Environmental Noise Report · MCU13/0064

of 23

Text shows just the words. Original shows the document exactly as it was published.

The site is connected to telecommunications, water, and electricity infrastructure networks with
onsite sewer treatment and disposal. All access to the site is by boat from the Noosa River and these
can moor at the islands jetty.

1.2 Proposal

The proposal is to operate the existing site facilities as a ‘boutique resort’. No new buildings,
structures or site works are required for the proposal. The ‘boutique resort’ will operate within the
existing development comprising the following:

          guest lounge
          island bar and dining
          kitchen and storerooms,
          bedroom wing
          bungalows (comprising 2 bedrooms each)
          caretakers/staff dwelling
          wastewater treatment plant.

Recreational facilities include a pool, tennis court and boat shed.

Staff are either dropped off at Noosa Marina, carpool with the general manager or park near the
Moorindil Street boat ramp.

A central bin store is currently located on site and will continue to be utilised. The bin storage area is
located under the boat shed and accommodates 6 x 75 L plastic bins with latched lids. Waste is
removed from the site daily via the barge. The general manager’s vehicle is used to transport the
waste from the barge to the dump.

MRG were advised of operational hours for various site aspects as shown in Table 1.1.

                                          Table 1.1: Typical Site Operations
Activity                        Daytime                      Evening             Nighttime
                                (7 am to 6 pm)               (6 pm to 10 pm)     (10 pm to 7 am)
Bar/Dining                                                      
Day room                                                                        (rarely)
Media Room                                                                      (rarely)
Pool                                                                            (rarely)



1.3 Emergency Power

Emergency power will be supplied by an onsite generator. The generator is a Wasp Diesel 110 kVA
Model #WDJD110. MRG were advised that the generator was used during construction and as yet
has not been required to provide emergency power for resort operations. The generator is tested
periodically to confirm it is operating well.



0023-R1-01 KHA Makepeace Island Noise Impact Assessment Report                                           2
Report
Makepeace Island (Operations) Pty Ltd | 0023

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Environmental Noise Report.pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.