Taking water from a watercourse, lake or spring for camping purposes or for watering D Yes D No
travelling stock
Using a water truck to pump water D Yes D No
If no to all of the above, continue to question 4.4
If yes to any of the above, this aspect of development does not require a development permit.
- If this is the only aspect of taking or interfering with water proposed then that is the end of part 4 of this checklist
- If there are other aspects of taking or interfering with water proposed, continue to question 4.4
4.4 Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
Sustainable Planning Regulation 2009?
D No . Go to question 4.5
D Yes . This aspect of development is self-assessable development and must comply with any relevant self
assessable code
. If the proposal involves more than one aspect of operational work for taking or interfering with water,
and the other aspect is not self-assessable development, then continue to question 4.5
4.5 Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act
20051
D No . Go to question 4.12
D Yes . Continue to question 4.6
4.6 Do both of the following apply:
The proposed operational work is to be carried out in a wild river high preservation area or a wild
river special floodplain management area
the work Interferes with the flow of water in a watercourse, lake or spring in the area
D No . Go to question 4.8
D Yes . Continue to question 4.7
14.7 Do any of the following apply?
The works are for the maintenance of works as defined under the Water Act 2000 D Yes D No
The works increase the interference with water in Lake Eyre Basin to the extent necessary for D Yes D No
taking water for town water supply demands
The work is authorised wild river operational work for the area D Yes D No
If no to all of the above, then this aspect of the development is prohibited development
- If this is the only aspect of taking and interfering with water proposed, then that is the end of part 4 of this
checklist
- If other aspects of taking and interfering with water are proposed, continue to question 4.8
If yes to any of the above, continue to question 4.8
4.8 Does the proposed operational work involve Interfering with the flow of water in a nominated waterway,
as defined under the WildRIvers Ac/200.5; in a wild river preservation area?
ID No
I. Go to question 4.10
Checklist 4-0perational work
Version 3.0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 1Related documentApplication case desk ↗
About this file
- File size
- 28.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.