Original source · versioned page text
Swmp
Very large file (28.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
The Music Model was set up in accordance with the Water By Design Music Modelling Guidelines for
South East Queensland. Design parameters are listed below:
BR-A
• Surface Area = 85m2
• Filter Media Area = 50m2
• Filter Depth = 0.4m
• Extended Detention = 0.2m
• Hydraulic Conductivity = 180mm/ Hr
• TN content of Filter Media = 500mg/ kg
• Orthophosphate content of Filter Media = 5mg/ kg
BR-B
• Surface Area = 30m2
• Filter Media Area = 25m2
• Filter Depth = 0.4m
• Extended Detention = 0.2m
• Hydraulic Conductivity = 180mm/ Hr
• TN content of Filter Media = 500mg/ kg
• Orthophosphate content of Filter Media = 5mg/ kg
Figure 5.1 displays a print screen of the MUSIC Model Schematic for the proposed development and
Figure 5.2 displays the annual pollutant loads that will be discharged from the proposed development.
SCG Consulting Engineers Page 13 SCG Ref: 33132(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.