7088_AO17-04_01 01 Parkside Terrace 15 prepared by Blackburne 19-05-17
Jackson Design
7088_AO17-05_01 01 Parkside Terrace 15 prepared by Blackburne 19-05-17
Jackson Design
7088_AO17-06_02 02 Parkside Residences 3 prepared by 06-06-17
Blackburne Jackson Design
Assessment
The proposed amendment to condition 2 will reflect the new set of plans and is therefore
supported.
Condition 8
8. The development’s external colour scheme shall use muted environmental tones of
browns, greens and greys to integrate the development with its landscape setting and
ensure the development does not visually impact on the vegetated skyline. All buildings
shall utilise the finishes palette detailed on Plan 7038- DA14 Issue 03 Dated 22.07.2016.
The use of paint finish Taubmans Tahira White is to be minimised.
Applicant’s requested change
To reflect the colours and finishes palette submitted as part of the change request the applicant
requests the condition be amended to:
8. The development’s external colour scheme shall use muted environmental tones of
browns, greens and greys to integrate the development with its landscape setting and
ensure the development does not visually impact on the vegetated skyline. All buildings
shall utilise the finishes palette detailed on Plan 7038- DA14 Issue 05 Dated 06.06.2017.
The use of paint finish Taubmans Tahira White is to be minimised.
Assessment
The colours and finishes palette provides for exactly the same colour finishes as previously
approved – the only change relates to the issue number and the date on the plans. Accordingly
this minor change is supported.
Condition 12
12. The development must comply with the Bushfire Hazard Assessment and Management
Plan AC1345BFIRE Rev.1, Duke Environmental Letter dated 25/10/2016 and Fire and
Evacuation Management Plan 7043/DA28 contained in the Parc Noosa Bushfire
Management Plan and Evacuation Plan for Owners and Tenants. Certification of
compliance with this condition must be provided to Council prior to occupation of each and
any stage of the development.
Applicant’s requested change
A minor redesign of the development along the eastern boundary is intended in relation to the
driveway alignment to maximise opportunities for the retention of a significant tree on this
boundary. It is acknowledged that retention of the tree will result in a reduced building setback to
a potential bushfire hazard, and the existing Bushfire Management Plan will need to be updated
to confirm this is achievable from a bushfire management perspective.
As noted previously, despite significant effort being made, it is not certain that the tree can be
retained in the longer term. As a result, we request that the approval condition provides flexibility
to allow for an updated Bushfire report to be provided at the appropriate time, if the retention of
the tree proves successful.
In this regard, we suggest the following condition:
Prior to the lodgement of an OPW application for Stage 9A, submit a revised Bushfire
Management Plan to confirm that bushfire management measures are satisfactory.
Page 70 of 168
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.