Original source · versioned page text
2017-09-12 Planning & Environment Committee Agenda
The original of this document is very large (25.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 SEPTEMBER 2017
8 LOCAL GOVERNMENT INFRASTRUCTURE PLAN (SOW COSTS & NETWORK
DEMANDS)
DOCUMENT INFORM AT ION
Author Infrastructure Assessment Coordinator, Oddbjorn Ludvigsen
Environment & Sustainable Development Department
Index ECM/ Subject/ Local Government Infrastructure Plan (LGIP)
Attachments 1. Generic Land Valuations - CBRE Valuations Pty Ltd - February 2012
2. LGIP Public Parks & LFC - SOW (Amendment)
3. LGIP Briefing Note - Infrastructure Network Demand Assumptions &
Conversions
(Note: All attachments provided separately to this report)
EXECUTIVE SUMMARY
This report presents the staff review of the remaining requirements for completing the Schedule
of Works (SOW) model for updating the current Priority Infrastructure Plan (PIP) to a Local
Government Infrastructure Plan (LGIP). It follows on from earlier reports on the Plans for Trunk
Infrastructure (PFTI) approved by Council on 18 May and 20 July 2017.
Council needs to have amended its current Priority Infrastructure Plan (PIP) to a Local
Government Infrastructure Plan (LGIP) by 30 June 2018 in order to continue issuing
infrastructure charges and impose conditions about trunk infrastructure on development.
RECOMMENDATION
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding the remaining
requirements for the Schedule of Works (SOW) Model for the new Local Government
Infrastructure Plan (LGIP) under The Noosa Plan 2006 and approve:
A. The methodology used to determine existing trunk infrastructure network items from
Council’s Geographic Information System (GIS) and current replacement costs obtained
from Council’s Financial Asset Register;
B. The Generic Land Valuation prepared by CBRE Valuations Pty Limited dated February
2012 provided in Attachment 1 to the report and indexed to the LGIP June 2014 base date
as the basis for applying a uniform generic land cost in the Schedule of Works Model
(SOW) for all existing and future land;
C. A minor amendment to the Schedule of Works (SOW) future items for the Public Parks &
Land for Community Facilities Network provided in Attachment 2 to the report noting that
the cost estimates will be refined following completion of the excel SOW Model;
D. The LGIP Briefing Note provided in Attachment 3 to the report providing the basis for the
Infrastructure Network Demand Assumptions and Conversions; and
E. Note that following completion of the SOW model, draft LGIP and Independent Reviewer’s
first review, a further report on the complete draft LGIP will be presented for Council’s
consideration and adoption to proceed to the Minister’s first State review.
Page 132 of 168
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.