Original source · versioned page text
2017-09-12 Planning & Environment Committee Agenda
The original of this document is very large (25.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 SEPTEMBER 2017 Applicant’s requested change The applicant requests that this condition be amended to allow for full building elevations, including detailed roof plans and ground level contours to be provided prior to civil operational works on a staged basis. Whilst our client is intending to obtain upfront operational works approvals for vegetation clearing and bulk earthworks (nb. OPW17/0123 lodged on 05/04/2017), detailed architectural drawings are anticipated as being generally completed on a staged basis with civil works design. It is noted that detailed architectural drawings are provided for the following buildings: Building 15 and 16 in relation to Stage 1A; Building 7, 8 and 9 in relation to Stage 2A; Building 3 in relation to Stage 3A; and Resort Facilities Building in relation to Stage 4A. It is requested that this condition only require the further submission of architectural drawings of the remaining stages prior to relevant staged civil operational works applications such that the condition would read: 1. Prior to the issue of an operational works approval for civil works for each stage of the development, fully detailed architectural proposal plans relevant to the each stage must be submitted for Council approval. Detailed plans must provide the following details as a minimum: 1.1. Full architectural building elevations; 1.2. Detailed roof plans and ground level contours demonstrating compliance with the development’s 8m/12m building height limits above natural and finished ground levels; 1.3. Landscaping areas demonstrating compliance with Condition 5 herein 1.4. The location of proposed stormwater management/treatment devices; 1.5. Consistency with all management plans for the development; 1.6. Building colour schemes demonstrating compliance with Condition 8 herein; & 1.7. Vehicle manoeuvring areas and temporary turning provisions. Assessment It is considered reasonable to allow for the submission of the requirements detailed within Condition 1 including full building elevations and detailed roof plans on a staged basis prior to the issue of the operational works approval for civil works associated with each stage. The amended condition still requires that the plans be submitted for approval however the timing of the plan submission is amended to accord with the staging of the development. It is recommended that this condition be modified to address the increased density identified earlier in this report. Condition 2 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed below and are as amended by the conditions herein. Plan No. Rev. Plan/Document Name Date 7038-DA01 08 Project summary 22-07-16 7038-DA03 07 Carparking/Basement prepared by Blackburne 22-07-16 Jackson Design 7038-DA04 08 Ground Floor prepared by Blackburne Jackson 08-08-16 Page 65 of 168
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.