PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 SEPTEMBER 2017
23. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
24. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and be generally in accordance with The Site Based Stormwater
Management Plan Report – Report No. 5588-1.0 dated 8 June 2017 prepared by
Storm Water Consulting and must include in particular the use of gravity stormwater
drainage.
Electricity and Telecommunication Services
26. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
27. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
28. An easement for access purposes must be registered in favour of Lot 59 RP228906
against the title of Lot 280 SP104321. The easement must be of sufficient width to
provide for free access for all customer, service and emergency service vehicles. The
easement must be registered prior to the commencement of the use.
29. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
30. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
32. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
33. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Damage to Services and Assets
34. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
Page 7 of 168
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.