Council archive · source document
Approved Plan - MCU20-0071 & OPW20-0130 · MCU20/0071
Plans and drawings: the text below has words only, no drawings.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
- Notes: - Place the rootball on a firmed base to achieve required FSL. Turf as specified APPROVED PLAN - Thoroughly water the root ball immediately after planting. - Number of stakes will vary with pot size. Refer plant schedule. Topsoil MCU20/0071 & OPW20/0130 - Cultivate sides of excavated hole 50mm. - to 100mm depth Notes: FSL NOOSA COUNCIL (X) Cultivate subgrade - to 150mm depth - All timber to be CCA pressure treated to 12 NOVEMBER 2020 AS1604, Hazard 5, rough sawn pine. Timber edge - Existing subgrade - All timber edges to be arissed to comply with council standards. - All timber ends to have one coat of Stakes Cuprinol or equal prior to installation. Hardwood Stake: - Stakes to be 400mm into ground at max. 25x25x90mm Place 600mm into the ground. Do not 2 TURF PROFILE 1200mm centres, or as required to obtain smooth curves. Top of stake to finish Existing/compacted /subgrade/subase CD-200 1:5@A1, 1:10@A3 place through rootball. 20mm below top of timber edge. Where Notes: Secure with ties by looping timber edges meet at corners provide Angle and space pavers as indicated on working drawing. in a figure eight pattern. double stakes. If not specified space equally as shown on drawings. Mulch: Pull away from - All fixings to be hot dipped galv. FSL Concrete haunch to all edges. base of plant. - Leading edge is to be free of burrs and Ensure top of haunch is min. Mulch splinters. 20mm below surface level. Form an earthen basin - to 100mm depth around base of plant. Finished mulch level. Soil blend or site topsoil TIMBER EDGE STAKES (X) = Height above Refer to plan for type. - to 300mm depth 38 50 finished surface level FIXINGS typ. 100 20 50mm Bugle Headed Topsoil blend FLUSH Batten Screws. Fertiliser: Do not allow 100 20mm 75mm Bugle Headed 30 Cultivated subgrade 100 contact with roots. - to 150mm depth Batten Screws. 100mm 100mm Bugle Headed Water retention additive 150mm Batten screws. 100x38mm Wet mortar bed 30-50mm 100mm deep compacted sub 50x50mm base: CBR 45 compacted to 95% standard compaction. 1 140-300mm PLANTING 3 GARDEN BED PROFILE 4 EDGE TYPE 1 5 CONCRETE STEPPERS CD-200 1:10@A1, 1:20@A3 CD-200 1:10@A1, 1:20@A3 CD-200 1:5@A1, 1:10@A3 CD-200 1:10@A1, 1:20@A3 Timber garden edge Steppers through garden MATERIALS & FINISHES SCHEDULE CODE / ITEM REQUIREMENTS Notes: - Place the rootball on a firm base. - Thoroughly water the root ball immediately after planting. Garden Edge Type 1 100x38mm Treated pine garden edging surround with 500x38x38mm treated pine pegs at - Cultivate sides of excavated hole 50mm deep. (EG-1) Nom.1200mm centres. Refer to detail for installation - Do not disturb kerb, road pavement or road side drainage works. - Tease out roots on side of rootball when planting. Paving Type (P1) Adbri Masonry 400 x 600mm concrete paver. Colour 'Zurich' to be installed as per detail. Surround pavers with 20-40mm dia 'Roma' pebble from Doonan sand and gravel, laid 75-100mm thick. - Ensure top of rootball is not buried; expose and set flush with finished level. Turf Type 1 (T1) A-Grade 'Empire' Zoysia. Laid as per detail shown on CD-901 Turf Type 2 (T2) A-Grade 'Couch' Wintergreen. Laid as per detail shown on CD-901 Garden Bed Type 1 (GB1) Internal grade typical, 300mm depth amended site or imported topsoil to specification. Apply Nutri-Tech Solutions, 'Life Force Gold' and 'Life Force Carbon' to all garden beds and water in all plants with 'SeaChange KFF' cover with 100mm thick Organic 25mm Hoop Pine Mulch, refer to detail CD-901 Hardwood stake: Place 600mm into the ground. Do not place through rootball. Secure with ties by looping in a figure eight pattern. Raise plant 50mm above finished surface level. Mulch: Pull away from base of plant. Form an earthen basin around base of plant. Topsoil blend min 300 Water retention additive Fertiliser: Do not allow 1 fertiliser to come in 1 contact with roots. width (w) 10 - 20mm Drainage gravel 2xw 6 45-200ltr PLANTING CD-200 1:10@A1, 1:20@A3 Revision Date Amendment Drawn Checked APPROVAL ONLY CONSTRUCTION DETAILS NOT FOR CONSTRUCTION A B C 14/02/2020 2020.02.24 2020.02.25 For Discussion Amendment - For Tender OPW / For Tender AL/PS PS PS CS AL AL CD-200 scale as noted 24 MOORINDIL STREET, TEWANTIN JOB NUMBER: 20024 CLIENT NAME: Thynne Property Trust
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plan - MCU20-0071 & OPW20-0130.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.