Extension to Currency Period - Approved 132005.1062.06

of 1

Text shows just the words. Original shows the document exactly as it was published.

Officer: 	Wilhelm Koschade
Direct Telephone: 	07 53296215
Our Reference:	132005.1062.06 : JELDER
Your Reference:	n/a
23 March 2018
Mr KM Bone, Mrs PJ Bone
PO Box 276
WARWICK  QLD  4370

[email protected]
Dear Sir/Madam,
Extension to Currency Period
Planning Act 2016
I refer to your request received on 26 February 2018, to extend the currency period for an existing development approval. On 19 March 2018, Council decided to approve your request.
Details of the decision are as follows:
APPLICATION details
Application No:	132005.1062.06
Street address:	5 Park Cres Sunshine Beach Qld 4567
Real property description:	Lot 452 RP 48112
Planning Scheme:	The Noosa Plan (3 July 2017)
decision details
Council on 13 October 2006 decided to issue the following type of approval:
Application No.	Type of Development
132005.1062	Development Permit for Material Change of Use – Duplex Dwelling Development Permit for Operational Works – Landscaping, Car parking, Access, Stormwater Drainage and Sediment and Erosion Control
In relation to a request to extend the relevant period of an existing approval, Council on 29 April 2010 decided to:
A.	Approve a change to Condition 13 extending the relevant period to 13 October 2012.
In relation to a request to extend the relevant period of an existing approval, Council on 20 September 2012 decided to:
A.	Approve a change to Condition 13 extending the relevant period to 13 October 2014.
In relation to the request to extend the relevant period of an existing approval, Council on 17 October 2010 decided to:
A.	Approve a change to Item 3 and Condition 13 extending the relevant period for 2 years to 23 March 2016.
In relation to the request to extend the relevant period of an existing approval, Council on 29 February 2016 decided to:
A.	Approve a change to Item 3 and Condition 13 extending the relevant period for 2 years to 23 March 2018.
In relation to the request to extend the currency period for this approval, Council on 19 March 2018, decided to:
A.	Approve a change to item 3 and Condition 13 extending the currency period for 2 years to 23 March 2020.
currency period of approval
The currency period for this development approval is 23 March 2020.
assessment manager conditions
Land Use
Deleted.
Deleted.
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans were prepared by Scott Mayes Design Services and are titled, numbered and dated as listed in the following table, and as may be amended by these conditions.
Titled	Numbered	Dated
Site Plan	DA.01C	21.02.2006
Basement Plan	DA.02A	24.04.2005
Ground Floor Plan	DA.03C	26.04.2006
First Floor Plan	DA.04A	24.04.2005
Second Floor Plan	DA.05 A	04.04.2006
Roof Plan	DA.06B	04.04.2006
South Elevation	DA.07	12.4.2005
East Elevation	DA.08B	18.08.2005
North Elevation	DA.09B	04.04.2006
West Elevation	DA.10D	26.04.2006
Building Long Section & Driveway Long Section	DA.11B	21.02.2006
Section B – B	DA.12A	26.04.2006
Side fences and walls or combination of both shall not exceed a maximum height of 2 metres above natural ground level.
Any balustrades, upstands, fencing, screening, portioning or the like is to be constructed of open or transparent materials and shall be setback a distance of at least 1 metre form the edge of the roof top.
The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions.
The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions.
Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining as open structures.
The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this requirement.
Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit.
The requirements of this development approval are to be effected, prior to the use of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with conditions.
The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for Building Works.
The Development Permit for a material change of use of premises and operational works lapses if the use has not happened by 23 March 2020, unless an application to extend the currency is approved by Council.
Building Services
A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of the work confirming compliance with the maximum building height being 12 metres and 3 storeys above natural and finished surface levels, and required by the provisions of the Planning Scheme.
Land Development
Vehicle Access
A vehicular access driveway to serve the development shall be constructed from the Park Crescent frontage of the site with a maximum width of 3.0m and generally in accordance with drawing No. DA.11d dated 21.02.2006 prepared by Scott Mayes Design Services.
The driveway shall be designed and constructed to Council’s design standards and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any level difference.  Should any driveways be constructed to grades that do not comply with AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
All vehicles shall enter and leave the site in a forward direction.
Carparking
Off Street
Carparking shall be provided within the site generally as shown on drawing number DA.02A dated 24.5.2005 by Scott Mayes Design Services, except as modified herein.
The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m.
All carparking shall be kept, maintained and line-marked in a condition fit for use.
Park Contributions
A Park contribution of $2,824 towards the acquisition of additional parkland or the improvement of existing parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit for Building Works in accordance with Council’s Planning Scheme Policy PSP24 Park Requirements for Development Applications.  This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment.
Frontage Works
Footpath improvements such as topsoiling, grassing, and tree planting are required to the Park Crescent frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines.  Grass shall be couch, free of weeds.
The existing concrete footpath across the frontage of No 5 Park Crescent shall be removed and replaced with a new 1.5m wide concrete footpath. The new footpath shall be constructed along the Park Crescent frontage of the site in accordance with Council’s design standards and to an alignment that protects any significant vegetation or any underground services.
All paths shall be designed and constructed to ensure pedestrian safety using non-slip materials and to produce an evenly graded surface finish.
All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
A pathway contribution of $635 towards external major pathways, in accordance with Planning Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council prior to obtaining a Development Permit for Building Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment.
Stormwater Drainage
All stormwater drainage shall be collected on site and discharged so there is no net increase in stormwater runoff from the site.  Stormwater drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage system in Park Crescent generally in accordance with drawing No 381-OP1D dated 20/2/06 prepared by Spice Consulting except as modified herein.
The outlet point in the kerb and channel for the drainage from the proposed basement and driveway of No 5 Park Crescent shall be constructed as shown on drawing No 381-OP1F dated 22/8/06 prepared by Spice Consulting. A stub connection shall be provided in the outlet pit for the proposed development at 7 Park Crescent.
Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum storage 3000 litres per dwelling unit) generally in accordance with drawing No 381-OP1D dated 20/2/06 prepared by Spice Consulting.  The rainwater storage system shall be installed to ensure water from the tank can be used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling.   All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and to the satisfaction of Council’s Manager Plumbing Services.  The location and capacity of the tank shall be clearly shown on the plans submitted for Building Works approval and any overflow shall be directed to the road frontage.
All site stormwater drainage shall be by means of a gravity system.
All stormwater drainage lines to become Council infrastructure and any inter-allotment drainage shall be inspected by closed circuit television (CCTV) prior to commencement of the approved use.
CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction works.  The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following defect identification and rectification.  This charge is payable prior to the commencement of the approved use and will be determined on the unit rate basis current at the time of approval.
Service Easements (Stormwater)
Deleted.
Sewer Mains
The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
The site shall be connected to Council’s existing town water supply and be constructed in accordance with Council’s standards and requirements at no cost to Council.
Each water connection to the water reticulation system shall extend to the property boundary and be metered.  Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed.  All fees for the supply of water meters shall be paid to the Council.
Headworks Contributions
Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment.  An estimate only of the contribution rates under the current policies is outlined below.  These amounts will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment.
Water Supply	$4,001
Sewerage	$3,136
TOTAL	$7,137
All headworks contributions must be paid prior to the issue of a Development Permit for Building Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%.  Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or structures that border the development site.  Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification.  In this regard any fences to be replaced shall be clearly shown on the plans submitted for Building Works approval.
Erosion and Sediment Control
Any person acting on this permit shall prevent erosion and sediment export from leaving the site.  Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary.
The methods of controlling erosion and sediment are to be generally in accordance with drawing No 381-OP1D dated 20/2/06 prepared by Spice Consulting.
General
A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works that will become Council infrastructure.  In this regard a DXF/DWG file on GDA94 zone 56 grid of the existing cadastre layout is to be submitted in conjunction with any engineering plans.
Digital detailed design drawings and calculations shall be submitted in respect of roadworks and stormwater drainage works.  To avoid conflict with underground pipes or services, all existing and proposed services required by the development shall be shown on the plans.
To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au).
As Constructed drawings and data for all engineering works to become Council infrastructure shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures.  All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels.  The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.  (Guidelines on the use of ADAC are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council.
Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council.
Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council.
The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road.  All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle.
Environmental Health
The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties.
A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall be submitted for the demolition and construction phases of the development and approved by Council’s Environmental Health Section prior to the issue of the development permit for Building works.  The Plan shall contain the following information:
MATERIALS ON-SITE	DESTINATION
	Re-use and Recycling	Disposal
Expected waste materials	Estimated volume (m³)	On-site            *specify proposed re-use or on-site recycling methods	Off-site              *specify contractor and recycling outlet	*specify contractor and landfill site
Excavation material				
Green waste				
Bricks				
Concrete				
Timber-please specify				
Plasterboard				
Metals - please specify				
Asbestos				
Other - please specify				
Note: Details of site area to be used for onsite separation, treatment and storage (including weather protection) shall be provided on the plan drawings accompanying your application.
Noise emission from swimming pool and spa equipment (including heating equipment) shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in accordance with Council’s Local Law No. 12 - Control of Nuisances.  Infringement Notices (on-the-spot fines) may apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made –
From 10pm to 7am: Which is audible outside the most exposed part of an affected building
From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
Noise emission from air conditioning equipment shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in accordance with Council’s Local Law No. 12 - Control of Nuisances.  Infringement Notices (on-the-spot fines) may apply for offences.
Submission of written certification from a suitably qualified person confirming that the noise levels comply when measured at either the residential boundary or outside the most exposed part of an affected building, whichever is the closest to the equipment.  This is required immediately after installation of the equipment and prior to any occupation of the building, and in a format approved by Council.
A person must not use equipment on any day if it makes or causes noise to be made –
From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
Noise from building works associated with residential development shall comply with the following –
Limited to between 7:00am to 6:30pm Monday to Saturday.
All reasonable measures are taken to minimise noise emissions.
Not permitted on Sunday or public holidays.
All lift plant including motors, should be situated within the building or suitably provided with noise reduction measures and located as to prevent a noise nuisance in accordance with the nuisance provisions of the Environmental Protection Regulation 1998.  On the spot fines apply for such offences.
Operational Works
Land Use
The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the approved plans of development. The approved plans are Vegetation Survey Plan Issue B Page 1/5, Landscape Plan Drawing Nos. LP 01 Issue B Page 2/5, LP02 Issue B Page 3/5 and LP03 Issue B Page 4/5 prepared by Green Key Designs dated 4 November 2005 and may be amended by these conditions and annotations detailed on the approved plan.
All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and be visible at all times to ensure prompt access in case of emergency
The landscape construction is to be implemented in accordance with the amended landscape plan, planting schedule and horticultural industry best practices.
All trees must be planted a minimum of 1 metre from all services.
In order to achieve a higher element of vegetation screening between the eastern and northwestern adjoining properties, provide substitute planting for the SYZYGIUM Beach Ball with SYZYGIUM paniculatum. Refer to the approved landscape plan and planting schedule for amendments and details.
In order to compensate for the loss of vegetation amenity (CALOPHYLLUM inophyllum) to the street frontage, provide 1 x 200 litre CUPANIOPSIS anarcardioides to replace the 45 litre ACRONYCHIA imperforata. Refer to the approved landscape plan for amendments and details
The 45 litre ACRONYCHIA imperforata street tree proposed in the road reserve must be staked and provided with a mulch collar and maintained in accordance with horticultural industry best practices.
Land Development
The development shall be carried out in accordance with Engineering Drawing No. 381-0P1F dated 22/08/06 prepared by Spice Consulting and Consultant Drawings Nos. DA.11b dated 21.02.2006 and drawing No. DA.01C dated 21.02.2006 prepared by Scott Mayes Design Services, except as modified by the conditions of the Material Change of Use and as modified herein.
Roof and surface water runoff connection to Council’s kerb and channel shall be generally as shown on Drawing No. 381-OP1D dated 20/2/06 prepared by Spice Consulting except as modified by the conditions of the Material Change of Use. Kerb adaptors shall be used in the kerb.
Prior to the commencement of works, the applicant shall comply with the requirements of the Building Construction Industry (Portable Long Service Leave) Act 1991. In this regard, a Statutory Declaration outlining the cost of building and construction works, as defined in s73.(1) of the Act, shall be submitted to Council in conjunction with any application for Building Works or prior to the commencement of any works associated with this approval, whichever occurs first. If payment of the levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment manager.
A concrete footpath 1.5 metres wide shall be constructed across the full frontage of the development. The footpath shall have a slip resistant surface, the alignment of which, shall be determined on site with Council’s Construction Technical Officer. All expansion joints shall be “sawcut” not trowel jointed.
The compliance bond is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be held once Council's Construction Technical Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit.
The names of any proposed contractors for works are to be submitted in writing, together with copies of current Public Liability and Workers Compensation Insurances, for consideration for approval by the Manager-Land Development seven (7) days prior to pre-start meetings and commencement of works.
A separate letter will then be issued approving the Contractor (or otherwise) for the works. No other Contractor or Subcontractor shall be engaged to carry out the works or any part of the works without the written approval of the Manager-Land Development.
Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.
The Consulting Engineers for the project shall be currently Registered Professional Engineers of Queensland (RPEQ).  The consulting engineers are responsible for arranging all inspections, with Council’s Construction Technical Officer or nominated staff.
Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This person will be the contact for the project).
Council standards shall apply to these works unless otherwise modified herein.
The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property, road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to the commencement of the use or, alternatively, the Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the Council prior to the commencement of the use, provided that in the case of emergency the Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the commencement of the use.
A management strategy to ensure no damage occurs to Council services shall be given to Council for assessment prior to the pre start meeting.
The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to residents and/or tenants in the vicinity of the development.
Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended hours are approved by the Manager-Land Development or his nominee.
All signage, including that for safety during construction shall be in accordance with the Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
Safe pedestrian access on Park Crescent shall be maintained at all times. Should footpath / road closures be necessary to carry out construction works, Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
Sediment and erosion control measures must be in place prior to works commencing. If such measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system or natural waterways. Although the sediment and erosion control measures have been approved on drawing No 381-OP1D dated 20/2/06 prepared by Spic Consulting, Council’s Manager – Land Development may request further controls to be installed should approved measures be inefficient.
A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed on construction works during the maintenance period, which is a minimum period of 12 months duration. Such bond must be lodged by, and shall only be accepted from the Developer for the works.
The works to become Council assets will not be accepted "On Maintenance" until the landscaping is completed.
Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations from Council's standards exist, then Council standards shall apply
referral agencies
Not Applicable
APPROVED PLANS/DOCUMENTS
Approved Plans
Plan No.	Rev.	Plan Name	Date
DA.01C		Site Plan	21.02.2006
DA.02A		Basement Plan	24.04.2005
DA.03C		Ground Floor Plan	26.04.2006
DA.04A		First Floor Plan	24.04.2005
DA.05 A		Second Floor Plan	04.04.2006
DA.06B		Roof Plan	04.04.2006
DA.07		South Elevation	12.4.2005
DA.08B		East Elevation	18.08.2005
DA.09B		North Elevation	04.04.2006
DA.10D		West Elevation	26.04.2006
DA.11B		Building Long Section & Driveway Long Section	21.02.2006
DA.12A		Section B – B	26.04.2006

advisory notes
The following Advisory Notes are for information purposes only and do not form conditions of approval:
Land Development
The applicant is informed that approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount of $984 and is subject to variations in the Consumer Price Index, All Groups Brisbane from December 2005 until the date of payment.  An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
The applicant is informed that payment via credit card transaction will not be an acceptable method of payment for development contributions conditioned in this permit or for infrastructure charge notices issued separately.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Land Use
The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that makes or causes audible noise to be made from the building work:-
On a Sunday or public holiday, at any time; or
On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the lodgement of any application for operational works over the site.
Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa Council’s Plumbing Services Section in accordance with the Plumbing and Drainage Act 2002 (as applicable).
The applicant is advised that a Compliance Permit for all plumbing and drainage works within the boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to obtaining a Development Permit for Building Works
We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled facilities, and that access to this building and the provision of sanitary facilities may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that:  “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.”   It is an offence to fail to comply with the duty of care.  Substantial monetary penalties may apply to individuals or corporations breaching this duty of care.  Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
property notes
Not Applicable
variation approval details
Not Applicable
further development permits required
Development Permit for Building Works – All Building Works
submissions
There were 2 properly made submissions about the original development application.  Please refer to the Negotiated Decision Notice dated 13 October 2006 for the name and address of the principal submitter for each properly made submission.
rights of appeal
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Wilhelm Koschade
Development Planner

Enc:	Appeal Rights

cc.	Unitywater

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
228 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(Refer to Schedule 1 of the Planning Act 2016)
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
229 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
230 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
231 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court.

[word/footer1.xml]
Decision Notice – Minor Change 					Page 14 of 14

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
					Decision Notice – Minor Change 					Page 1 of 14

[word/footer3.xml]
Page 3 of 3

[word/header2.xml]
3

[Attachment: image3.png (image text)]
ee) NOOSA COUNCIL

Used in these records

About this file

File size
343 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period - Approved 132005.1062.06.docx · 343 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.