Council archive · source document
Development Application part 1 · OPW13/0675
Very large file (28.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
I Part 5-For particular dams
I 5.1 Is the proposed operational work for the following?
The construction of a dam more than ten metres in height and having a storage capacity of 0Yes 0No
more than 1 500 megalitres
The construction of a dam more than ten metres in height and having a storage capacity of 0Yes 0No
more than 750 megalitres and a catchment area that is more than three times its maximum
surface area at full supply level
Work carried out in relation to an existing non-referable dam that will result in the dam being 0Yes 0No
more than ten metres in height and having a storage capacity of more than 1 500 megalitres
Work to an existing non-referable dam that will result in the dam being more than ten metres 0Yes 0No
in height and having a storage capacity of more than 750 megalitres and a catchment area
that is more than three times its maximum surface area at full supply level
Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if DYes DNa
the dam is:
. more than ten metres in height and having a storage capacity of more than 1 500
megalitres, or
. more than ten metres inheight and having a storage capacity of more than 750
megalitres and a catchment area that is more than three times its maximum surface area
at full supply level
Works carried out in relation to a referable dam if, because of the works, the storage capacity 0Yes 0No
of the dam will increase by more than 10% after the works are carried out.
Constructing a dam for which the chief executive under the Water Supply (Safety and 0Yes 0No
Reliability) Act 2008 has given a notice to have the dam failure impact assessed.
If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
therefore not assessable development. This is the end of part 5 of this checklist
If yes to any of the above, this application requires assessment by the chief executive of OSOIP as assessment
manager or concurrence agency against the Referrable dams state code in the SOAP.
-
You must complete IDAS form 16-Particulardams
-
End of part 5 of this checklist
I Part 6-For wild river
a area
6.1 Is the proposed operational work declared to be assessable development under the wild river
declaration for the area?
0 No . This aspect of development is not assessable development and no development permit is required
End of part 6 of this checklist
0 Yes . Continue to question 6.2
I 6.2 Does the proposed work Involve any of the following?
Any part of the operational work is located in a wild river high preservation area 0Yes 0No
The work is for agricultural activities in a wild river preservation area or a wild river special 0Yes 0No
floodplain management area in relation to the production of a high risk species as defined
under the Wild Rivers Act 2005
The work is for animal husbandry activities in a wild river special floodplain management area DYes o No
Checklist 4-0perational work
Version 3.0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 1Related documentApplication case desk ↗
About this file
- File size
- 28.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.