoenix cunninghamiana Bangalow Palm 25L 1 / m² H = 30m x S = 4.5m YES 9 NOOSA COUNCIL
CUP ana Cupaniopsis anacardioides Tuckeroo 25L 1 / m² H = 8+m x S = 4m YES 4 12 NOVEMBER 2020
ELA eum Elaeocarpus eumundii Eumundi Quandong 25L 1 / m² H = 10m x S = 3.5m YES 10 -
TRI lau Tritaniopsis laurina Luscious Water Gum 25L 1 / m² H = 5m x S = 4m YES 1
All street trees require AS2303:2015 certification required
SHRUBS AND GROUNDCOVERS
Code: Botanical Name: Common Name: Size: Density: Eventual Height x Spread: Quantity:
ALP cae Alpinia caerulea Native Ginger 300mm 1 / m² H = 2m x S = 1.5m 9
COR neg Cordyline Negra Negra Cordyline 200mm 3 / m² H = 2m x S = 0.8m 64
CAL GBF Callistemon Great Balls of Fire Great Balls of Fire 200mm 1 / m² H = 1.5m x S = 1.5m 26
GAR FLO Gardenia augusta Florida Gardenia Florida 200mm 3 / m² H = 1m x S = 1m 13
GAR RAD Gardenia asminoides Radicans Gardenia Radicans 140mm 1 / m² H = 0.3m x S = 0.9m 22
JUN con Juniperus conferta Shore Juniper 140mm 1 / m² H = 0.2m x S = 2m 12
MEL aff Melastoma affine Blue Tongue 200mm 2 / m² H = 2m x S = 1.5m 8
SCA aem Scaevola Aemula Fairy Fan-flower 140mm 3 / m² H = 0.4m x S = 1m 34
SYZ CAS Syzygium Cascade Lilly Pilly 300mm 1 / m² H = 4m x S = 1.5m 24
SYZ RES Syzygium australe Resilience Syzygium Resilience 300mm 1 / m² H = 4m x S = 1.5m 42
PHI xan Philodendron Xanadu Xanadu 200mm 3 / m² H = 1m x S = 1m 18
GRASSES
Eventual Height x Spread:
Code: Botanical Name: Common Name: Size: Density: Quantity:
DIA LJ Dianella caerulea Little Jess Dianella Breeze 140mm 2 / m² H = 0.4m x S = 0.6m 110
DIA cae Dianella caerulea Blue Flax Lily 140mm 5 / m² H = 0.5m x S = 0.5m 76
LOM SHA Lomandra fluviatilis Shara Lomandra Shara 140mm 3 / m² H = 0.4m x S = 0.5m 54
NEO FB Neoregelia Fire Ball Bromeliad 140mm 4 / m² H = 0.5m x S = 1m 11
NEO she Neoregelia She a Neoregelia 140mm 4 / m² H = 0.5m x S = 1m 10
VIO hed Viola hederacea Native Viola 75mm 3 / m² H = 0.15m x S = 1m 8
E
Revision Date Amendment Drawn Checked
APPROVAL ONLY
PLANTING SCHEDULE NOT FOR CONSTRUCTION
A
B
C
2020.02.14
2020.02.24
2020.10.09
For Approval
Amendment - For Tender
Amendment - For Approval
PS
PS
AK
AL
AL
CS
CD-003 D 2020.10.09 Amendment - For Approval AK CS
E 2020.10.12 Amendment - For Approval AK CS
24 MOORINDIL STREET, TEWANTIN
JOB NUMBER: 20024 CLIENT NAME: Thynne Property Trust
Section 15
-
Notes:
- Place the rootball on a firmed base to achieve required FSL. Turf as specified APPROVED PLAN
- Thoroughly water the root ball immediately after planting.
- Number of stakes will vary with pot size. Refer plant schedule. Topsoil MCU20/0071 & OPW20/0130
- Cultivate sides of excavated hole 50mm. - to 100mm depth
Notes: FSL NOOSA COUNCIL
(X)
Cultivate subgrade
- to 150mm depth
- All timber to be CCA pressure treated to 12 NOVEMBER 2020
AS1604, Hazard 5, rough sawn pine. Timber edge -
Existing subgrade - All timber edges to be arissed to comply
with council standards.
- All timber ends to have one coat of Stakes
Cuprinol or equal prior to installation.
Hardwood Stake: - Stakes to be 400mm into ground at max.
25x25x90mm Place 600mm
into the ground. Do not
2 TURF PROFILE 1200mm centres, or as required to obtain
smooth curves. Top of stake to finish
Existing/compacted
/subgrade/subase
CD-200 1:5@A1, 1:10@A3
place through rootball. 20mm below top of timber edge. Where Notes:
Secure with ties by looping timber edges meet at corners provide Angle and space pavers as indicated on working drawing.
in a figure eight pattern. double stakes. If not specified space equally as shown on drawings.
Mulch: Pull away from - All fixings to be hot dipped galv.
FSL Concrete haunch to all edges.
base of plant. - Leading edge is to be free of burrs and
Ensure top of haunch is min.
Mulch splinters.
20mm below surface level.
Form an earthen basin - to 100mm depth
around base of plant. Finished mulch level.
Soil blend or site topsoil TIMBER EDGE STAKES (X) = Height above Refer to plan for type.
- to 300mm depth 38 50 finished surface level FIXINGS
typ. 100
20
50mm Bugle Headed
Topsoil blend FLUSH
Batten Screws.
Fertiliser: Do not allow
100
20mm 75mm Bugle Headed
30
Cultivated subgrade
100
contact with roots.
- to 150mm depth Batten Screws.
100mm
100mm Bugle Headed
Water retention additive 150mm Batten screws.
100x38mm Wet mortar bed 30-50mm
100mm deep compacted sub
50x50mm base: CBR 45 compacted to 95%
standard compaction.
1 140-300mm PLANTING 3 GARDEN BED PROFILE 4 EDGE TYPE 1 5 CONCRETE STEPPERS
CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:5@A1, 1:10@A3 CD-200 1:10@A1, 1:20@A3
Timber garden edge Steppers through garden
MATERIALS & FINISHES SCHEDULE
CODE / ITEM REQUIREMENTS
Notes:
- Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting. Garden Edge Type 1 100x38mm Treated pine garden edging surround with 500x38x38mm treated pine pegs at
- Cultivate sides of excavated hole 50mm deep. (EG-1) Nom.1200mm centres. Refer to detail for installation
- Do not disturb kerb, road pavement or road side drainage works.
- Tease out roots on side of rootball when planting. Paving Type (P1) Adbri Masonry 400 x 600mm concrete paver. Colour 'Zurich' to be installed as per detail. Surround
pavers with 20-40mm dia 'Roma' pebble from Doonan sand and gravel, laid 75-100mm thick.
- Ensure top of rootball is not buried; expose and set flush with finished level.
Turf Type 1 (T1) A-Grade 'Empire' Zoysia. Laid as per detail shown on CD-901
Turf Type 2 (T2) A-Grade 'Couch' Wintergreen. Laid as per detail shown on CD-901
Garden Bed Type 1 (GB1) Internal grade typical, 300mm depth amended site or imported topsoil to specification. Apply
Nutri-Tech Solutions, 'Life Force Gold' and 'Life Force Carbon' to all garden beds and water in all
plants with 'SeaChange KFF' cover with 100mm thick Organic 25mm Hoop Pine Mulch, refer to detail
CD-901
Hardwood stake: Place 600mm
into the ground. Do not place
through rootball. Secure with
ties by looping in a figure eight
pattern.
Raise plant 50mm above
finished surface level.
Mulch: Pull away from base
of plant.
Form an earthen basin
around base of plant.
Topsoil blend
min 300
Water retention additive
Fertiliser: Do not allow 1
fertiliser to come in 1
contact with roots.
width (w)
10 - 20mm Drainage gravel
2xw
6 45-200ltr PLANTING
CD-200 1:10@A1, 1:20@A3
Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
C
14/02/2020
2020.02.24
2020.02.25
For Discussion
Amendment - For Tender
OPW / For Tender
AL/PS
PS
PS
CS
AL
AL
CD-200 scale as noted
24 MOORINDIL STREET, TEWANTIN
JOB NUMBER: 20024 CLIENT NAME: Thynne Property Trust
Used in these records
Approved Plan - MCU20-0071 & OPW20-0130.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.