Original source · versioned page text
Swmp
Very large file (28.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
Table of Contents
1.0 INTRODUCTION ................................................................................................................................... 3
2.0 EXISTING SITE DESCRIPTION ......................................................................................................... 4
3.0 PROPOSED DEVELOPMENT ............................................................................................................. 5
4.0 EXISTING DRAINAGE.......................................................................................................................... 5
4.1 Existing Drainage Infrastructure ............................................................................................................. 5
4.2 Existing Drainage Patterns ........................................................................................................................ 6
4.3 Lawful Point of Discharge ........................................................................................................................... 7
5.0 STORMWATER QUALITY .................................................................................................................. 8
5.1 State Planning Policy and Water by Design Assessment ................................................................. 8
5.2 Construction Phase ....................................................................................................................................... 9
5.2.1 Silt and Sediment Erosion ...................................................................................................................................... 9
5.3 Completed Development.......................................................................................................................... 10
5.3.1 Water Quality Objectives ..................................................................................................................................... 10
5.3.2 Sources of Contaminants ..................................................................................................................................... 10
5.3.3 Proposed Treatment Measures ......................................................................................................................... 12
5.3.4 Pollutant Modelling ................................................................................................................................................ 12
6.0 STORMWATER QUANTITY ............................................................................................................ 15
6.1 Drains Analysis ............................................................................................................................................ 15
6.1.1 Existing Catchments .............................................................................................................................................. 16
6.1.2 Existing Site ............................................................................................................................................................... 16
6.1.3 Proposed Site ............................................................................................................................................................ 17
6.1.4 Peak Flow Comparison ......................................................................................................................................... 18
6.1.5 Peak Flow Mitigation (OSD) ............................................................................................................................... 18
6.2 Proposed Drainage .................................................................................................................................... 22
6.3 Downstream Infrastructure Consideration ...................................................................................... 22
7.0 FLOODING ........................................................................................................................................... 22
8.0 CONCULSION ...................................................................................................................................... 23
APPENDIX A – Detailed Site Survey ........................................................................................................ 24
SCG Consulting Engineers Page 1 SCG Ref: 33132(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.