Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2017-09-12 Planning & Environment Committee Agenda

of 144

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                         12 SEPTEMBER 2017


          Performance Bond
    6.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
          must be submitted to Council, to secure performance of all conditions of this
          approval, prior to the issue of a Development Permit for Operational Works. The cash
          bond or trading bank guarantee will be returned on performance of the conditions of
          approval less any costs incurred by Council in respect of enforcing performance of
          this permit. Council reserves the right to call upon the bond or guaranteed sum to
          effect compliance with conditions.
          Street Identification
    7.    The street address of the development must be clearly visible and discernible from
          the primary frontage of the site by the provision of a street number and, where
          appropriate, the building name.
          Water & Sewer Connections
    8.    An underground connection to reticulated water and sewerage must be provided to
          the development site in accordance with the standards and requirements of Northern
          SEQ Distributor–Retailer Authority (Unitywater).
    9.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to the development site.
          Landscaping
    10.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and The Noosa Plan’s Planning
          Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and must
          include:
          10.1. The landscaped areas as generally shown on the approved Site Plan.
          10.2. Trees planted to achieve tall, dense screening vegetation within the western
                landscaped area to assist with screening the new building.
          10.3. A minimum of 3 trees within the front setback area and along western
                boundary to soften the visual building bulk.
    11.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
          Nature and Extent of Approved Signs
    12.   The approved signs must not be used for the advertisement of goods and/or services
          not sold or conducted on the site (ie. third party advertising).
    13.   The approved signs must not exceed the dimensions and sign areas as shown on the
          Approved Plans.
    14.   The approved signs must be positioned wholly within the property boundaries of the
          subject site, and must not be located within or across any easements.
          Illumination
    15.   The approved signs must not be illuminated in any way.
          Movement
    16.   The approved signs must not revolve, move, contain moving parts, change its
          message, flash, have a moving or flashing border, or give the impression of
          movement in any way.

                                                                                Page 5 of 168
Log in to download the original file

2017-09-12 Planning & Environment Committee Agenda(PDF, 25MB).pdf · 25.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.