Development Application part 1 · OPW13/0675

of 39

Text shows just the words. Original shows the document exactly as it was published.

Very large file (28.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

I Part 5-For particular dams
I 5.1 Is the proposed operational work for the following?
 The construction of a dam more than ten metres in height and having a storage capacity of              0Yes        0No
 more than 1      500 megalitres

 The construction of a dam more than ten metres in height and having a storage capacity of              0Yes        0No
 more than 750  megalitres and a catchment area that is more than three times its maximum
 surface area at full supply level

 Work carried out in relation to an existing non-referable dam that will result in the dam being        0Yes        0No
 more than ten metres in       height and having a storage capacity of more than 1 500 megalitres
 Work to an existing non-referable dam that will result in the dam being more than ten metres           0Yes        0No
 in height and having a storage capacity of more than 750 megalitres and a catchment area
 that is more than three times its maximum surface area at full supply level

 Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if         DYes        DNa
 the dam is:
 .      more than ten metres in     height and having a storage capacity of more than 1 500
        megalitres, or
 .      more than ten metres inheight and having a storage capacity of more than 750
        megalitres and a catchment area that is more than three times its maximum surface area
        at full supply level

 Works carried out in relation to a referable dam if, because of the works, the storage capacity        0Yes        0No
 of the dam will increase by more than 10% after the works are carried out.

 Constructing a dam for which the chief executive under the Water Supply (Safety and                    0Yes        0No
 Reliability) Act 2008 has given a notice to have the dam failure impact assessed.

        If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
        therefore not assessable development. This is the end of part 5 of this checklist

        If yes to any of the above, this application requires assessment by the chief executive of OSOIP as assessment
        manager or concurrence agency against the Referrable dams state code in the SOAP.
        -
             You must complete IDAS form 16-Particulardams
        -
             End of part 5 of this checklist


I Part 6-For wild river
                  a             area



 6.1        Is the proposed operational work declared to be assessable development under the wild river
            declaration for the area?


 0 No              .     This aspect of development is not assessable development and no development permit is required
                         End of part 6 of this checklist

 0 Yes             .     Continue to question 6.2


I 6.2       Does the proposed work Involve any of the following?


 Any part of the operational work is located in a wild river high preservation area                     0Yes        0No
 The work is for agricultural activities in a wild river preservation area or a wild river special      0Yes        0No
 floodplain management area in relation to the production of a high risk species as defined
 under the Wild Rivers Act 2005

 The work is for animal husbandry activities in a wild river special floodplain management area         DYes        o No



                                                                                                     Checklist 4-0perational work
                                                                                                         Version 3.0-1 July 2013

Used in these records

About this file

File size
28.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1.pdf · 28.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.