Council archive · source document
Development Application part 1 · OPW13/0675
Very large file (28.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCC CORRESPONDENCE
Place barcode here 1111111111111111111111111
X0009530
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
Checklist \ Part -.L. Of
(Please Circle)
_
BOX’OOaD.,J.. R ..{.O.....f5. ’f.
3 SEP 2013
~aroochydore
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 38 pages
Page 2
c ~
,-. .+-,
v’ ~~
/PRECISION I
IDf!!IWliii
r1I:
.f*"iII
dFEP
SUNSHINE COAST
"MMI~l~/jll8i
URBAN CON S U L TAN T S
Tuesday, 3 September 2013
M1717_02-002
Chief Executive Officer
Sunshine Coast Regional Council
Development Assessment D(9L’.
10 First Avenue
$/0
MAROOCHYDORE Q 4558 ’/J1l}.
$I)t
().J Co
Att: Chief Executive Officer
~ S~p ~I)~<9r
Re: Noosa Domain Pty Ltd ~rO ’?t7&
Noosa Domain Retirement Village (Temporary Construction Ac qh’
j1osaville
=:J IDAS Development Application -
Engineering Operational Works 0’0r.(9
:J Council Reference: 2004/5744 (N.S.C.)
:J Dear Sir/Madam,
~
~ We forward herewith our application for engineering operational works associated with construction of a
temporary construction access off Eenie Creek Road to service the Noosa Domain Retirement Village at Noosaville
for Council approval. We enclose information relevant to this application as follows:
IIII IDAS Development Application Form 1 (Application Details) and Form 6 (Building or Operational Work) & IDAS
III Checklist 4 Operational Work
-
Engineering Drawing Nos. M1717E 2 R01 to R04 & SL01 (3x A3 copies)
Drawing Transmittal dated 28 August, 2013
JIIII JFP Urban Consultants Value of Works Estimate
SPA Mandatory Information Compliance Checklist
Copy of SCRC email dated 5 November 2010
I The proposed development work is in accordance with the Development Application conditions (2004/5744)and
addresses the Local Government’s planning schemes and any other planning documents relevant to the
~ application through the adoption of Council’s relevant codes.
We have also enclosed a SPA Mandatory Information Compliance Checklist for Civil Engineering works.
We also enclose our Client’s cheque for the amount of $1,535.00 in favour of Council for engineering plan
examination and inspection fees associated with this application, calculated as follows:
tJ General Fee $1535.00 or 0.5% of Estimated Value of Work (JFP =
$1,535.00
~ Estimate $34,650.00) whichever is greatest
TOTAL $1,535.00
Note: Estimated Value of Work includes GST.
1
i!5 PLANNERS BRISBANE SUNSHINE COAST CENTRAL QUEENSLAND
iiI URBAN DESIGNERS JFP House 237.239 Bradman Avenue, Maroochydore 59 Goondoon Street, Gladstone
76 Ernest Street, South Brisbane PO Box 6 Maroochydore Qld 45S8 PO Box 172 Gladstone Qld 4680
!Ill SURVEYORS PO Box 3634 South Brisbane Qld 4101 P 07 5443 2500 F 07 5443 4759 P 07 4839 4100 F 07 4972 5444
I. rli ENGINEERS P 07 3012 0100 F 07 3B46 1959
I LANDSCAPE ARCHITEcTs
I’ JFP URBAN CONSULTANTS PTY LTD ABN 79 OSO 414 045 MEMBERSHIPS UDIA. PCA .
PIA. UDAL SSSI. RPECQ. AILA WEBSITE WWWJFP.COM.AU
Page 3
--
IINII\IIIIlII
_~.
~~
URBANe 0 N S U L TAN T S
Agreement in principal has been granted by Council to locate a temporary construction access off Eenie Creek
Road -
refer to copy of SCRC email dated 5 November 2010 attached to the application.
Please contact the undersigned if you wish to discuss any issues pertaining to this application.
Yours Faithfully,
~
.js;
ANDREW FRASER
Associate Director -
Engineering
JFP Urban Consultants Pty ltd
...---’ Ends: As noted above
cc: Mr Stewart Gull- Noosa Domain Pty Ltd
-----
-I
-~
- -’
~--~I
___I
1~111
JII
JIIII
~
~
II
_~\.I
(’
I, JFP Ref: M1717_02-002
II’ Page 2
Page 4
.
Company owner’s consent to the making of a development application
under the Sustainable Planning Act 2009
I,
7Puc.. ~/~N <J<.1~J1~. {insert name in full]
Director of the below mentioned company and
I, {insert name in full]
{insert position in full- i. e. another director, or a company secretary. Delete the above name and company position if not
applicable, i.e. for a proprietary company that has a sole director who is also the sole company secretary, only that director
needs to complete the owner’s consent]
of NOOSA DOMAIN PTY LTD
as owner of premises identified as follows:
NOOSA DOMAIN RETIREMENT VILLAGE, NOOSAVILLE (LOT 2 on SP 162077)
consent to the making of a development application under the Sustainable Planning Act 2009 by
JFP URBAN CONSULTANTS PTY LTD
adjacent to the premises described above for the purposes of
DEVELOPMENT APPLICATION FOR A DEVELOPMENT PERMIT FOR ENGINEERING
OPERATIONAL WORKS (TEMPORARYCONSTRUCTION ACCESS OFF EENIE CREEK ROAD)
signed on the
~
~’-I<
----
day of &04...1 S.,
{signature of Director]
20
1:1.
{signature of Directorlcompany secretary]
signed on the day of 20
Company seal {if used]
The Sustainable Planning Act 2009 IS administered by the Department of Infrastructure and Planning, Queensland Government.
PP2_0034_43 (A)Version#1 10.12.09
Page 5
Department of State Development, Infrastructure and Planning _
IDAS form 1-Application details
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
complete this form (IDASform 1-Application details)
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA)or the Sustainable
Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
Applicant details (Note:the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on alllDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)
Name/s (individual or company name in full) I Noosa Domain Pty Ltd
For companies, contact name I Andrew Fraser
Postal address C/- JFP Urban Consultants Pty Ltd
PO Box 6
Suburb Maroochydore
State QLD 1 Postcode 14558
Country Australia
Contact phone number I (07) 5443 2500
Mobile number (non-mandatory requirement) I 0438 746 056
Fax number (non-mandatory requirement) 1(07) 5443 4759
Great state. Great opportunity.
.,
Queensland
(;nvprnmpnt _
Page 6
Email address (non-mandatory requirement)
I [email protected]
Applicant’s reference number (non-mandatory
requirement) I M1717/2
11. What is the nature of the development proposed and what type of approval is being sought?
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
D Material change of use D Reconfiguring a lot D Building work 0Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval [(] Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
Temporary construction access for Noosa Domain Retirement Village -
Stage 2 works onwards
d) What is the level of assessment? (Please only tick one box.)
D Impact assessment [{] Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Table C-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
D Material change of use D Reconfiguring a lot D Building work D Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval D Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
D Impact assessment D Code assessment
Table C-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
D Refer attached schedule [{] Not required
IDAS form 1-Application details
Version 3.0-1 July 2013
Page 7
2. Location of the premises (Complete Table 0 and/or Table E as applicable. Identify each lot in a separate row.)
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note:this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
D Street address and lot on plan (All lots must be listed.)
Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/ locality name code and plan no.
i) Eenie Creek Road, Noosaville 4567 2 SP 162077 Sunshine Coast
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note:place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
D GDA94
D WGS84
D other
3. Total area of the premises on which the development is proposed (indicate square metres)
I Not applicable
4. Current use/s of the premises (e.g.vacant land, house, apartment building, cane farm etc.)
I Road reserve (Eenie Creek Road)
IDAS form 1-Application details
Version 3.0-1 July 2013
Page 8
5. Are there any current approvals (e.g.a preliminary approval) associated with this application? (Non-
mandatory requirement)
o No [{] Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
OPW12/0095 23/07/12 23/07/14
6. Is owner’s consent required for this application? (Refer to notes at the end of this form for more information.)
[{] No
o Yes-complete either Table F, Table G or Table H as applicable
Table F
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table G
Name of owner/s of the land I
o The owner’s written consent is attached or will be provided separately to the assessment manager.
Table H
Name of owner/s of the land I
o By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
17. Identify if any of the following apply to the premises (Tick applicable box/es.)
o Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete Table I
o On strategic port land under the Transport Infrastructure Act 1994-complete Table J
o In a tidal water area-complete Table K
o On Brisbane core port land under the Transport Infrastructure Act 1994 (Notable requires completion.)
o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Table I
Name of water body, watercourse or aquifer
Table J
Lot on plan description for strategic port land Port authority for the lot
IDAS form I-Application details
Version 3.0-1 July 2013
Page 9
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
8. Are there any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow,
water etc)
No 0 Yes-ensure the type, location and dimension of each easement is included in the plans submitted
9. Does the proposal Include new building work or operational work on the premises? (Including any
services)
o No Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the
end of this form for more information.)
No-go to question 12 DYes
11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)
o No
o Yes-complete Table L and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6digit number
(dd/mm/yy) starting with A, E, L or P)
,
12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 20091
No
o Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form 1-App/ication details
Version 3.0-1 July 2013
Page 10
13. List below all of the forms and supporting information that accompany this application (Include alllDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
this question does not apply for applications made online using MyDAS)
Description of attachment or title of attachment Method of lodgement to
assessment manager
sara-idas-form-6-building-or-operational-work Over the counter
sara-idas-checklist-4-operational-work Over the counter
Engineering operational works drawings and supporting documentation Over the counter
114. Applicant’s declaration
[l]By making this application, I declare that all information in this application is true and correct (Note:it is unlawful to
provide false or misleading information)
Notes for completing this form
Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1 )(c) of the
Sustainable Planning Act 2009
Applicant details
Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 11
. The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS form 1-Application details
Version 3.0-1 July 2013
Page 11
.
.
Question 12
The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800803481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP),assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
I Council. I have been engaged as the private certifier for the
building work referred to in this application
BSA Certification license Building
Date of engagement Name
number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Name of officer
QLeave project Amount paid form sighted by
Description of the work number
Date paid who sighted the
($) assessment
form
manager
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
tel 13 OGOV (137468)
[email protected] IDAS form 1-Application details
Version 3.0-1 July 2013
www.dsdip.qld.gov.au
Page 12
Department of State Development, Infrastructure and Plann ing _
IDAS form 6-Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
.
complete IDAS form 1-Application details
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA)or the Sustainable
Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
1. What Is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
boxes.)
D Building work-complete Table A o Operational work-complete Table B
Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
b) Are there any current approvals associated with this application? (e.g. material change of use.)
D No D Yes- provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
Great state. Great opportunity.
.,
Queensland
(;nvPrnmpnt _
Page 13
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
[l] Road works [l] Stormwater D Water infrastructure
[l] Drainage works [l] Earthworks D Sewerage infrastructure
D Landscaping [l] Signage D Clearing vegetation under the planning scheme
D Other-provide details
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
[l] No D Yes-specify the number of lots being created I
c) Are there any current approvals associated with this application? (E.g. material change of use.)
D No [l] Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
OPW12/0095 23/07/12 23/07/14
2. What Is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)
3. What Is the dollar value of the proposed operational work? $ 34,650
(Inc GST, materials and labour.)
I Mandatory supporting information
I 4. Confirm that the following mandatory supporting Information accompanies this application
Mandatory supporting information Confirmation of Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1 :100, 1 :200 or 1 :500 are [l]Confirmed Over the counter
recommended scales) which shows the following:
. the location and site area of the land to which the application relates
(relevantlane/)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note:numbering is
required for all lots)
.
any existing or proposed easements on the relevant land and their
function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land.
IDAS form 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 14
A statement about how the proposed development addresses the local [{]Confirmed Over the counter
government’s planning schemes and any other planning documents relevant
to the application.
A statement addressing the relevant part(s) of the State Development D Confirmed
Assessment Provisions (SOAP).
[{]Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1 :50, 1 :100 or 1 :200 are D Confirmed
recommended scales) which show the following:
[{]Not applicable
. the north point
. the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
. the room layout (for residential development only) with all rooms clearly
labelled
. the existing and the proposed built form (for extensions only)
. the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1:100, 1 :200 or 1 :500 are D Confirmed
recommended scales) which show plans of all building elevations and
[{]Not applicable
facades, clearly labelled to identify orientation (e.g. north elevation).
Plans showing the size, location, proposed site cover, proposed maximum D Confirmed
number of storeys, and proposed maximum height above natural ground level
[{]Not applicable
of the proposed new building work.
Plans showing the extent of any demolition that is assessable development. D Confirmed
[{]Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: [{]Confirmed
.
existing and proposed contours D Not applicable
.areas to be cut and filled
. the location and level of any permanent survey marks or reference
stations used as datum for the works
. the location of any proposed retaining walls on the relevant land and their
height
. the defined flood level (if applicable)
. the fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing: [{]Confirmed
.
existing and proposed contours D Not applicable
. the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
. information for each curve including tangent point chainages and offsets,
length, tangent length, superelevation (if applicable) and
curve radii, arc
widening (if applicable)
curve
.kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
.
edge of pavement where kerb is not constructed
.
position and extent of channelisation
.location and details of all traffic signs, guideposts, guardrail and other
street furniture
pavement markings includino details on raised pavement markers
IDAS form 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 15
.
catchpit, manhole and pipeline locations
.
drainage details (if applicable)
.cross road drainage culverts (if applicable)
.concrete footpaths and cycle paths
.location and details for access points, ramps and invert crossings
.
changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: [{]Confirmed
.
existing and proposed contours D Not applicable
.
drainage locations, diameters and class of pipe, open drains and
easements
. manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
. inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: D Confirmed
. kerb lines or edge of pavement where kerb is not constructed [{]Not applicable
. location and levels of other utility services where affected by water
reticulation works
.
pipe diameter, type of pipe and pipe alignment
. water main alignments
. water supply pump station details (if applicable)
. minor reservoir details (if applicable)
. conduits
. location of valves and fire hydrants
. location of house connections (if applicable)
. location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing: D Confirmed
. location of all existing and proposed services [{]Not applicable
. location of all existing and proposed sewer lines and manhole locations
. location of all house connection branches
.kerb lines or edge of pavement where kerb is not constructed
.
chainages
.
design sewer invert levels
.
design top of manhole levels
.
type of manhole and manhole cover
.
pipe diameter, type of pipe and pipe alignment
. location of house connections (if applicable)
.sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing: D Confirmed
. location of all light poles and service conduits [{]Not applicable
. location of all other cross road conduits
.
type of wattage and lighting
.
any traffic calming devices
. additional plans for roundabouts and major roads (if applicable)
. details of any variations to normal aliqnment
IDAS form 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 16
. details of lighting levels.
Applications for operational work involving public utility services
Drawings showing: D Confirmed
.
any existing light poles and power poles [l]Not applicable
.
any existing underground services
.details of proposed services
.alteration to existing services.
Applications for operational work involving landscaping works
Drawings showing: D Confirmed
. the location of proposed plant species [l]Not applicable
.a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
.
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
.the location and type of any existing trees to be retained
.construction details of planter boxes, retaining walls and fences
.the proposed maintenance period
.
irrigation system details.
Privacy-Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (1374 68) IDAS form 6-Bu ding or operational work assessable
[email protected] against a planning scheme
Version 3.0-1 July 2013
www.dsdip.qld.gov.au
Page 17
_f
Andrew Fraser
t~f)f
From: Adrian Hall [[email protected]]
Sent: Friday, 5 November 2010 2:50 PM
To: ’Andrew Fraser’
Cc: Mark Lewis; Nicholas Coluccio
Subject: FW: Noosa Waters Oval
[[]
Andrew
As previously discussed, Council request that the construction access to the retirement village on Walter Hay Drive be
removed, and a formal letter will follow.
Further to this letter, it is acknowledged that access to undertake the pedestrian link from Noosa Northrise to Walter
Hay Dr is due to commence for pre load this year, and Council acknowledge that these works would happen
concurrently with the access road removal, hence the timeframe in our letter indicates removal by 31 December
2010. In addition it is acknowledged that access to the remaining stages of the retirement village will be required to
be arranged prior to those stages commencing. Council have discussed this within the Operational Works Branch,
and agree that an access off Eenie Creek Road, with the appropriate sight distance investigation and access controls,
would be appropriate.
Can you please contact me prior to commencing any of the above works to arrange for updated Pre-Start site
meetings.
Please do not hesitate to contact me if you have any queries.
Regards
Adrian Hall I Unit Coordinator Development Construction
Operational Works Assessment
Sunshine Coast Regional Council
Ph: 07 5475 9907
Fax: 07 5475 9853
Email: [email protected]
Sunshine Coast Regional Council confidential email. Council intellectual
property rights subsist in this message. If you have received this message
in error, please notify the author. Any form of review, disclosure, modification,
distribution and/ or publication of this e-mail message is prohibited without
the express permission of the author.
Please consider the environment before printing this email
To find out more about the Sunshine Coast Regional Council, visit your local office at Caloundra, Maroochydore, Nambour or Tewantin or visit us online at
www.sunshinecoast.qld.gov.au. If correspondence includes personal information, please refer to Council’s Privacy Policy.
This email and any attachments are confidential and only for the use of the addressee. If you have received this email in error you are requested to notify the
sender by return email or contact council on 1300 007272 and are prohibited from forwarding, printing, copying or using it in anyway, in whole or part. Please
note that some council staff utilise Blackberry devices, which results in information being transmitted overseas prior to delivery of any communication to the
device. In sending an email to Council you are agreeing that the content of your email may be transmitted overseas.
Any views expressed in this email are the author’s, except where the email makes it clear otherwise. The unauthorised publication of an email and any
1
Page 18
-.oj
attachments generated for the official functons of counc is strictly prohibited. Please note that counc is subject to the Right to Infonmation Act 2009 (Old)
and Information Privacy Act 2009 (Old).
2
Page 19
-"
"-
"
Department of State Development, Infrastructure and Planning _
Schedule 3 Assessable Development
Checklist 4-0perational work
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This checklist only applies when the development application seeks approval for operational work. Before completing
this checklist, please complete Checklist I-Various aspects of development.
You may complete this checklist as part of your development application. The checklist will:
help you identify whether you need to make a development application for the proposed development
help you identify the relevant Integrated Development Assessment System (IDAS)form you need to complete as
part of your application
assist in identifying the assessment manager or referral agency for development that is assessable development
under schedule 3 of the Sustainable Planning Regulation 2009.
If your development involves reconfiguring a lot, building work or material change of use, it is recommended you
complete Checklist 2-Material change of use, Checklist 3-Reconfiguring a lot, or checklist 5-Building work, where
relevant.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of State
Development, Infrastructure and Planning’s website at www.dsdip.gld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
I Part 1-General questions
1.1 Is the operational work clearing native vegetation on:
freehold land
Indigenous land
any of the following under the Land Act 1994:
land subject to a lease
a road
trust land, other than Indigenous land
land subject to a licence or permit?
[{] No . Continue to question 1.2
0 Yes .
Complete part 2 of this checklist
1.2 Is any of the proposed operational work associated with reconflgurlng a lot and the reconflguration Is
also assessable development?
[{] No . Continue to question 1.3
0 Yes .
Complete part 3 of this checklist
Great state. Great opportunity.
.Queensland
(.;nvpmmpnt _
Page 20
1.3 Does any of the proposed operational work involve taking or interfering with:
water from a watercourse, lake or spring, or from a dam constructed on a watercourse or lake
artesian water as defined under the Water Act 2000, schedule 4
overland flow water
subartesian water
0 No . Continue to question 1.4
D Yes .
Complete part 4 of this checklist
1.4 Is the operational work the construction of a dam,or carried out In relation to a dam, and, because of the
works, the dam must be failure impact assessed?
0 No . Continue to question 1.5
D Yes .
Complete part 5 of this checklist
1.5 Is any of the proposed operational work for agricultural activities or animal husbandry activities (as
defined In the Wild Rivers Ac/2t10~ In a wild river area?
0 No . Continue to question 1.6
D Yes .
Complete part 6 of this checklist
11.6 Is any of the proposed operational work tidal works?
0 No . Continue to question 1.7
D Yes .
Complete part 7 of this checklist
1.7 Is any of the operational work proposed to be carried out completely or partly within a coastal
management district?
0 No . Continue to question 1.8
D Yes .
Complete part 8 of this checklist
1.8 Is any of the proposed operational work for constructing or raising waterway barrier works as defined
under the Fisheries Ac/I!19-n
0 No . Continue to question 1.9
D Yes .
Complete part 9 of this checklist
1.9 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area as defined under the Fisheries Ac/I!19-n
0 No . Continue to question 1.10
D Yes .
Complete part 10 of this checklist
1.10 Is any of the proposed operational work removing, destroying or damaging marine plants as defined
under the Fisheries Ac/I!19-n
I0 No
I. Continue to question 1.11
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 21
DYes Complete part 11 of this checklist
1.11 Does the proposal involve operational works that are high impact earthworks in the Great Barrier Reef
Wetland Protection Area?
III No . End of checklist
D Yes .
Complete part 12 of this checklist
I Part 2-Clearing native vegetation
I 2.1 Do any of the following apply?
The clearing is on premises to which structure plan arrangements apply. D Yes D No
The clearing is clearing, or for another activity or matter, mentioned in schedule 24, part 1 of D Yes D No
the Sustainable Planning Regulation 2009.
The clearing is mentioned in schedule 24, part 2 of the Sustainable Planning Regulation 2009, D Yes D No
as clearing for the particular land.
If you answered yes to any of the above, this aspect of your operational work is not assessable development
If you answered no to ALL of the above, continue to question 2.2
2.2 Is the proposed vegetation clearing for a relevant purpose under the Vegetation ManagementAct 1999,
section 22A for one or more of the following?
A project declared to be a coordinated project under the State Development and Public Works DYes D No
Organisation Act 1971, section 26 outside of a wild river high preservation area under the Wild
Rivers Act 2005
Necessary to control non-native plants or declared pests D Yes D No
To ensure public safety D Yes D No
For establishing a necessary fence, firebreak, road or vehicular track, or for constructing D Yes D No
necessary built infrastructure, (each ’relevant infrastructure’) and the clearing for the relevant
infrastructure can not reasonably be avoided or minimised
A natural and ordinary consequence of other assessable development for which a DYes D No
development approval was given under the repealed Integrated Planning Act 1997, or a
development application was made under that Act, before 16 May 2003 and is outside an area
declared to be a declared area part 2, division 4, subdivision 2 of the Vegetation Management
Act 1999.
For fodder harvesting outside an area declared to be a declared area part 2, division 4, D Yes D No
subdivision 2 of the Vegetation Management Act 1999:
For thinning D Yes D No
For clearing of encroachment D Yes D No
For an extractive industry outside: D Yes D No
. a wild river high preservation area under the Wild Rivers Act 2005, or
. an area declared to be a declared area part 2, division 4, subdivision 2 of the Vegetation
Management Act 1999
For clearing regrowth vegetation on freehold land, indigenous land or leases issued under the DYes D No
Land Act 1994 for agriculture or grazing purposes, in an area shown as a registered area of
agriculture on a registered area of agriculture map in a wild river high preservation area under
the Wild River Act 2000
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 22
The Minister responsible for administering the Vegetation Management Act 1999 is satisfied DYes D No
the development applied for is a for special indigenous purpose under the Cape York
Peninsula Heritage Act 20070utside:
a wild river high preservation area under the Wild Rivers Act 2000, or
an area declared to be a declared area part 2, division 4, subdivision 2 of the Vegetation
Management Act 1999
If you answered no to ALL of the above, then the clearing is not for a relevant purpose and this aspect of the
development is prohibited development. If this is the only aspect of vegetation clearing then that is the end of part
2 of this checklist, otherwise continue to question 2.3
If yes to any of the above, continue to question 2.3
2.3 Is any part of the vegetation clearing on land to which a property development plan under the Wild
Rivers Ac/2005applies?
D No Go to question 2.5
DYes Continue to question 2.4
2.4 Is the proposed vegetation clearing consistent with the property development plan under the Wild Rivers
Ac/2(JOSl
D No This aspect of development is prohibited development and a development application can not be
made for this aspect of development.
If this is the only aspect of vegetation clearing then that is the end of part 2 of this checklist, otherwise
continue to question 2.5.
DYes Continue to question 2.5
2.5 Is the proposed vegetation clearing associated with a material change of use or reconflgurlng a lot for
which referral Is required In relation to clearing vegetation under schedule 7, table 3, item 10 and table 2,
Item 4 of the Sustainable Planning Regulation 2009?
D No The proposed operational work for clearing native vegetation is assessable development and a
development permit is required.
This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Clearing native vegetation state code in the State Development
Assessment Provisions (SOAP).
You must complete IDAS Form 11-Clearing native vegetation
End of part 2 of this checklist
DYes This aspect of development is assessable development. DSDIP may be a concurrence agency for
the application (see schedule 7, table 2, item 4 and table 3, item 10 of the Sustainable Planning
Regulation 2009) and will assess the application against the Clearing native vegetation state code in
the SOAP.
If DSDIP is a concurrence agency for the application, you must refer a copy of your application to
DSDIP.
End of part 2 of this checklist
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 1
Sustainable Planning Regulation 2009, schedule 7, table 2, item 5 and schedule 7, table 3, item 10
Vegetation Management Act 1999, section 22A
I Part 3-0peratlonal work for reconflguring lot a
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 23
3.1 Is any part of the operational work for reconfiguring a lot in a priority development area?
D No . Continue to question 3.2
D Yes . This aspect of the development is not assessable development.
. End of part 3 of this checklist
3.2 Do all of the following apply:
. the land Is In the area of a local government that, under the South East Queensland Water
(Distribution and Retail Restructuring) Act 2009, Is a participating local government for a dlstrlbutor-
retailer
. the participating local government Is the assessment manager
. the development application is made before 1 March 2014
D No . This aspect of the development is assessable development and you will need a development permit.
. The local government will be the assessment manager for the application.
. End of part 3 of this checklist
D Yes . This aspect of the development is assessable development and you will need a development permit
. The local government will be the assessment manager for the application and the distributor-retailer
(or SARA)will be a concurrence agency for the application.
. End of part 3 of this checklist
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 47
I Part 4-Taking or interfering with water
4.1 Is the proposed operational work to be carried out In a priority development area or on premises to
which structure plan arrangements apply?
D No . Continue to question 4.2
D Yes . This aspect of development is not assessable development and does not require a development
permit.
. End of part 4 of this checklist.
4.2 Does any of the proposed operational work involve taking or interfering with water from a watercourse,
lake or spring or from a dam constructed on a watercourse or lake?
D No . Go to question 4.17
D Yes . Continue to question 4.3
4.3 Are the proposed works for any of the following purposes?
Taking water from a watercourse, lake or spring in an emergency situation for a public D Yes D No
purpose or fighting a fire destroying, or threatening to destroy, a dwelling house
Taking water from a watercourse, lake or spring if: D Yes D No
. the water is taken by the owner of land adjoining the watercourse, lake or spring
. the water is taken for domestic purposes or stock purposes
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 24
Taking water from a watercourse, lake or spring for camping purposes or for watering D Yes D No
travelling stock
Using a water truck to pump water D Yes D No
If no to all of the above, continue to question 4.4
If yes to any of the above, this aspect of development does not require a development permit.
- If this is the only aspect of taking or interfering with water proposed then that is the end of part 4 of this checklist
- If there are other aspects of taking or interfering with water proposed, continue to question 4.4
4.4 Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
Sustainable Planning Regulation 2009?
D No . Go to question 4.5
D Yes . This aspect of development is self-assessable development and must comply with any relevant self
assessable code
. If the proposal involves more than one aspect of operational work for taking or interfering with water,
and the other aspect is not self-assessable development, then continue to question 4.5
4.5 Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act
20051
D No . Go to question 4.12
D Yes . Continue to question 4.6
4.6 Do both of the following apply:
The proposed operational work is to be carried out in a wild river high preservation area or a wild
river special floodplain management area
the work Interferes with the flow of water in a watercourse, lake or spring in the area
D No . Go to question 4.8
D Yes . Continue to question 4.7
14.7 Do any of the following apply?
The works are for the maintenance of works as defined under the Water Act 2000 D Yes D No
The works increase the interference with water in Lake Eyre Basin to the extent necessary for D Yes D No
taking water for town water supply demands
The work is authorised wild river operational work for the area D Yes D No
If no to all of the above, then this aspect of the development is prohibited development
- If this is the only aspect of taking and interfering with water proposed, then that is the end of part 4 of this
checklist
- If other aspects of taking and interfering with water are proposed, continue to question 4.8
If yes to any of the above, continue to question 4.8
4.8 Does the proposed operational work involve Interfering with the flow of water in a nominated waterway,
as defined under the WildRIvers Ac/200.5; in a wild river preservation area?
ID No
I. Go to question 4.10
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 25
ID Yes
I. Continue to question 4.9
4.9 Does the proposed work involve any of the following?
The waterway being interfered with is a dam or weir as defined under the Water Act 2000. D Yes D No
The proposed work is authorised wild river operational work for the area D Yes D No
If no to all of the above, then this aspect of the development is prohibited development
- If this is the only aspect of taking and interfering with water proposed, then that is the end of part 4 of this
checklist
- If other aspects of taking and interfering with water are proposed, continue to question 4.12
If yes to any of the above, continue to question 4.10
4.10 Is any part of the proposed works on land to which a property development plan under the WIld Rivers
Act2005applies?
D No . Go to question 4.12
D Yes . Continue to question 4.11
1 4.11 Is the proposed works consistent with the property development plan under the WIldRivers Act200$1
D No . This aspect of development is prohibited development and a development application can not be
made for this aspect of development.
. If this is the only aspect of taking or interfering with water then that is the end of part 4 of this
checklist, otherwise Continue to question 4.12.
D Yes . Continue to question 4.12
14.12 Is the work for a water pump?
D No . Continue to question 4.13
D Yes . A development permit is required and this application will be assessed by DSDIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SDAP.
. You must complete IDAS form 13-Watercourse pump
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.13
1 4.13 Is the work for water storage (other than for a dam requiring failure Impact assessment)?
D No . Continue to question 4.14
D Yes . A development permit is required and this application will be assessed by DSDIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SDAP.
. You must complete IDAS form 14-Water storage
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.14
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 26
4.14 Is the work for gravity diversion from a watercourse?
D No . Continue to question 4.15
D Yes . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. You must complete IDAS form 15-Gravity diversion from a watercourse
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.15
4.15 Is the work for a watercourse diversion?
D No . Continue to question 4.16
D Yes . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. You must complete IDAS form 17-Watercourse diversion
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.16
4.16 Is the work for other work for taking or inte erlng with water?
D No . Continue to question 4.17
D Yes . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence against the Sustainable management of water resources state
code in the SOAP.
. You must complete IDAS form 21-0ther work in a watercourse
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.17
4.17 Does any of the proposed operational work Involve taking or inte ering with artesian water as defined
under the Water Act200O, schedule 4 (otherthan using a water truck to pump water)?
D No . Go to question 4.20
D Yes . Continue to question 4.18
4.18 Is any part of the proposed works on land to which a property development plan under the WIld Rivers
Act20fJSappIies?
D No . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. You must complete IDAS form 12-Taking or interfering with artesian or sub-artesian water
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.20
D Yes . Continue to question 4.19
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 27
I 4.19 Is the proposed works consistent with the property development plan under the WildRivers Act2tJtJ$1
D No . This aspect of development is prohibited development and a development application can not be
made for this aspect of development.
. If this is the only aspect of taking or interfering with water then that is the end of part 4 of this
checklist, otherwise continue to question 4.20.
D Yes . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. You must complete IDAS form 12-Taking or interfering with artesian or sub-artesian water
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.20
4.20 Does the proposed operational work involve taking or Interfering with overland flow water (otherthan
using a water truck to pump water)?
D No . Go to question 4.29
D Yes . Continue to question 4.21
I 4.21 Is the proposed taking or interfering:
Mentioned as assessable development in a wild river declaration under the Wild Rivers Act D Yes D No
2005
In an area declared under the Water Act 2000 to be a drainage and embankment area and the D Yes D No
operations are declared under that Act to be assessable development
In a wild river floodplain management area and the operations are: D Yes D No
.
specified works; or
. stated in the wild river declaration for the area to be assessable development
Mentioned as assessable development in a water resource plan, or prescribed as assessable DYes D No
development under a regulation under the Water Act 2000
If yes to any of the above, continue to question 4.22.
If no to all of the above and there are no other aspects of taking or interfering with water proposed, then that is the
end of part 4 of this checklist. If other aspects of taking or interfering with water are proposed, go to question 4.29
4.22 Is any of the proposed operational work to be carried out In a wild river area under the Wild Rivers Act
20051
D No . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
-
You must complete IDAS form 19-Taking overland flow
. If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
. If there are other aspects of taking or interfering with water proposed, then continue to question 4.29
D Yes . Continue to question 4.23
4.23 Is any part of the proposed works on land to which a property development plan under the Wild RIvers
Act2tJtJ5applies?
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 28
0 No . Go to question 4.25
0 Yes . Continue to question 4.24
I 4.24 Is the proposed works consistent with the property development plan under the WildRivers Act2()"$/
0 No . This aspect of development is prohibited development and a development application can not be
made for this aspect of development.
. If this is the only aspect of taking or interfering with water then that is the end of part 4 of this
checklist, otherwise go to question 4.25.
0 Yes . Go to question 4.25
4.25 For operational work that is the taking of overland flow water, Is any of the proposed works to be carried
out in a wild river high preservation area or a wild river special floodplain management area?
0 No . Go to question 4.27
0 Yes . Continue to question 4.26
0 N/A . Go to question 4.27
4.26 Is the proposed taking of overland flow water stated In a wild river declaration for the area to be
assessable development for which a development application can be made?
0 No . This aspect of the development is prohibited development
. If this is the only aspect of taking and interfering with water proposed, then that is the end of part 4 of
this checklist
. If other aspects of taking and interfering with water are proposed, continue to question 4.27
0 Yes . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. If there are no other aspects of taking or interfering proposed, then this is the end of part 4 of this
checklist
. If there are other aspects of taking or interfering with water proposed, continue to question 4.27
4.27 For operational work that is inte erlng with overland flow water, Is any of the proposed works to be
carried out in a wild river floodplain management area or a wild river special floodplain management
area?
0 No . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. If there are no other aspects of taking or interfering proposed, then this is the end of part 4 of this
checklist
. If there are other aspects of taking or interfering with water proposed, Go to question 4.29
0 Yes . Continue to question 4.28
0 N/A . Go to question 4.29
I 4.28 Do both of the following apply:
The operations are declared under the Water Act 2000 or the wild river DYes 0No
declaration for the area to be assessable development
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 29
The operational work is not for specified works in the area and is not DYes 0No
stated in the wild river declaration for the area to be assessable
development for which a development application may be made
If yes to all of the above, the development is prohibited development and a development application cannot be
made.
If no to all of the above, a development permit is required and this application will be assessed by OSOIP’s SARA
as assessment manager or concurrence agency against the Sustainable management of water resources state
code in the SOAP.
If there are no other aspects of taking or interfering with water proposed, then that is the end of part 4 of this
checklist.
If other aspects of taking or interfering with water are proposed, continue to question 4.29
4.29 Does the proposed operational work involve taking or inte erlng with subartesian water (other than
using a water truck to pump water)?
0 No . End of part 4 of this checklist.
0 Yes . Continue to question 4.30
4.30 Is the proposed taking or Inte erlng with subarteslan water mentioned or prescribed as assessable
development In any of the following?
A water resource plan under the Water Act 2000 0Yes 0No
A wild river declaration under the Wild Rivers Act 2005 0Yes 0No
A regulation under the Water Act 2000 0Yes 0No
If yes to any of the above, continue to question 4.31
If no to all of the above, end of part 4 of this checklist.
4.31 Is any part of the proposed works on land to which a property development plan under the Wild RIvers
Act200Sapplles?
0 No . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. You must complete IDAS form 12-Taking or interfering with artesian or sub-artesian water
. End of part 4 of this checklist
0 Yes . Continue to question 4.32
I 4.32 Is the proposed works consistent with the property development plan under the WildRIvers Act200$1
0 No . This aspect of development is prohibited development and a development application can not be
made for this aspect of development.
. End of part 4 of this checklist
0 Yes . A development permit is required and this application will be assessed by OSOIP’s SARA as
assessment manager or concurrence agency against the Sustainable management of water
resources state code in the SOAP.
. You must complete IDAS form 12-Taking or interfering with artesian or sub-artesian water
. End of part 4 of this checklist
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 30
I Part 5-For particular dams
I 5.1 Is the proposed operational work for the following?
The construction of a dam more than ten metres in height and having a storage capacity of 0Yes 0No
more than 1 500 megalitres
The construction of a dam more than ten metres in height and having a storage capacity of 0Yes 0No
more than 750 megalitres and a catchment area that is more than three times its maximum
surface area at full supply level
Work carried out in relation to an existing non-referable dam that will result in the dam being 0Yes 0No
more than ten metres in height and having a storage capacity of more than 1 500 megalitres
Work to an existing non-referable dam that will result in the dam being more than ten metres 0Yes 0No
in height and having a storage capacity of more than 750 megalitres and a catchment area
that is more than three times its maximum surface area at full supply level
Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if DYes DNa
the dam is:
. more than ten metres in height and having a storage capacity of more than 1 500
megalitres, or
. more than ten metres inheight and having a storage capacity of more than 750
megalitres and a catchment area that is more than three times its maximum surface area
at full supply level
Works carried out in relation to a referable dam if, because of the works, the storage capacity 0Yes 0No
of the dam will increase by more than 10% after the works are carried out.
Constructing a dam for which the chief executive under the Water Supply (Safety and 0Yes 0No
Reliability) Act 2008 has given a notice to have the dam failure impact assessed.
If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
therefore not assessable development. This is the end of part 5 of this checklist
If yes to any of the above, this application requires assessment by the chief executive of OSOIP as assessment
manager or concurrence agency against the Referrable dams state code in the SOAP.
-
You must complete IDAS form 16-Particulardams
-
End of part 5 of this checklist
I Part 6-For wild river
a area
6.1 Is the proposed operational work declared to be assessable development under the wild river
declaration for the area?
0 No . This aspect of development is not assessable development and no development permit is required
End of part 6 of this checklist
0 Yes . Continue to question 6.2
I 6.2 Does the proposed work Involve any of the following?
Any part of the operational work is located in a wild river high preservation area 0Yes 0No
The work is for agricultural activities in a wild river preservation area or a wild river special 0Yes 0No
floodplain management area in relation to the production of a high risk species as defined
under the Wild Rivers Act 2005
The work is for animal husbandry activities in a wild river special floodplain management area DYes o No
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 31
If yes to any of the above, this aspect of development is prohibited development and a development application
can not be made. This is the end of part 6 of this checklist
If no to all of the above, continue to question 6.3
6.3 Will the proposed operational work be carried out on land to which a property development plan
applies?
D No . This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Agricultural or animal husbandry activities in a wild river area state
code in the SDAP.
. You must complete IDAS form 29-Agricultural activities in a wild river area if the operational work is
for agricultural activities
. You must complete IDAS form 3D-Animal husbandry activities in a wild river area if the operational
work is for animal husbandry activities
. End of part 6 of this checklist
D Yes . Continue to question 6.4
I 6.4 Is the proposed development consistent with the property development plan?
D No . This aspect of development is prohibited development and a development application cannot be
made
. End of part 6 of this checklist
D Yes . This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Agricultural or animal husbandry activities in a wild river area state
code in the SDAP.
. You must complete IDAS form 29-Agricultural activities in a wild river area if the operational work is
for agricultural activities
. You must complete IDAS form 3D-Animal husbandry activities in a wild river area if the operational
work is for animal husbandry activities
. End of part 6 of this checklist
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 9
Sustainable Planning Regulation 2009, schedule 7, table 2, item 42
Sustainable Planning Act 2009, schedule 1, items 1 and 2
I Part Tidal work
7-
17.1 Is the proposed tidal work any of the following:
Excluded work D Yes D No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the D Yes D No
Sustainable Planning Regulation 2009
Work carried out in a priority development area D Yes D No
Work carried out on premises to which structure plan arrangements apply D Yes D No
. If no to all of the above, continue to question 7.2.
. If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required.
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 32
I 7.2 Is any of the proposed tidal work to be carried out In a wild river area under the WildRivers Ac/2(}()$/
D No Go to question 7.6
DYes Continue to question 7.3
1 7.3 Is the proposed tidal work for any of the specified works under the Wild Rivers Ac/2f)()$/
Infrastructure and works prescribed under a regulation to be necessary for disaster D Yes D No
management
De-snagging that is the minimum necessary to allow safe navigation of a marked navigable D Yes D No
channel
Infrastructure that is roads, railways, pipelines conveyor belts and cables D Yes D No
Jetties and boat ramps for use by the public D Yes D No
Works for rehabilitation of land (e.g. rehabilitation of abandoned mines) D Yes D No
Infrastructure for the transmission or distribution of electricity D Yes D No
Other infrastructure, prescribed under a regulation that relates to the transportation, D Yes D No
movement, transmission or flow of anything through a wild river area including, for example,
goods, materials, substances, matter, particles with or without charge, light, energy,
information and anything generated or produced
If no to all of the above, this aspect of development is prohibited development and a development application
cannot be made. End of part 7 of this checklist
If yes to any of the above, continue to question 7.4
7.4 Will the proposed operational work be carried out on land to which a property development plan
applies?
D No Go to question 7.6
DYes Continue to question 7.5
17.5 Is the proposed development consistent with the property development plan?
D No . This aspect of development is prohibited development and no application can be made
. End of part 7 of this checklist
D Yes . Continue to question 7.6
17.6 Is any of the proposed tidal work prescribed tidal work?
D No . This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence against the Tidal works, or development in a coastal management district state code in
the SDAP.
. You must complete IDAS form 23-Tidal works and development within coastal management districts
. End of part 7 of this checklist
D Yes . You must complete IDAS form 23-Tidal works and development within coastal management districts
. This application requires assessment by the local government as assessment manager and the chief
executive of DSDIP will be a concurrence agency for the application; you must refer a copy of the
application to DSDIP
. End of part 7 of this checklist
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 33
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18
Sustainable Planning Act 2009, schedule 1, items 2 and 4
I Part 8-Coastal management
I 8.1 Is the proposed operational work any of the following:
Excluded works D Yes D No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the D Yes D No
Sustainable Planning Regulation 2009
Work carried out in a priority development area D Yes D No
Work carried out on premises to which structure plan arrangements apply D Yes D No
If no to all of the above, continue to question 8.2.
If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 8 of this checklist.
I 8.2 Is the proposed operational work for any of the following?
Interfering with quarry material as defined under the Coastal Protection and Management Act D Yes D No
1995 on state coastal land above high-water mark
Disposing of dredge spoil or other solid waste material in tidal water D Yes D No
Constructing an artificial waterway D Yes D No
Removing or interfering with coastal dunes on land, other than State coastal land, that is in an D Yes D No
erosion prone area as defined in the Coastal Protection and Management Act 1995 and above
high-water mark
If you answered no to all of the above, a development permit is not required for this aspect of development and
that is the end of part 8 of this checklist
If you answered yes to any of the above, continue to question 8.3
I 8.3 Is any of the proposed work to be carried out In a wild river area under the Wild Rivers Act2tJ(J$1
D No . This application may require assessment by DSDIP’s SARA as assessment manager or concurrence
agency against the Tidal works, or development in a coastal management district state code in the
SDAP.
. You must complete IDAS form 23-Tidal works and development within coastal management districts
. End of part 8 of this checklist
D Yes . Continue to question 8.4
I 8.4 Is all of the proposed operational work for specified works under the WIldRIvers Act2D1J$1
D No . This aspect of the development is prohibited development and a development application cannot be
made
. End of part 8 of this checklist
D Yes . Continue to question 8.5
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 34
8.5 Will the proposed operational work be carried out on land to which a property development plan
applies?
D No . This application may require assessment by DSDIP’s SARA as assessment manager or concurrence
agency against the Tidal works, or development in a coastal management district state code in the
SDAP.
. You must complete IDAS form 23-Tidal works and development within coastal management districts
. End of part 8 of this checklist
D Yes . Continue to question 8.6
I 8.6 Is the proposed development consistent with the property development plan?
D No . This aspect of development is prohibited development and a development application cannot be
made
. End of part 8 of this checklist
D Yes . This application may require assessment by DSDIP’s SARA as assessment manager or concurrence
agency against the Tidal works, or development in a coastal management district state code in the
SDAP.
. You must com plete IDAS form 23-Tidal works and development within coastal management districts
. This aspect of development will be subject to the relevant wild river declaration for the area and
assessment may be required for the purpose of the Wild Rivers Act 2005
. End of part 8 of this checklist
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18
Sustainable Planning Act 2009, schedule 1, items 2 and 4
1 Part 9-Waterway barrier works
19.1 Is the proposed operational work any of the following:
Work that is self-assessable development under schedule 3, part 2 of the Sustainable D Yes D No
Planning Regulation 2009
Work carried out on premises to which structure plan arrangements apply D Yes D No
If no to all of the above, continue to question 9.2.
If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 9 of this checklist.
9.2 Is any of the proposed operational work to be carried out In a wild river area under the Wild Rivers Act
20051
D Yes . A development permit is required for this aspect of development. This application requires
assessment by the chief executive of DSDIP as assessment manager or concurrence agency against
the Constructing or raising waterway barrier works in fish habitats state code in the SDAP.
. You must complete IDAS form 27-Waterway barrier works
D Yes . Continue to question 9.3
9.3 Is any of the proposed operational work to be carried out In a wild river high preservation area or a wild
river special floodplain management area?
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 35
D No . Go to question 9.5
D Yes . Continue to question 9.4
I 9.4 Is the works for any of the following?
Specified works in the area D Yes D No
Maintenance of existing waterway barrier works D Yes D No
Constructing or raising temporary waterway barrier works associated with the carrying out of D Yes D No
specified works or the maintenance of existing waterway barrier works
Constructing new waterway barrier works, or raising of an existing waterway barrier works, D Yes D No
within the Lake Eyre Basin for storing water for town water supply demands
Authorised wild river operational work for the area D Yes D No
If no to all of the above, this aspect of development is prohibited development and a development application
cannot be made. That is the end of part 9 of this checklist
If yes to any of the above, continue to question 9.5
9.5 Will the proposed operational work be carried out on land to which a property development plan
applies?
D No . A development permit is required for this aspect of development. This application requires
assessment by the chief executive of OSOIP as assessment manager or concurrence agency against
the Constructing or raising waterway barrier works in fish habitats state code in the SOAP.
. You must complete IDAS form 27-Waterway barrier works
D Yes . Continue to question 9.6
I 9.6 Is the proposed development consistent with the property development plan?
D No . This aspect of development is prohibited development and a development application cannot be
made’
. End of part 9 of this checklist
D Yes . A development permit is required for this aspect of development. This application requires
assessment by the chief executive of OSOIP as assessment manager or concurrence agency against
the Constructing or raising waterway barrier works in fish habitats state code in the SOAP.
. You must complete IDAS form 27-Waterway barrier works
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 6
Sustainable Planning Regulation 2009, schedule 3, part 2
Sustainable Planning Regulation 2009, schedule 7, table 2, item 29
Sustainable Planning Act 2009, schedule 1, items 2 and 6
I Part 10-Declared fish habitat area
10.1 Is the operational work reasonably necessary for any of the following?
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 36
The maintenance of existing structures, including for example the following structures, if the DYes o No
structures were constructed in compliance with all the requirements under any Act relating to
a structure of that type:
. boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming
enclosures and weirs
.
powerlines or associated powerline infrastructure.
Educational or research purposes relating to the declared fish habitat area 0Yes 0No
Monitoring the impact of development on the declared fish habitat area 0Yes 0No
The construction or placement of structures, including for example, safety signs, swimming 0Yes 0No
enclosures and aids to navigation, if:
. the impact on the area is minor
. the structures are constructed in compliance with all the requirements, under any Act
relating to a structure of that type.
Public benefit works, including, for example, the construction of runnels for mosquito control, DYes o No
the removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is
minor
If yes to any of the above, a permit is not required for this aspect of development but the proposed work must
comply with any applicable self assessable codes
If no to all of the above, continue to question 10.2
110.2 Is the proposed operational work to be carried out In a wild river area under the Wild Rlyers Ac/200.5?
0 No . A development permit is required and this application requires assessment by the chief executive of
OSOIP as assessment manager or concurrence agency against the Development completely or
partially in a declared fish habitat area state code in the SOAP.
. You must complete IDAS form 27-Waterway barrier works
. End of part 10 of this checklist.
0 Yes . Continue to question 10.3
10.3 Is the proposed operational work to be carried out in a wild river high preservation area?
0 No . Go to question 10.5
0 Yes . Continue to question 10.4
If no, this aspect of development is prohibited development and that is the end of part 10 of this checklist
If yes, continue to question 10.5
10.5 Will the proposed operational work be carried out on land to which a property development plan
applies?
0 No . A development permit is required and this application requires assessment by the chief executive of
OSOIP as assessment manager or concurrence agency, against the Development completely or
partially in a declared fish habitat area state code in the SOAP.
. You must complete IDAS form 27-Waterway barrier works
. End of part 10 of this checklist.
0 Yes . Continue to question 10.6
110.6 Is the proposed development consistent with the property development plan?
Checklist 4-Operational work
Version 3.0-1 July 2013
Page 37
D No . This aspect of development is prohibited development and a development application cannot be
made
. End of part 10 of this checklist
D Yes . A development permit is required and this application requires assessment by the chief executive of
OSOIP as assessment manager or concurrence agency, against the Development completely or
partially in a declared fish habitat area state code in the SOAP.
. You must complete IDAS form 27-Waterway barrier works
. End of part 10 of this checklist
Section reference:
Sustainable Planning Act 2009, schedule 1, items 2 and 8
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 7
. Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
Sustainable Planning Regulation 2009, schedule 7, table 2, item 26
Part 11-Removal,destruction or damage of a marine plant
11.1 Is the proposed operational work any of the following?
For reconfiguring a lot that is assessable development under table 3, item 1, if there is a D Yes D No
development permit in effect for the reconfiguration
For a material change of use that is assessable development, if there is a development permit D Yes D No
in effect for the change of use
Self-assessable development under schedule 3, part 2 of the Sustainable Planning Regulation D Yes D No
2009
Carried out in a priority development area D Yes D No
Carried out on premises to which structure plan arrangements apply D Yes D No
If yes to any of the above, this aspect of development is not assessable development and no development permit
is required. End of part 11 of this checklist.
If no to all of the above, continue to question 11.2
11.2 Is the proposed operational work to be carried out in a wild river area under the Wild Rivers AcI2{){)$/
D No . A development permit is required and this application requires assessment by the chief executive of
OSOIP as assessment manager or concurrence agency against the Removal, destruction or damage
of marine plants state code in the SOAP.
. You must complete IDAS form 26-Marine plants and declared fish habitat areas
D Yes . Continue to question 11.3
111.3 Is the proposed operational work any of the following?
Specified works in the area D Yes D No
Operational work that is a necessary and unavoidable part of installing or maintaining works or D Yes D No
infrastructure required to support other development for which a development permit or
compliance permit is not required or, if a development application or a request for compliance
assessment is required, the permit is held or has been applied for.
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 38
. If no to all of the above, this aspect of development is prohibited development and a development application
cannot be made. End of part 11 of this checklist.
If yes to any of the above, continue to question 11.4
11.4 Will the proposed operational work be carried out on land to which a property development plan
applies?
D No . A development permit is required and this application requires assessment by the chief executive of
DSDIP as assessment manager or concurrence agency against the Removal, destruction or damage
of marine plants state code in the SDAP.
. You must complete IDAS form 26-Marine plants and declared fish habitat areas
. End of part 11 of this checklist.
D Yes . Continue to question 11.5
111.5 Is the proposed development consistent with the property development plan?
D No . This aspect of development is prohibited development and a development application cannot be
made
. End of part 11 of this checklist
D Yes . A development permit is required and this application requires assessment by the chief executive of
DSDIP as assessment manager or concurrence agency against the Removal, destruction or damage
of marine plants state code in the SDAP.
. You must complete IDAS form 26-Marine plants and declared fish habitat areas
. End of part 11 of this checklist.
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8
. Sustainable Planning Regulation 2009, schedule 3, part 2
. Sustainable Planning Regulation 2009, schedule 7, table 2, item 30
. Sustainable Planning Act 2009, schedule 1, items 2 and 7
Part 12-Great Barrier Reef Wetland Protection Areas
12.1 Is the proposed operational work for a domestic housing activity only?
D No . Continue to question 12.2
D Yes . A development permit is not required for this aspect of development and this is the end of the
checklist
12.2 Is the proposed operational work the natural and ordinary consequence of a material change of use or
reconflgurlng a lot for which the state was a concurrence agency under schedule 7, table 3, Item 21 A or
table 2, Item 43A of the Sustainable Planning Regulation 2009?
D No . Continue to question 12.3
D Yes . A development permit is not required for this aspect of development and this is the end of the
checklist
12.3 Is the proposed operational work associated with government supported transport infrastructure or
electricity infrastructure?
Checklist 4-0perational work
Version 3.0-1 July 2013
Page 39
D No . A development permit is required and this application requires assessment by the chief executive of
DSDIP as assessment manager or concurrence agency against the Wetland protection area state
code in the SOAP.
. You must complete IOAS form 33-Great Barrier Reef Wetland protection area
. End of this checklist
D Yes . A permit is not required for this aspect of development but the proposed work must comply with any
applicable self assessable code
. End of this checklist
Section reference:
. Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 10
Sustainable Planning Regulation 2009, schedule 7, table 2, item 438
Privacy-please refer to your assessment manager for further details on the use of information recorded in
this form
Disclaimer:
While the Department of State Development, Infrastructure and Planning (DSDIP)believes that the information
contained on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis
that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation
and application of the applicable legislation to your circumstances.
To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this checklist.
OFFICE USE ONLY
Date received I I Reference numbers
The Sustainable Planning Act 2009 is administered by DSDIP. This checklist and all other required application
materials should be sent to your assessment manager and any referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
tel 13 OGOV (1374 68)
[email protected] Checklist 4-Operational work
Version 3.0-1 July 2013
www.dsdip.qld.gov.au
Used in these records
About this file
- File size
- 28.6 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.